Develop Project Charter (rerun) |
<Inputs> Business Docs, Agreements, EEFs, OPAs <T&T> Expert Judgment, Data Gathering, Interpersonal and Team Skills, Meetings. <Outputs> Project Charter, Assumption Log |
|
Develop Project Charter - T & T (4) |
Expert Judgement, Data Gathering, Interpersonal & Team Skills, Meetings |
|
Develop Project Charter - Outputs (2) |
Project Charter, Assumption Log |
|
Develop Project Management Plan (rewrite) |
<Inputs> Project Charter, Output from Other Processes, EEFs, OPAs. <T & T> Expert Judgment, Data Gathering, Interpersonal and Team Skills, Meetings. <Output> Project Management Plan |
|
Develop Project Management Plan - T & T (4) |
Expert Judgement, Data Gathering, Interpersonal & Team Skills, Meetings |
|
Develop Project Management Plan - Output (1) |
Project Management Plan |
|
Direct & Manage Project Work (lime key) |
<Inputs> Project Management Plan, Project Docs, Approved Change Requests, EEFs, OPAs. <T & T> Expert Judgment, PMIS, Meetings. <Outputs> Deliverables, Work Performance Data, Issue Log, Change Requests, Project Management Updates, Project Documents Updates, OPA updates |
|
Direct & Manage Project Work - T & T (3) |
Expert Judgment, PMIS, Meetings |
|
Direct & Manage Project Work - Outputs (7) |
Deliverables, Work Performance Data, Issue Log, Change Requests, Project Management Plan Updates, Project Document Updates, OPA Updates |
|
Manage Project Knowledge (low rum) |
<Inputs> Project Management Plan, Project Documents, Deliverables, EEF, OPA. <T & T> Expert Judgment, Knowledge Management, Information Management, Interpersonal and Team Skills. <Output> Lessons Learned Register, Project Management Plan Updates, OPAs Updates |
|
Manage Project Knowledge - T & T (4) |
Expert Judgment, Knowledge Management, Information Management, Interpersonal and Team Skills |
|
Monitor & Control Project Work - T & T (4) |
Expert Judgment, Data Analysis, Decision Making, Meetings |
|
Monitor & Control Project Work (juror) |
<Inputs> Project Management Plan, Project Documents, Work Performance Info, Agreements, EEFs, OPAs <T & T> Expert Judgment, Data Analysis, Decision Making, Meetings <Outputs> Work Performance Reports, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Monitor & Control Project Work - T & T (4) |
Expert Judgment, Data Analysis, Decision Making, Meetings |
|
Monitor & Control Project Work - Outputs (4) |
Work Performance Reports, Change Requests, Project Docs Update, Performance Management Plan Update |
|
Perform Integrated Change Control - Inputs (shalom) |
<Inputs> Project Management Plan, Project Docs, Change Requests, Work Performance Reports, EEFs, OPAS <T & T> Expert Judgement, Change Control Tools, Data Analysis, Decision Making, Meetings <Outputs> Approved Change Requests, Project Management Plan Update, Project Doc Update |
|
Perform Integrated Change Control - T & T (5) |
Expert Judgement, Change Control Tools, Data Analysis, Decision Making, Meetings |
|
Perform Integrated Change Control - Outputs (3) |
Approved Change Requests, Project Management Plan Update, Project Doc Update |
|
Close Project or Phase (femur) |
<Inputs> Project Charter, Project Management Plan, Project Docs, Accepted Deliverables, Business Docs, Procurement Documentation, Agreements, OPAs <T & T> Expert Judgment, Data Analysis, Meetings <Outputs> Project Doc Updates, Final Product, Service or Result Transition, Final Report, OPA Updates |
|
Close Project or Phase - T & T (3) |
Expert Judgment, Data Analysis, Meetings |
|
Close Project or Phase - Outputs (4) |
Project Doc Updates, Final Product, Service or Result Transition, Final Report, OPA Updates |
|
Plan Scope Management (ramen) |
<Inputs> Project Charter, Project Management Plan, EEFs, OPAs <T & T> Expert Judgment, Data Analysis, Meetings <Outputs> Scope Management Plan, Requirements Management Plan |
|
Plan Scope Management - T & T (3) |
Expert Judgment, Data Analysis, Meetings |
|
Plan Scope Management - Outputs (2) |
Scope Management Plan, Requirements Management Plan |
|
Collect Requirements (cafeine) |
<Inputs> Project Charter, Project Management Plan, Project Docs, Business Docs, Agreements, EEFS, OPAs <T & T> Expert Judgement, Data Gathering, Data Analysis, Decison Making, Data Representation, Interpersonal & Team Skills, Context Diagram, Prototypes <Outputs> Requirements Documentation, Requirements Traceability Matrix |
|
Collect Requirements - T & T (8) |
Expert Judgement, Data Gathering, Data Analysis, Decison Making, Data Representation, Interpersonal & Team Skills, Context Diagram, Prototypes |
|
