FBRs must be serialized and submitted by the 3M coordinator within 15 days of receipt.
• True • False |
False
|
|
The location block of an EGL, showing 4 Deck Drains in the same space will display: Noun Name of the space ( Chart House)
a) Space number (01-147-O-L) b) 4 c) All of the above |
a) Space number (01-147-O-L)
|
|
The Division Officer is responsible for reviewing MRCs and ensuring all EGLs are accurate.
• True • False |
• False
|
|
The serial number block of an EGL showing three valves will show what?
a) 3 b) “Valve 1”, “Valve 2” etc. c) ALP-124, SW-216, CW-207 d) None of the above. |
c) ALP-124, SW-216, CW-207
|
|
Who is the commands 3M manager?
a) Commanding Officer 3M Coordinator b) Type Commander c) Executive Officer d) 3M coordinator |
c) Executive Officer
|
|
Resubmit a feed back report if it is over _____ year(s) old.
a) 4 b) 3 c) 2 d) 1 |
d) 1
|
|
Superseded Cycle schedules will be kept for how long?
a) 6 years b) 4 years c) 2 years d) 1 year |
d) 1 year
|
|
What was developed to reduce PMS requirements during overhauls, availabilities, and other extended periods of equipment inactivity.
a) IEM b) PMS c) POM d) PSA |
a) IEM
|
|
On the quarterly schedule, how do you indicate start and stop of IEM?
a) Draw a vertical line in green all affected MIPs b) Draw a vertical line in blue all affected MIPs c) Draw a vertical line in red all affected MIPs d) Draw a vertical line in red all MIPs |
c) Draw a vertical line in red all affected MIPs
|
|
The purpose of the CSMP is to provide shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship?
• True • False |
True
|
|
Instructions for the preparation of a PMS feedback reports are found on the reverse of OPNAVINST 4790/7B green page.
• True • False |
• True
|
|
Technical review activities of Urgent FBR shall provide a preliminary response to the originator within 1 working day of receipt.
• True • False |
• True
|
|
A slash (/) on the LOEP denotes MIP issued and not as part of the force revision?
• True • False |
• True
|
|
What are the three components of a JCN (Job Control Number)?
a) JSN-NSN-WC b) UIC-WC-JSN c) EIC-APL-UIC d) IEM-WC-EIC |
b) UIC-WC-JSN
|
|
Qualified Personnel are assigned by name for each MR scheduled on the weekly schedule.
• True • False |
• True
|
|
What type of maintenance action ensures that equipment is in a condition suitable for operation or to reactivate an equipment of system that has been inactivated for a prolonged period?
a) Start-Up Maintenance (SU) b) Lay-Up Maintenance (LU) c) Operational Maintenance (OT) d) Periodic Maintenance (PM) |
b) Lay-Up Maintenance (LU)
|
|
What provides detailed procedures for performing maintenance requirements?
a) LOEP b) FR c) MIP d) MRC |
d) MRC
|
|
When conducting a Spot Check, the maintenance person must present all correct tools, parts, materials and test equipment IAW what reference?
a) PMS CD ROM b) LOPE c) SPMIG d) HMUG |
c) SPMIG
|
|
In the “Each Quarter” column of the Cycle schedule the following MR are listed:
a) 2W, 3W … b) M, 2M, Q c) All Situation Requirements d) All of the above |
d) All of the above
|
|
The type of Feed Back Reports are:
a) Category A b) Category B c) Urgent d) All of the above |
d) All of the above
|
|
Situation requirements are documented on the front of the quarterly board:
a) After the MRC is accomplished b) After the situation has occurred c) As soon as the situation is known d) At the beginning of the quarter |
a) After the MRC is accomplished
|
|
Who is responsible for scheduling weekly PMS and supervising its accomplishment?
a) LCPO b) Division Officer c) Department Head d) Work Center Supervisor |
d) Work Center Supervisor
|
|
The calendar located at the top of the Quarterly board is used to determine?
a) Underway periods b) In-port periods c) Stand-down periods d) Availability periods |
a) Underway periods
|
|
A vertical RED line drawn on a MIP located on your Cycle board represent the start and stop periods of IEM?
