• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/50

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

50 Cards in this Set

  • Front
  • Back
When making a multiple crane lift it is important for the operator to understand that:
The weight may increase if the other crane lands the load
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will:
Increase
Most crane manufacturers reduce load capacity for duty-cycle operations because:
Side loading forces may occur
On who’s recommendations should a preventative maintenance program be set-up:
Crane manufacturer ANSI 5-2.3 (a)
What is the standard rope used on most cranes?
right regular lay
The proper way to calibrate a boom angle indicator is:
Using a level, raise the boom to horizontal and set the indicator a 00
The red area of an instrument gauge means:
a dangerous condition exists
The best way to keep people from being injured from the counterweight of the crane is to:
Fence or barricade the swing area of the crane OSHA and ANSI
Only approved attachments or extra counterweights made by the manufacturer should be placed on the rear of crane because:
they could cause a backward stability problem
What is the first thing an operator should do before going under a low pipe rack?
Post a signalperson to check clearance
When working on outriggers, the only time they should be less than fully extended is when:
there is a load chart for this operation
When lifting loads from the water, the operator should be aware that:
the load will increase when you pick the load from the water
What is required to be on a Hydraulic Crane in order for it to lift a manbasket?
Boom length indicator
When working on rubber, cranes are rated at what percentage of tipping?
75%
When using cable or nylon spreaders it is important to remember:
The lower the spreader angle the greater the tension
Backward stability of a crane is tested with:
Basic boom at maximum angle with no load
If not listed in the load\capacity charts for a hydraulic crane and you are in between boom lengths, you should:
use the next longer length
When a spinning load presents a danger, the operator should:
Use a tagline
The jib capacity is 8 tons and the ball weighs 900 lbs. What is the heaviest load that can be lifted safely?
15,100 LBS
Parts of line means:
the number of lines running thru the load block
If a jib is erected but not being used, it is treated as a deduction from the cranes:
Gross capacity
What is the maximum number of broken wires acceptable before replacement on a standing wire rope?
2 OSHA & ANSI
What are most jib’s capacities based on?
Structural
On the majority of conventional cranes the power is transferred to the torque converter by a:
Master Clutch
During disassembly of a long boom, the hog lines are connected at the maximum cantilever point and the boom is slightly lifted off the ground. Which pins are to be removed next?
The bottom pins ahead of the cantilever point (IPT Manual)
When using load\capacity charts, what does the term “jib angle to ground” refer to?
Main boom angle minus the jibs offset
A truck crane, with outriggers properly set, is rated at what percentage of its tipping capacity?
85% ANSI 5-1.1.1
On a truck crane with the outriggers extended and set, and tires touching the ground, the operator should refer to what load chart?
on rubber chart
When testing a manbasket how long must the test pick be maintained?
5 minutes
What is the minimum pitch diameter for load hoisting sheaves?
not less than 18 times rope diameter (ANSI) 5-1.7.5(b)
What is the minimum pitch diameter for boom hoisting sheaves?
not less than 15 times rope diameter (ANSI) 5-1.7.5(a)
What is the minimum pitch diameter for load block sheaves
not less than 16 times rope diameter (ANSI) 5-1.7.5(c)
Seat belts shall be provided on what cranes?
Cherry Pickers (ANSI) 5-1.8(e)
Power is transferred to the swings through a:
Pinion gear
LMIs shall be installed on cranes with a lifting capacities of:
LMIs shall be installed on cranes with a lifting capacities of:
When lifting personnel the cranes hook must be the type that:
Can be closed and locked (OSHA)1926 (g)(4)(iv)(B)
When working over water with a manbasket are the people inside required to wear a belt/harness?
no
What is the maximum advisable wind speed for crane operation?
30 mph Mobile Crane Manual Pg. 173
When working near powerlines, where should caution stickers be installed?
At operator’s station and on the outside of the crane. (ANSI) 5-3.4.5.3(i)
Jib back lash, how much is allowed?
5 degrees OSHA
Cranes must be level to within ____% grade
1% OSHA
A frequent inspection is
Daily to monthly (OSHA) 1910.180 (d)(2)(i)
A periodic inspection is:
Monthly to annually (OSHA) 1910.180 (d)(2)(ii)
Test loads shall not exceed _______ of manufacturers load ratings
110% (ANSI) 5-2.2.2(1)
Cranes idle for more than 6 months must have_________________ inspections performed.
Frequent and Periodic (ANSI) 5-2.1.4(b)
Cranes idle for less than 6 months, must have what type inspection performed.
Frequent
Cranes lifting personnel platforms must have an inspection performed every:
Day (OSHA)
Crane hooks must not be twisted in excess of:
10 degrees (OSHA) 1910.180 (d)(3)(v)
A Crane hooks throat opening must not exceed:
15% of its original size (OSHA) 1910.180 (d)(3)(v)
What is the Jib Offset?
Jib angle to the boom