Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
7 Cards in this Set
- Front
- Back
The proposed initiative |
I recognize those proposed initiative in a discuss last night was great. |
|
Temporarily interrupted |
Though those proposed initiative was great but the project have to be temporarily interrupted |
|
Delegation of task |
Delegating task is something every project manager needs to be good at. |
|
Be equally divided |
This meal is equally divided |
|
The scope of the new contract |
It is beyond the scope of my knowledge |
|
Calculate precisely the farm's irrigation needs |
Calculate precisely leading to good results. |
|
Adopt higher standards |
For last year faults so we temporarily adopt higher standards. |