Which of the following is not a quality control procedure? |
D. None of the above |
|
An assurance report submitted every quarter of the month |
CQCA |
|
What is not required in conducting nuclear density test? |
Use a calibrated sand |
|
Which of the following is not a responsibility of a materials engineer? |
Setting sched for delivery of materials |
|
Where should the Contractor’s Material’s Engineer directly report? |
Contractors project engineer |
|
lt means to regulate: |
Control |
|
lt means excellence |
Quality |
|
Which of the following are documents is prepared by a materials engineer? |
Mat. Logbook |
|
compaction of an embankment is 80% which below the required compaction. As a materials engineer, what should you do? |
Use rollers with high compactive effort |
|
minimum testing apparatus requirements are necessary for _______ contractors. |
AOTA |
|
Which of the following is not the job for a materials engineer? |
Survey and measure line and grade at site |
|
During construction of a road project, if all the materials to be used are tested for quality, inspection is no longer required |
False |
|
he physical and engineering properties of soils may be improved by: |
Both a and b |
|
The density to which a soil can be compacted is related to |
Aota |
|
As a Materials Engineer, what will you do with major honey-combed area that is considered as defective work? |
Remove and replace at the expense of the contractor |
|
lf the strength of control specimen does not meet the requirement Materials Engineer what will be your decision? |
Remove and replace |
|
Specifies the minimum number of tests required for an item of work which corresponds to the quantities stated in the approved Program of Work of a project |
Quality Control program |
|
Prescribed in each project based on estimated quantities. The requirements specify the kind and number of test for each item of work: |
Minimum testing requirements |
|
It shall have at least a minimum dimension of ___ sq. m. for a district laboratory and ____ sq. m. for regional laboratory and shall contain the required testing apparatus/equipment, supplies, furnishings required by the work. |
10,20 |
|
All samples should be submitted with the corresponding ______ |
Sample card |
|
Refers to the process of determining the degree of compliance of delivered or constructed materials with the specification |
Materials testing |
|
The basis of acceptance or rejection of any construction materials? |
Mills certificate |
|
The monthly materials status report is submitted to DPWH on or before:
|
25th day of the month |
|
A joint which controls the location of transverse crack and permits the slab to contract and expand with changes in temperature? |
Contraction joint |
|
Materials shall be obtained from approved materials sources and should be known in advance |
True |
|
The accomplishment of Quality control logbook is prepared by: |
Materials engineer |