• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back
Job Order Costing System
approach to assigning costs
Process-Costing System
Process output for a period is measured, then unit costs are computed by dividing the process costs by the output of the period.
Materials Requisition Forms
used to assign DM costs to each job
Time Tickets
used to track the hours worked by DL on each job
Job-Order Cost Sheet
prepared for every job; the subsidiary to the WIP account and is the primary document for accumulating all costs related to a particular job