Collect Requirements - Outputs (2) |
Requirements Documentation, Requirements Traceability Matrix |
|
Define Scope (Ellen) |
<Inputs> Project Charter, Project Management Plan, Project Docs, EEFs, OPAs <T & T> Expert Judgement, Data Analysis, Decison Making, Interpersonal and Team Skills, Product Analysis <Outputs> Project Scope Statement, Proj Docs Updates |
|
Define Scope - T & T (5) |
Expert Judgement, Data Analysis, Decison Making, Interpersonal and Team Skills, Product Analysis |
|
Define Scope - Outputs (2) |
Project Scope Statement, Proj Docs Updates |
|
Create WBS - Inputs (ronin) |
<Inputs> Project Management Plan, Project Docs, EEFs, OPAs <T & T> Expert Judgment, Decomposition <Outputs> Scope Baseline, Project Docs Updates |
|
Create WBS - T & T (2) |
Expert Judgment, Decomposition |
|
Create WBS - Outputs (2) |
Scope Baseline, Project Docs Updates |
|
Validate Scope - (runner) |
<Inputs> Project Management Plan, Project Docs, Verified Deliverables, Work Performance Data <T & T> Inspection, Decison Making <Outputs> Accepted Deliverables, Work Performance Info, Change Requests, Project Docs Updates |
|
Validate Scope - T & T (2) |
Inspection, Decison Making |
|
Validate Scope - Outputs (4) |
Accepted Deliverables, Work Performance Info, Change Requests, Project Docs Updates |
|
Control Scope (writer) |
<Inputs> Project Management Plan, Project Docs, Work Performance Data, OPAs <T & T> Data Analysis <Outputs> Work Performance Info, Change Requests, Project Management Plan Updates, Project Docs Updates |
|
Control Scope - T & T (1) |
Data Analysis |
|
Control Scope - Outputs (4) |
Work Performance Info, Change Requests, Project Management Plan Updates, Project Docs Updates |
|
Plan Schedule Management (remote) |
<Inputs> Project Charter, Project Management Plan, EEFs, OPAs <T & T> Expert Judgment, Data Analysis, Meetings <Outputs> Schedule Management Plan |
|
Plan Schedule Management - T & T (3) |
Expert Judgment, Data Analysis, Meetings |
|
Plan Schedule Management - Outpu |
Schedule Management Plan |
|
Define Activities (rear lei) |
<Inputs> Project Management Plan, EEFs, OPAs <T & T> Expert Judgment, Decomposition, Rolling Wave Planning, Meetings <Outputs> Activity List, Activity Attributes, Milestone List, Change Requests, Project Management Plan Updates
|
|
Define Activities - T & T (4) |
Expert Judgment, Decomposition, Rolling Wave Planning, Meetings |
|
Define Activities - Outputs (5) |
Activity List, Activity Attributes, Milestone List, Change Requests, Project Management Plan Updates |
|
Sequence Activities |
<Inputs> Project Management Plan, Project Documents, EEFs, OPAs <T & T> Precedence Diagramming Method, Dependency Determination and Integration, Leads and Lags, PMIS <Outputs> Project Schedule Network Diagrams, Project Documents Updates
|
|
Sequence Activities - T & T (4) |
Precedence Diagramming Method, Dependency Determination and Integration, Leads and Lags, PMIS |
|
Sequence Activities - Outputs (2) |
Project Schedule Network Diagrams, Project Documents Updates |
|
Estimate Activity Duration - (4) |
<Inputs> Project Management Plan, Project Documents, EEFs, OPAs |
|
Estimate Activity Duration - T & T (8) |
Expert Judgment, Analogous Estimating, Parametric Estimating, Three-point Estimating, Bottom-up Estimating, Data Analysis, Decision Making, Meetings |
|
Estimate Activity Duration - Outputs (3) |
Duration Estimates, Basis of Estimates, Project Documents Updates |
|
Develop Schedule - Inputs (5) |
Project Management Plan, Project Documents, Agreements, EEFs, OPAs |
|
Develop Schedule - T & T (8) |
Schedule Network Analysis, Critical Path Method, Resource Optimization, Data Analysis, Leads and Lags, Schedule Compression, PMIS, Agile Release Planning |
|
Develop Schedule - Outputs (7) |
Schedule Baseline, Project Schedule, Schedule Data, Project Calendars, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Control Schedule - Inputs (4) |
Project Management Plan, Project Documents, Work Performance Data, OPAs |
|
Control Schedule - T & T (6) |
Data Analysis, Critical Path Method, PMIS, Resource Optimization, Leads and Lags, Schedule Compression |
|
Control Schedule - Outputs (5) |
Work Performance Info, Schedule Forecasts, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Plan Cost Management - Inputs (4) |
Project Charter, Project Management Plan, EEFs, OPAs |
|
Plan Cost Management - T & T (3) |
Expert Judgment, Data Analysis, Meetings |
|
Plan Cost Management - Output |
Cost Management Plan |
|
Estimate Costs - Inputs (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Estimate Costs - T & T (8) |
