15 Cards in this Set

  • Front
  • Back

A trench is a narrow excavation in which the depth is greater than the width and the width is no greater than ______.



A. 10 feet


B.15 feet


C. 25 feet


D. 30 feet

B. 15 feet

One cubic yard of earth weighs approximately ______ pounds.



A. 1,000


B. 2,000


C. 3,000


D. 4,000

C. 3,000

Flooding is considered a trenching hazard.



A. True


B. False

A. True

Dry sandy soils tends to _____.



A. Slab off


B. Crack


C. Collapse


D. Stay in place

B. Crack

Tools and equipment must be kept at least ______ from the edge of a trench .



A. 1 foot


B. 2 feet


C. 3 feet


D. 4 feet

B. 2 feet

In any trench that is over 4 feet deep, ladders and Ramos used as exist in a trench must be located every ______.



A. 10 feet


B. 15 feet


C. 20 feet


D. 25 feet

D. 25 feet

Shoring, sloping, or other acceptable protections should be used to guard the walls of all excavations more than _____ deep.



A. 1 foot


B. 3 feet


C. 4 feet


D. 5 feet

D. 5 feet

Which of the following is not a form of protection for workers in trenches??



A. Shoring


B. Sloping


C. Benching


D. Vertical walls

C. Benching

The most common hazard during an excavation is _____.



A. A cave-in


B. An electrical strike


C. A fall


D. Flooding

A. A cave-in

Always install shoring from ______.



A. The top of the trench


B. The bottom of the trench


C. Inside the shoring


D. The side of the trench slope

A. The top of the trench

The sides of a simple trench in type c soil should be sloped at a ____ angle from the horizontal.



A. 3/4 to 1


B.1 to 1


C. 1 1/2 to 1


D. 2 to 1

C. 11/2 to 1

An information stake next to the surveyors bench mark tells the distance _______.



A. Down to the flow line of the pipe


B. Down to the bottom of the trench


C. Down to the center line of the pipe


D. To the other side of the trench


A. Down to the flow line of the pipe

To determine the grading of a pipeline from top to bottom , the pipe fitter ties a string between two _______.



A. Grade pins


B. T- bars


C. Information stakes


D. Grade rods

A. Grade pins

Because the information stake shows the invert elevation of the pipeline, you need not consider the thickness of the pipe wall or the bedding to dig the trench.



A. True


B. False

B. False

Slicing of backfill should be started when the backfill is about _____ of the pipe.



A. Half-way to the top


B. One-third of the way to the top


C. At the top


D. One-quarter of the way up from the bottom

One-quarter of the way up from the bottom