• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/33

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

33 Cards in this Set

  • Front
  • Back
How many men can the LR-1 hold?
1 man
What type of inflation assembly does the LR-1 have?
FLU-6/P or modified FLU-6/p
The liferaft consist of a _______ floor?
non-inflatable
The liferaft consist of a _______ flotation tube.
single compartment
What color is the LR-1?
Blue
What does the LR-1 consist of?
weathersheild,
sea anchor,
sea anchor pocket,
retaining line pocket,
balistic bag
What color is the weathersheild?
blue outside and bright red inside
How is the LR-1 inflated?
manually by pulling the inflation assembly

automatically by gravity drop kit actuating
What does the inflation assembly inflate?
flotation tube
After boarding the LR-1 may be topped off by using the?
Oral inflation valve
The inspection cycle on the LR-1 is when?
Aircraft in which installed in except Helo-backpack is 360 day
The first and third ripcord pins are tied with what?
one turn size E nylon single
During the functional test the liferaft shall inflate in what time?
1 min
During the Pull Cable Proof Load Test you remove pull cable from valve and apply a ______ pull force between cable ball and pull toggle?
50 pounds
During the visual inspection you inflate the raft to what?
1.0 psig
Paint over incorrect markings with what?
Water proof ink(yellow or black)
How do you obtain correct gross weight?
CO2 cylinder subtract weight of diffuser plug from total weight
The cylinder gets charged to what?
0.50+-0.01 lbs
The markings on the CO2 cylinder shall be what?
black letters
1/4 inch high
During the leak test you inflate to what?
2.0 psig
How long do you let the raft sit for leak test?
4 hours
Test pressure shall not decrease to less than_____from max 2.0psig
1.6psig
Attach retaining line to neck of cylinder with what?
larks head
You tack the larks head with what?
two turns waxed nylon 6 cord single
Tighten coupling nut to liferaft inlet valve to a torque of?
85+-5 in-lbs
You tighten the safety plug to what?
16+-1 ft-lb
Overcharging the carbon dioxide bottle by____will damage the blow-out disc?
0.05
If charge weight exceeds_______when charging remove bottle and check blow-out disk
0.56
When checking for leaks how long do you put the cylinder in water?
5 min
Holes can not exceed what?
2 inches
When patching you allow cement to cure for how long?
48 hours
How long is the sea anchor line?
16 foot type III nylon cord
Thread inflation valve onto cylinder and torque to what?
67 1/2 +- 2 1/2 ft-lb