Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
45 Cards in this Set
- Front
- Back
Volumes and titles in the NAVEDTRA 131A?
|
-Vol I Developers Guide
-Vol I Supplement -Vol II Sample Products -Vol III Managers Guide |
|
NAVEDTRA 131A
Vol I Developers Guide |
contains procedures for developing training programs and materials
|
|
NAVEDTRA 131A
Vol I Supplement |
contains Curriculum Developers Aids (CDA) that help the developer
|
|
NAVEDTRA 131A
Vol II Sample Products |
Samples of curriculum
|
|
NAVEDTRA 131A
Vol III Managers Guide |
contains management info to planning, analysis, design, development, implementation, and evaluation of curriculum.
|
|
PPP stages?
|
Pre
Core Post |
|
Describe each PPP Stage
Pre 1 |
1. Planning Stage: Id required resource requirements and sequence of events in the development process.
Output=TPP which must be approved by the CCA |
|
Describe each PPP Stage
CORE 1 |
Stage 1: determines job task, supporting skills and knowledge, and level of performance. Compilation of PPP Tables. OUTPUT=TPS
|
|
Describe each PPP Stage
CORE 2 |
Stage 2: produces the CLOs and an instructional sequence. Output=Preliminary TCCD
|
|
Describe each PPP Stage
CORE 3 |
Stage 3: produces the instructional materials for the instr and the trainee.
I.E. Trainee Guide, test, imm |
|
Describe each PPP Stage
CORE 4 |
Stage 4:conducting the pilot course. Output=Pilot course monitoring report.
|
|
Describe each PPP Stage
CORE 5 |
Stage 5:finalized curriculum and TCCD
Output=CCA letter of Promulgation |
|
Describe each PPP Stage
POST 1 |
Evaluation-internal assessment of the training materials and FCR; and
External feedback of the performance of graduates in the flt. |
|
Contents of a Training Project Plan
|
cover pg, table of contents, justification, impact statement, course data page,safety risks and hazmat exposure, curriculum development method recommended, milestone, resource requirements.
|
|
Define PPP
|
Listing of the min knowledge and skills required to operate or maintain an equipment, system of subsystem, or to perform a task or function.
|
|
Most critical element of curriculum development per NAVEDTRA 131
|
The PPP Table, because it is the basic building block for all training materials.
|
|
Training Path System outputs stage 1.
"TOS" |
Training Objective Statement
skills and knowledge to be learned by the student. Determins training requirements (what to train and to what level) |
|
Training Path System outputs stage 1.
"TLA" |
Training level Assignements
listing of all PPP line items and the level of instruction required for each. |
|
Training Path System outputs stage 1.
"TAM" |
Table Assignment Matrix
summarizes the training requirements for the PPP tables listed on the TPC by showing all TOS associated with each PPP |
|
Training Path System outputs stage 1.
"TPC" |
Training Path Chart
shows a complete training path(pipeline) which includes the TAC and PPP table index (COBRA) |
|
Contents of a Preliminary TCCD
Stage 2 "OAC" |
Objective Assignement Chart
reflects the coverage of PPP items within a curriculum |
|
Contents of a Preliminary TCCD
Stage 2 "RRL" |
Resource Requirements List
List resources needed to conduct a course |
|
Contents of a Preliminary TCCD
Stage 2 "COI" |
Curriculum Outline of Instruc.
describes the overall course outline and objectives to include the topic outlin, CLOs and TLOs. |
|
Elements of a Lesson Plan?
|
Front Matter
Parts |
|
Elements of a Lesson Plan
Front Matter? |
consists of cover page, title pg, list of effective pg, change pg, table of content, security awarness notice, haz awareness notice, how to use the lesson plan, and CLOs
|
|
Elements of a Lesson Plan
Parts? |
1.TLOs, training and instructor preparation
2. Discussion Demostation Activity (DDA) pg, discussion points (DP) and Related Instruction Activity (RIA) |
|
6 types of instruction sheets found in the trainee guide?
(OJ PAID) |
-Outline
-Job -Problem -Assignment -Info -Diagram |
|
TOS code for knowledge?
|
F-Familiarization
T-Theory |
|
TOS code for Skill?
|
M-Maintenance
C-Corrective Maint. P-Preventive Maint. O-Operation J-Task/Function/Skill S-Background/Skill |
|
TASK SET Coordinator
|
Those who coordinate the work of others (CO)
|
|
TASK SETS Director?
|
Those who direct the work of others (dept head, DIVO)
|
|
TASK SETS Performer?
|
Those who perform the hand-on work (Operator)
|
|
Types of courses listed in a Training Path Chart (TPC)
"COBRA" |
Conversion
Onboard Training Background Replacement Advanced |
|
"COBRA"
Conversion |
enables previously trained/exp personnel to assume new duties
|
|
"COBRA"
Onboard Training |
training provided for individual watch quals, watch team training and GMT
|
|
"COBRA"
Background |
prerequisite training to prepare first area assignement or for futher specialized training(A School)
|
|
"COBRA"
Replacement |
Provides personnel with min required operational/maintenance quals
|
|
"COBRA"
Advanced |
specialized training, follows replacement and conversion training. C School
|
|
When should job sheet development begin?
|
After the development of the TLA and TOS.
|
|
How CLOs are developed?
|
-PPP Tables to get all PPPs taught in the course
-Find the associated TOS codes to determ level of instr -Construct CLOs using the CLO model statements |
|
How are part numbers determined?
|
FM the PPP Tables
|
|
8 ways to sequence a course
|
Chronological, Job Performance,Critical seq, Simple complex, Combination approach, Comparative seq, Rel of like COI elements, priciple of reverse seq (HARD-EASY/NEW-OLD)
|
|
What is contained in a resource requirements list
(RRL) "V TIRES" |
VI device:Projectors...
Text IMM Referances Equipment Support materials |
|
What is contained in the final TCCD?
"FCA" |
Front Matter
Curriculum Ouline of Instruc Annexes |
|
What annexes are included in the final TCCD?
|
RRL
CMS FAL Fault Applicablity list Profile item to OAC |