• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

PPE Costs

1. Purchase, duties, unrecoverable, net of rebates


2. Cost to bring to location and conditions for us


3. Major inspections


4. Major spare parts


5. Standby or servicing equipment


6. ARO/ dismantling


Land and building costs include commissions, legal fees, cost to make asset useable, and allocate cost separately between land and building **

PPE Depreciation

1. Straight line (Cost-Residual/useful)


2. Units of production ((cost-residual)/estimated productive outputs)) * units produced


3. Decline Method (Cost-Acc dep.) * declining rate


**remember for calculation, start at cost, doesn’t include residual

Revaluation Model (IFRS only)

1. Gains recognized first to net income up to previous loss then to OCI


2. Losses recognized first to OCI then remainder in net income