Expert Judgement, Analogous Estimating, Parametric Estimating, Three-point Estimating, Data Analysis, PMIS, Decision Making |
|
Estimate Costs - Outputs (3) |
Cost Estimates, Basis of Estimates, Decision Making |
|
Determine Budget - Inputs (6) |
Project Management Plan, Project Documents, Business Documents, Agreements, EEFs, OPAs |
|
Determine Budget - T & T (6) |
Expert Judgment, Cost Aggregation, Data Analysis, Historical Information Review, Funding Limit Reconciliation, Financing |
|
Determine Budget - Output (3) |
Cost Baseline, Project Funding Requirements, Project Documents Updates |
|
Control Costs - Inputs (5) |
Project Management Plan, Project Documents, Project Funding Requirements, Work Performance Data, OPAs |
|
Control Costs - T & T (4) |
Expert Judgment, Data Analysis, To-complete Performance Index, PMIS |
|
Control Costs - Outputs (5) |
Work Performance Data, Costs Forecasts, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Plan Quality Management - Inputs (5) |
Project Charter, Project Management Plan, Project Documents, EEFs, OPAs |
|
Plan Quality Management - T & T (7) |
Expert Judgment, Data Gathering, Data Analysis, Decision Making, Data Representation, Test & Inspection Planning, Meetings |
|
Plan Quality Management - Outputs (4) |
Quality Management Plan, Quality Metrics, Project Management Plan Updates, Project Documents Updates |
|
Manage Quality - Inputs (3) |
Project Management Plan, Project Documents, OPAs |
|
Manage Quality - T & T (8) |
Data Gathering, Data Analysis, Decision Making, Data Representation, Audits, Design for X, Problem Solving, Quality Improvement Methods |
|
Manage Quality - Outputs (5) |
Quality Reports, Test and Evaluation Documents, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Control Quality - Inputs (7) |
Project Management Plan, Project Documents, Approved Change Requests, Deliverables, Work Performance Data, EEFs, OPAs |
|
Control Quality - T & T (6) |
Data Gathering, Data Analysis, Inspection, Testing/Product Evaluations, Data Representation, Meetings |
|
Control Quality - Outputs (6) |
Quality Control Measurements, Verified Deliverables, Work Performance Info, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Plan Resource Management - Inputs (5) |
Project Charter, Project Management Plan, Project Documents, EEFs, OPAs |
|
Plan Resource Management - T & T (4) |
Expert Judgment, Data Representation, Organizational Theory, Meetings |
|
Plan Resource Management - Output (3) |
Resource Management Plan, Team Charter, Project Documents Updates |
|
Estimate Activity Resources - Inputs (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Estimate Activity Resources - T & T (7) |
Expert Judgment, Bottom-up Estimating, Analogous Estimating, Parametric Estimating, Data Analysis, PMIS, Meetings |
|
Estimate Activity Resources - Output (4) |
Resource requirements, Basis of Estimates, Resource Breakdown Structure, Project Documents Updates |
|
Acquire Resources - Inputs (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Acquire Resources - T & T (4) |
Decision Making, Interpersonal and Team Skills, Pre-assignment, Virtual Teams |
|
Acquire Resources - Outputs (8) |
Physical Resource Assignments, Project Team Assignments, Resource Calendars, Change Requests, Project Management Plan Updates, Project Documents Updates, EEFs, OPAs |
|
Develop Team - Inputs (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Develop Team - T & T (8) |
Colocation, Virtual Teams, Communications Technology, Interpersonal and Team Skills, Recognition and Rewards, Training, Individual and Team Assessments, Meetings |
|
Develop Team - Outputs (6) |
Team Performance Assessments, Change Requests, Project Management Plan Updates, Project Documents Updates, EEFs, OPAs |
|
Manage Team - Inputs (6) |
Project Management Plan, Project Documents, Work Performance Reports, Team Performance Reports, EEFs, OPAs |
|
Manage Team - T & T (2) |
Interpersonal and Team Skills, PMIS |
|
Manage Team - Outputs (4) |
Change Requests, Project Management Plan Updates, Project Documents Updates, EEF Updates |
|
Control Resources - Inputs (5) |
Project Management Plan, Project Documents, Work Performance Data, Agreements, OPAs |
|
Control Resources - T & T (4) |
Data Analysis, Problem Solving, Interpersonal and Team Skills, PMIS |
|
Control Resources - Outputs (4) |
Work Performance Info, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Plan Communications Management - Inputs (5) |
Project Charter, Project Management Plan, Project Documents, EEFs, OPAs |
|
