Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
35 Cards in this Set
- Front
- Back
JIT is applies to |
Both the manufacturing and service organizations |
|
JIT considers waste anything that |
does not add value |
|
The broad view of JIT is now often termed |
Lean production |
|
What is a characteristic of the JIT philosophy? |
Elimination of waste |
|
JIT flexibility refers to |
workers being able to perform many different tasks |
|
By focusing on __________ processes, JIT is ableto achieve high-volume production of high-quality, low-cost products. |
Value-Added |
|
JIT is a __________ system. |
Pull |
|
According to JIT, __________ is carried to coverup a wide variety of problems, such as poor quality, demand uncertainty, andslow delivery. |
Inventory |
|
An important TQM concept is that quality isdefined by the |
Customer |
|
JIT considers __________ to be a company’s mostprecious resource. |
People |
|
In JIT the workforce is viewed as |
A long-term asset |
|
__________ are groups of workers who areresponsible for every aspect of their business. |
Self-managed teams |
|
In JIT a Kanban card is used to signal |
the need for more parts |
|
The number of kanbans orcontainers needed at a workstation is dependent on all except which of the following? |
the number or workers |
|
Forecasting is not a function which contributesto: |
deciding how bonuses should be allocated |
|
The first step in forecasting is: |
decide what to forecast |
|
Qualitative forecasting methods |
are made subjectively by the forecaster |
|
Under whichforecasting method does a group of managers meet to generate a forecast? |
executive option |
|
Whichforecasting method seeks to develop a consensus among a group of experts? |
Delphi method |
|
One quantitative forecasting models limitationis |
theyare limited on the quality of available data |
|
Which forecasting method is particularly goodfor predicting technological changes |
Delphi method |
|
Whichforecasting method is particularly good for determining customer preferences? |
Market research |
|
Which of the following is not considered to beone of the four basic patterns of time series data? |
Vertical |
|
Which of the following is a reason capacity andlocation decisions are usually made simultaneously? |
the size of a new facility may affect itslocation |
|
The maximum output that can be achieved by afacility is ____________. |
Capacity |
|
Capacitydecisions at the strategic level include ____________________. |
investmentin new facilities and equipment |
|
Ifcapacity is excessive, a company may have to ______________________. |
decide how to use a partially empty facility |
|
Anexample of an input measure of capacity is _____________________. |
floor space in square feet |
|
Which of the following is not a measure of output capacity? |
labor hours consumed |
|
Which of the following does not contribute to the sustainability of design capacity? |
scheduled machine maintenance |
|
The maximum output rate that can be sustainedunder normal conditions is _______________________. |
effective capacity |
|
The ratio of actual output rate to capacity is____________________________. |
utilization |
|
The best operating level is the volume of output that results in the____________________. |
lowest average unit cost |
|
The concept of diseconomies of scale ________________________. |
states that the average cost of a unit producedis reduced when the amount of output increases |
|
_____________________ facilities may not be the best approach in today’sbusiness environment that has short product and technological life cycles andin which flexibility is more important than ever before. |
Self operating??? |