• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/38

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

38 Cards in this Set

  • Front
  • Back
WHAT IS COVERED IN THE NAVAIR 13-1-6.1-1 CHAPTER 4?
THE LR-1.
A ONE MAN LIFE RAFT ASSEMBLY
WHAT IS COVERED IN THE NAVAIR 13-1-6.1-1 CHAPTER 8?
THE MK-4 OR (LRU-12)
A 4 MAN LIFERAFT ASSEMBLY
WHAT IS COVERED IN THE NAVAIR 13-1-6.1-1 CHAPTER 9?
THE LRU-13.
A 7 MAN LIFE RAFT ASSEMBLY
WHAT IS COVERED IN THE NAVAIR 13-1-6.1-1 CHAPTER 13?
THE LRU-33/A
A 20 MAN LIFE RAFT ASSEMBLY
THE LR-1 IS A _____MAN LIFE RAFT
NAVAIR 13-1-6.1-1 CH 4

IT IS A ONE MAN LIFERAFT
THE LR-1 IS A liferaft constructed of_________coated cloth
NAVAIR 13-1-6.1-1 CH 4

polychloroprene
THE LR-1'S weathershield is nonspecular ____ BLUE IN COLOR ON THE OUTSIDE AND BRIGHT___ INSIDE
NAVAIR 13-1-6.1-1 CH 4
SEA BLUE
BRIGHT RED
The LR-1 liferaft assembly is inflated either manually by pulling the inflation assembly actuating lanyard or?
NAVAIR 13-1-6.1-1 CH 4
by gravity drop on kit actuation
(WHEN INSTALLED IN SEAT KIT)
LR-1 RIPCORD PINS ARE SAFETY TIED INTO CONES WITH WHAT SIZE THREAD?
NAVAIR 13-1-6.1-1 CH 4

E THREAD SINGLE
LR-1 Measure time of inflation; liferaft shall inflate
to design shape without evidence of restriction in less
than?
NAVAIR 13-1-6.1-1 CH 4

ONE MINUTE
LR-1 HOW MANY POUNDS DO U USE FOR THE CABLE PROOF LOAD TEST?
NAVAIR 13-1-6.1-1 CH 4

50 POUND
WHAT PSIG DO YOU INFLATE THE LR-1 TO FOR VISUAL TEST?
NAVAIR 13-1-6.1-1 CH 4

1.0 PSIG
THE LR-1'S weight of CO2 is 0.50 lbs. +- WHAT
NAVAIR 13-1-6.1-1 CH 4

± 0.01 LBS
LR-1 LEAK TEST FILL TO 2.0 PSIG WAIT 15 MIN RECORD TEMP, BARO,AND ALLOW RAFT TO REMAIN UNDISTURBED FOR HOW LONG?
NAVAIR 13-1-6.1-1 CH 4

4 HOURS
LR-1 After a minimum of 4 hours Test pressure shall
not decrease to less than????
NAVAIR 13-1-6.1-1 CH 4

1.6 psig from a maximum
test pressure of 2.0 psig
LR-1 Tighten coupling nut to liferaft inlet valve to a torque value of??
NAVAIR 13-1-6.1-1 CH 4
85 ± 5 in-lb
LR-1 Prepare solution of detergent (MIL-D-16791)
consisting of 1/4 to 1/2 ounce of detergent per???
NAVAIR 13-1-6.1-1 CH 4

GALLON OF WATER
Liferafts shall be considered beyond repair for??
NAVAIR 13-1-6.1-1 CH 4

Holes or abrasions exceeding 2 inches in length
LR-1 Toluene shall be the primary solvent used in the fabrication or repair of this assembly._______ may be used if Toluene is not
available
NAVAIR 13-1-6.1-1 CH 4

MEK
ONCE PATCH IS COMPLETED Allow adhesive to cure a minimum of ___ hours
NAVAIR 13-1-6.1-1 CH4

48 HOURS
LRU-12/A
IS A HOW MANY MAN LIFE RAFT?
NAVAIR 13-1-6.1-1 Ch8

4 MAN
LRU-12/A
HOW IS THE SEAT INFLATED?
NAVAIR 13-1-6.1-1 Ch8
manually inflated
through a topping-off valve
LRU-12/A
The Special Inspection shall be performed on
fuselage-installed liferafts every?
NAVAIR 13-1-6.1-1 Ch8

30 DAYS
LRU-12/A
WHAT IS THE MAX DROP IN PRESSURE ALLOWED IN THE 4 HOUR PERIOD OF THE LEAK TEST?
NAVAIR 13-1-6.1-1 Ch8

0.40PSIG
LRU-12/A
Tighten coupling nut to raft inlet manifold to
a torque value of??
NAVAIR 13-1-6.1-1 Ch8

145 ± 5 in--lb.
LRU-12/A

Thread inflation valve onto cylinder and tighten
to a torque value of ?
NAVAIR 13-1-6.1-1 Ch8

135 ± 10 ft--lb.
LRU-12/A
Tighten safety plug on A-128/871444 to ______of torque.
NAVAIR 13-1-6.1-1 Ch8

29 ft-lb
LRU-12/A

Immerse inflation assembly in water tank and
observe for a minimum of ?
NAVAIR 13-1-6.1-1 Ch8

of 5 minutes checking for
leaks.
LRU-12/A
Cut a rounded patch ______inches larger than
the damage on all sides.
13-1-6.1-1 CH 8

ONE AND A HALF
LRU-12/A
Scallop edges of patch if it is larger than ________inches in diameter
13-1-6.1-1 CH 8

5 inches in diameter
LRU-13/A
IS A _______MAN LIFERAFT
NAVAIR 13-1-6.1-1 CH 9

SEVEN MAN LIFERAFT
LRU-13/A
SPECIAL INSPECTION SHALL BE PERFORMED EVERY?
NAVAIR 13-1-6.1-1 CH 9

30 DAYS
LRU-13/A
WHAT RADIO IS INSTALLED IN LIFERAFT?
NAVAIR 13-1-6.1-1 CH 9

AN/URT-33A
LRU-33/A
IS A ____MAN LIFERAFT
13-1-6.1-1 CH 13
20 MAN
LRU-33/A
liferaft is constructed
of? urethane-coated nylon with thermo-bonded seams
13-1-6.1-1 CH 13
urethane-coated nylon with thermo-bonded seams
LRU-33/A
The LRU--33/A is only authorized for use in __________ wing stowage compartments.
13-1-6.1-1 CH 13

C--130 (Series)
LRU-33/A
Verify the charge in the carbon dioxide cylinder
by checking the sight gage located on the valve. The
indicator should be in the?
13-1-6.1-1 CH 13
GREEN
LRU-33/A
WHAT DO U DO FOR THE 3 YEAR INSPECTION
13-1-6.1-1 CH 13
RETURN TO MANUFACTURE