• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back

is in some ways a contradiction in terms, since the transformed resources do not move between the transforming resources.

Fix position layout

similar resources or processes are located together. This may be because it is convenient to group them, or so that the utilization of transforming resources is improved.

Functional layout

one where the transformed resources entering the operation are pre-selected (or preselect themselves) to move to one part of the operation

Cell layout

may be arranged in either a functional or product layout.

Cell layout

involves locating the transforming resources entirely for the convenience of the transformed resources

Product line layout

Many operations either design themselves hybrid layouts which combine elements of some or all of the basic layout types or use the ‘pure’ basic layout types in different parts of the operation.

Mixed layout