• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/7

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

7 Cards in this Set

  • Front
  • Back

The proposed initiative

I recognize those proposed initiative in a discuss last night was great.

Temporarily interrupted

Though those proposed initiative was great but the project have to be temporarily interrupted

Delegation of task

Delegating task is something every project manager needs to be good at.

Be equally divided

This meal is equally divided

The scope of the new contract

It is beyond the scope of my knowledge

Calculate precisely the farm's irrigation needs

Calculate precisely leading to good results.

Adopt higher standards

For last year faults so we temporarily adopt higher standards.