• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/35

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

35 Cards in this Set

  • Front
  • Back

JIT is applies to

Both the manufacturing and service organizations

JIT considers waste anything that

does not add value

The broad view of JIT is now often termed

Lean production

What is a characteristic of the JIT philosophy?

Elimination of waste

JIT flexibility refers to

workers being able to perform many different tasks

By focusing on __________ processes, JIT is ableto achieve high-volume production of high-quality, low-cost products.

Value-Added

JIT is a __________ system.

Pull

According to JIT, __________ is carried to coverup a wide variety of problems, such as poor quality, demand uncertainty, andslow delivery.

Inventory

An important TQM concept is that quality isdefined by the

Customer

JIT considers __________ to be a company’s mostprecious resource.

People

In JIT the workforce is viewed as

A long-term asset

__________ are groups of workers who areresponsible for every aspect of their business.

Self-managed teams

In JIT a Kanban card is used to signal

the need for more parts

The number of kanbans orcontainers needed at a workstation is dependent on all except which of the following?

the number or workers

Forecasting is not a function which contributesto:

deciding how bonuses should be allocated

The first step in forecasting is:

decide what to forecast

Qualitative forecasting methods

are made subjectively by the forecaster

Under whichforecasting method does a group of managers meet to generate a forecast?

executive option

Whichforecasting method seeks to develop a consensus among a group of experts?

Delphi method

One quantitative forecasting models limitationis

theyare limited on the quality of available data

Which forecasting method is particularly goodfor predicting technological changes

Delphi method

Whichforecasting method is particularly good for determining customer preferences?

Market research

Which of the following is not considered to beone of the four basic patterns of time series data?

Vertical

Which of the following is a reason capacity andlocation decisions are usually made simultaneously?

the size of a new facility may affect itslocation

The maximum output that can be achieved by afacility is ____________.

Capacity

Capacitydecisions at the strategic level include ____________________.

investmentin new facilities and equipment

Ifcapacity is excessive, a company may have to ______________________.

decide how to use a partially empty facility

Anexample of an input measure of capacity is _____________________.

floor space in square feet

Which of the following is not a measure of output capacity?

labor hours consumed

Which of the following does not contribute to the sustainability of design capacity?

scheduled machine maintenance

The maximum output rate that can be sustainedunder normal conditions is _______________________.

effective capacity

The ratio of actual output rate to capacity is____________________________.

utilization

The best operating level is the volume of output that results in the____________________.

lowest average unit cost

The concept of diseconomies of scale ________________________.

states that the average cost of a unit producedis reduced when the amount of output increases

_____________________ facilities may not be the best approach in today’sbusiness environment that has short product and technological life cycles andin which flexibility is more important than ever before.

Self operating???