• True • False |
True
|
|
What is used to provide amplifying instructions to a Work Candidate?
a) Completed 2K b) Deferral 2K c) 4790/7B d) 4790/2L |
d) 4790/2L
|
|
What Windows application automates the PMS scheduling process, generates Cycle, Quarterly, and Weekly schedules as well as EGLs, TGLs, RARs and ACFs.
a) PMS CD-ROM b) Microsoft Word c) SKED2 d) OMMS-NG |
c) SKED2
|
|
A maintenance person can have a “not accomplished” PMS check and still receive a “fully accomplished” on a spot check.
• True • False |
• True
|
|
IAW the Joint Fleet Maintenance Manual, the maintenance person must prove they are fully qualified to perform the MRC during a Spot check.
• True • False |
• True
|
|
Quarterly schedules begin on the first Monday of _________?
a) February, May, August, November b) March, June, September, December c) January, April, July, October d) None of the above. |
c) January, April, July, October
|
|
OPNAVINST 4790.4C provides guidance for 3M policies and procedures?
• True • False |
• True
|
|
All current COMNAVSURFLANT PMS Notes are required to be in the work centers 43P1.
• True • False |
True
|
|
Start-Up maintenance action prepares the equipment for periods of prolonged idleness, and are usually performed only once at the beginning of the inactive period?
• True • False |
False
|
|
On the record of change page of the 43P1, the date of change is always the first Monday of the quarter that the change takes effect.
• True • False |
True
|
|
The Work Center Supervisor is responsible for prompt documentation of deficiencies and Man Hour usage for all corrective maintenance.
• True • False |
• True
|
|
Equipment in IEM that is directly subject to corrective maintenance, overhaul or removal for safe storage/replacement is classified as what status?
• Status IV • Status II • Status III • Status I |
Status II
|
|
Who is responsible for rescheduling any circled requirements still within periodicity and for determining the reason for a maintenance action not being accomplished?
a) Work Center Supervisor b) Department 3M Assistant c) 3M Coordinator d) Division Officer |
d) Division Officer
|
|
The acronym CSMP stands for what?
a) Current Ships Maintenance Project b) Computer Self Maintained Printout c) Computer System Maintenance Program d) Comprehensive Ships Minimum Plan |
a) Current Ships Maintenance Project
|
|
Who approves the Cycle Schedule?
a) Department Head b) Division Officer c) Work Center Supervisor d) 3M Coordinator |
a) Department Head
|
|
According to the 3-M Manual the work center supervisor is the
a) Chief b) Senior Enlisted Person in the Work Center c) Best Leader in the Work Center d) First Class Petty Officer |
b) Senior Enlisted Person in the Work Center
|
|
Checks that have a horizontal blue line through them indicate the check was incomplete?
• True • False |
False
|
|
What type of maintenance action must be accomplished on a recurring basis during the inactive period to prevent equipment deterioration?
a) Operational Maintenance (OT) b) Lay-Up Maintenance (LU) c) Periodic Maintenance (PM) d) Start-Up Maintenance (SU) |
c) Periodic Maintenance (PM)
|
|
The Division Officer is responsible for the reviewing, signing and dating of the weekly schedule.
• True • False |
True
|
|
On the cycle schedule, how are additional MIP line items displayed?
a) By Location b) By equipment name c) By “EGL” d) Both a and c |
d) Both a and c
|
|
The location block of a MRC will have:
a) 03-166-O-Q b) “EGL ATTACHED” (EGL stapled to the MRC) c) “LGL ATTACHED” (LGL stapled to the MRC) d) Any of the above |
d) Any of the above
|
|
Advanced Change Notices (ACN) and PMS Feedback Reports (FBR) are retained in the 43P1 for how long?
a) Until the next Force Revision. b) Life of the Work center. c) One year from origination date. d) Until revision documentation is received. |
d) Until revision documentation is received.
|
|
The amount of items listed on an EGL is no more that 8 hours.
• True • False |
False
|
|
When reviewing the Quarter Schedule, the #R-1 of S-1(#R-1) denotes what?
a) R-1 is a convince MRC for S-1 b) R-1 is mandatory for the completion of S-1 c) S-1 has nothing to do with R-1 d) None of the above |
b) R-1 is mandatory for the completion of S-1
|
|
A Maintenance Person is responsible for all Hazard Material and PPE IAW:
a) HMUG b) MSDS c) a and b d) None of the above |
c) a and b
|