• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/16

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

16 Cards in this Set

  • Front
  • Back
What directive contain information on Operational Risk management (ORM)?
OPNAVINST 3500.39 (series).
What is an effective provess for maintainng readiness in peacetime and achieving success in combat without infringing upon the prerogatives of the commander?
Operational Risk management (ORM).
What is a decision making process that enhances operational capability?
Operational Risk management (ORM).
What is meant by the ORM term "risk"?
An expression of possible loss in terms of severity and probability.
What is meant by the ORM term "hazard"?
A conditionwith the potential to cause personal injury or death, property damage or mission degradation.
Operational Risk management (ORM) is intergrated into what levels of a command?
All levels of the command.
What is meant by the ORM term "risk management"?
The process of detecting hazards and assessing associated risks.
What is meant by the ORM term "ORM"?
The process of dealing with risk associated within military operations, which includes risk assessment, risk decision making and implementation of effective risk controls.
What are the five steps of the Operational Risk management (ORM) process?
1-Identify hazards, 2-asess hazards, 3-make risk decisions, 4-iplement controls, 5-supervise.
What are the three ORM Process Levels?
1-Time critical, 2-deliberate, 3-in-depth.
What level of the ORM proess is employed by experienced personnel to consider risk while making decisions in a time-compressed situation?
The time critical level.
What level of the ORM process uses primarily experience and brainstorming to identify hazards and develop controls (and therefore is most effetie when done in a group)?
The deliberate level.
What level of the ORM process is used to more thorougly study the hazzards and their associated risk in a complex operation or system, or one in which the hazards are not well understood?
The in-depth level.
What are the four principles of ORM?
1-accept risk when benefits outweigh the cost, 2-accept no unnecesary risk, 3-accept no unnecessary risk, 4-anticipate and manage risk by planning , and make risk decisions at the right level.
What is the goal of Operational Risk management (ORM)?
Not to eliminate risk, but to anage the risk so that the mission can be accomplished with the minimum amount of loss.
When does a leader, responsible for executing a mission, elevate the decision to their chain of command?
When the leader determines that the risk associated with theat mission CANNOT be controlled at his/her level, or goes beyond the commander's stated intent.