10 Cards in this Set

  • Front
  • Back
What are the components of the technical management process?
- Technical Planning

- technical assessment


- technical data management


- requirements management


- risk management


- configuration management


- interfacemanagement


- decision analysis






List the steps in the technical process, using the defense acquisition guide to the engineering process?
-stakeholders requirements definition

-Requirements analysis


-architecture design


-implementation


-integration


-verification


-validation


-transition



What documents are used to define stakeholders requirements?
-CONOPS

-ICD


-DRAFT CDD





What's a key event during the technical assessment that ensures a common understanding exist for requirements?
-System requirements review
What does the purpose of a functional flow block diagram (FFBD)?

A functional analysis technique that:

-Shows the logical and sequential relationships

-shows the network of actions and the logical sequence

What are the three evolving technical baselines and when will they likely occur?
-Functional Baseline ~ System Functional Review

-Allocated Baseline ~ Technical Reviews


-Product Baseline ~ Preliminary Design Reviews and Critical Design Reviews

What are the primary efforts during implementation?
-detailed design down to the lowest system elements and the realization of fabricating them into actual products
Verification occurs, when?
-through all phases
What does validation ensure?
-System meets user requirements (i.e. MoE and MoP)
What the purpose of transition?
-focuses upon the operational integration (tech manuals, training, maintenance plans, etc.)