• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/55

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

55 Cards in this Set

  • Front
  • Back

What is capacity?

Capacity represents the maximum value that can be provided by an operation

Capacity planning begins with ____ _____ of a unit of measurement.

intelligent selection

What is design capacity?

the theoretical maximum output of a system, assuming ideal operating conditions

What is effective capacity?

it is expected to be less than its design capacity, in that it reflects the system's potential under normal operating conditions

Design capacity is notoriously ______

fixed

Define utilization.

Percent of design capacity in use



What is efficiency?

percent of a resource in productive use.

What is the formula for utilization?

(actual output/design capacity)

What is the formula of efficiency?

actual output/effective capacity

Why is efficiency more operational than utilization?

it states how much of a resource is being used, given its reasonable availability

In capacity planning, desirability is determined by...

cost, and the operating level of a facility that minimizes at which the facility can operate.

At low levels of output volume, average cost...

is often high

What are fixed costs?

cost incurred regardless of the volume of associated activity.

For output volume, any increase to output level...

decreases average cost by spreading the fixed cost further

What is economies of scale?

Decreasing average unit cost by increasing volume.

What is diseconomies of scale?

Increasing average unit cost by increasing volume

What is the theoretically desirable optimal operating level?

Where economies of scale and diseconomies of scale meet.

Can facilities operate beyond design capacity.

Yes facilities can operate beyond their design capacity.

What is break even?

just enough revenue to cover costs.

Define variable costs.

costs that varies with volume of associated activity.

What is the formula of break even point?

Fixed costs + (variable costs *quantity)= (revenue*quantity)

What is the alternative formula for break even?

Break even quantity= FC/(Revenue-Variable costs)

Break even analysis helps clarify the strategic issue of _________ or __________ some portion of an organization's production

subcontract


outsource

Define subcontracting.

to engage a third party in provision of value to a customer

Define outsourcing.

to subcontract an internal process to an external provider

Any company should resist ______ ________ of its business, because the business may lose its competitive advantage within its own market.

core competency

Describe a conservative capacity strategy.

The design capacity is adjusted upward only after demand on the system has increased to levels well beyond current capacities

What are the advantages of a conservative capacity strategy?

High utilization rates throughout the organization's history can translate into high values for return on assets




Shortages created by delaying expansion might not necessarily translate into lost customers.

What are the disadvantages of a conservative capacity strategy?

(1) customer service is likely to suffer throughout the firm's timeline.


(2) competitors may maximize opportunities to enter the market and establish themselves by claiming unmet demand.


(3) system overload may result in higher average costs than necessary

Explain an aggressive capacity strategy.

an organization pursuing an aggressive capacity strategy expands in anticipation of growing demand. Here the design capacity of the system is never allowed to fall below demand, resulting in adequate supply of its output throughout the organization's timeline

What is a capacity cushion?

largely idle capacity maintained be beyond the expected load level of a system to absorb expected demand.

What is the advantage to an aggressive capacity strategy?

Customer service is maximized throughout the firm's timeline




Competitors have less incentive and opportunity to enter this marketplace

What are the disadvantages to an aggressive capacity strategy?

Aggressive expansion of capacity lower utilization levels throughout the organization's history, possibly translating into lower return on assets.




Increased costs associated with maintaining the idle capacity cushion often provide little or no direct benefit in the absence of unexpected demand.

Companies follow a combination of ____ versus ______ capacity.

aggressive


conservative

When determining whether a firm should use an aggressive or conservative strategy, a firm looks at...

the cost unmet demand relative to the cost of idle capacity

What are queue?

a waiting line

what is the queuing theory?

mathematical modeling of waiting lines.

The first component of any waiting line is...

the source of its customer arrivals.

What is a finite calling population?

implies that the overall number of potential customers is small enough that customers arrival rate and the number of customers in the system are not independent events

What is an infinite calling population?

It contains enough customers that the customer arrival rate and the number of customers in the system function independently: the arrival of one customer does not reduce the overall size of the population enough to change the probability that another customer arrival will follow

______ ______ is a discrete probability distribution describing the likelihood of a particular number of independent events within a particular interval

poisson distribution

What is the formula for a poisson distribution?

The probability of x customers arriving= ((mean number of customers that arrive in that period^number of customers)(e*mean number of customers that arrive in that period))/(number of customers!)

What is perfectly patient?

every arriving customer joins the line and all customers wait until they are served, customer arrivals are said to be perfectly patient

What are the two common forms of impatience?

balking


reneging

What is balking?

occurs when a customer arrives and leaves immediately without joining the line

What is reneging?

occurs when a customer arrives, joins the line, but leaves at some point without receiving the service.

When observing a line, there are two queue characteristics to watch for?

(1) any issue of limitation on the length of the queue


(2) what rule is governing the order in which waiting customers are being served.

Any customer arriving after a limited queue has reached its capacity is said to be ___ from the system

blocked

Define blocking.

preventing customer arrivals from entering a system due to limitations on the allowable length of a queue.

What is queue discipline?

a policy of the system specifying the order in which waiting arrivals are served.

What is a FCFS?

a sequencing rule that means first come, first served.

What is a serpentine line?

a single queue of customers waiting in a line that must bend one or more times to fit within the service facility.

______ _____ is a labeling system for classifying waiting line models according to their initial assumptions.

kendall notation

What is tractable?

easy to use; yields insight with a limited number of calculations

What is the difference between absolute time and perceived time?

Absolute time is the passage of time as measured by a clock




Perceived time is a passage of time as measured by a person, usually without the use of a clock