• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/7

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

7 Cards in this Set

  • Front
  • Back

How many sf are in an acre?

43,560 sf in an acre

Who issues a change order?

The owner -- to review

Who creates shop drawings?

Manufacturer or contractor

Bulletin vs Addendum vs Change Order

Addendum is issued after a project goes out for bid, but before bids are evaluated. Change order and bulletins occur during construction. Change order is issued by owner (or is it just approved by owner?) and is issued for changes involved significant $. Bulletin is a request for changes from the design/construction side.

What is a possible outcome of lead consultant taking calls from contractor (as opposed to questions submitted in writing)?

Will be considered giving an unfair advantage to one of the bidding parties (possibly disclosing information that all parties are not aware of) and could result in bids being invalidated. Consultant (in this case landscape architect) who took the call could become liable for the cost of bidding.

What type of chart is this and what is it used for?

What type of chart is this and what is it used for?

A PERT chart is a project managment tool used to schedule, organize, and coordinate tasks. It differs from a Gantt chart in that a PERT chart focuses on relationships and is a bubble diagram. A Gantt chart is a bar graph showing the specific amoun...

A PERT chart is a project managment tool used to schedule, organize, and coordinate tasks. It differs from a Gantt chart in that a PERT chart focuses on relationships and is a bubble diagram. A Gantt chart is a bar graph showing the specific amount of time each process is expected to take.



What is involved in a feasibility study?

Questions such as will the acreage of the park fit all of the specified program, can the contractor afford to build the project with the provided specs