Plan Communications Management - T & T (8) |
Expert Judgment, Communications Requirements Management, Communication Technology, Communication Models, Communication Methods, Interpersonal and Team Skills, Data Representation, Meetings |
|
Plan Communications Management - Outputs (3) |
Communications Management Plan, Project Management Plan Updates, Project Documents Updates |
|
Manage Communications - Inputs (4) |
Project Management Plan, Project Documents, Work Performance Reports, EEFs, OPAs |
|
Manage Communications - T & T (7) |
Communication Technology, Communication Methods, Communication Skills, PMIS, Project Reporting, Interpersonal and Team Skills, Meetings |
|
Manage Communications - Outputs (4) |
Project Communications, Project Management Plan Updates, Project Documents Updates, OPA Updates |
|
Monitor Communications - Inputs (5) |
Project Management Plan, Project Documents, Work Performance Data, EEFs, OPAs |
|
Monitor Communications - T & T (5) |
Expert Judgment, PMIS, Data Representation, Interpersonal and Team Skills, Meetings |
|
Monitor Communications - Outputs (4) |
Work Performance Info, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Plan Risk Management - Inputs (5) |
Project Charter, Project Management Plan, Project Documents, EEFs, OPAs |
|
Plan Risk Management - T & T (3) |
Expert Judgment, Data Analysis, Meetings |
|
Plan Risk Management - Output |
Risk Management Plan |
|
Identify Risks - Inputs (6) |
Project Management Plan, Project Documents, Agreements, Procurement Documentation, EEFs, OPAs |
|
Identify Risks - T & T (6) |
Expert Judgment, Data Gathering, Data Analysis, Interpersonal and Team Skills, Prompt Lists, Meetings |
|
Identify Risks - Outputs (3) |
Risk Register, Risk Report, Project Documents Updates |
|
Perform Qualitative Risk Analysis - Inputs (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Perform Qualitative Risk Analysis - T & T (7) |
Expert Judgment, Data Gathering, Data Analysis, Interpersonal and Team Skills, Risk Categorization, Data Representation, Meetings |
|
Perform Qualitative Risk Analysis - Output |
Project Documents Updates |
|
Perform Quantitative Risk Analysis - Input (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Perform Quantitative Risk Analysis - T & T (5) |
Expert Judgment, Data Gathering, Interpersonal and Team Skills, Representations of Uncertainty, Data Analysis |
|
Perform Quantitative Risk Analysis - Output |
Project Documents Updates |
|
Plan Risk Response - Inputs (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Plan Risk Response - T & T (9) |
Expert Judgment, Data Gathering, Interpersonal and Team Skills, Strategies for Threats, Strategies for Opportunities, Contingent Response Strategies, Strategies for Overall Project Risk, Data Analysis, Decision Making |
|
Plan Risk Response - Outputs (3) |
Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Implement Risk Response - Inputs (3) |
Project Management Plan, Project Documents, OPAs |
|
Implement Risk Response - T & T (3) |
Expert Judgment, Interpersonal and Team Skills, PMIS |
|
Implement Risk Response - Outputs (2) |
Change Requests, Project Documents Updates |
|
Monitor Risks - Inputs (4) |
Project Management Plan, Project Documents, Work Performance Data, Work Performance Reports |
|
Monitor Risks - T & T (3) |
Data Analysis, Audits, Meetings |
|
Monitor Risks - Outputs (5) |
Work Performance Info, Change Requests, Project Management Plan Updates, Project Documents Updates, OPAs Updates |
|
Plan Procurement Management - Inputs (6) |
Project Charter, Business Documents, Project Management Plan, Project Documents, EEFs, OPAs |
|
Plan Procurement Management - T & T (5) |
Expert Judgment, Data Gathering, Data Analysis, Source Selection Analysis, Meetings |
|
Plan Procurement Management - Outputs (10) |
Procurement Management Plan, Procurement Strategy, Bid Documents, Procurement Statement of Work, Source Selection Criteria, Make-or-Buy Decisions, Independent Cost Estimates, Change Requests, Project Documents Updates, OPA Updates |
|
Conduct Procurements - Inputs (6) |
Project Management Plan, Project Documents, Procurement Documentation, Seller Proposals, EEFs, OPAs |
|
Conduct Procurements - T & T (5) |
Expert Judgment, Advertising, Bidder Conferences, Data Analysis, Interpersonal and Team Skills |
|
Conduct Procurements - Outputs (6) |
Selected Sellers, Agreements, Change Requests, Project Management Plan Updates, Project Documents Updates, OPA Updates |
|
Control Procurements - Inputs (8) |
Project Management Plan, Project Documents, Agreements, Procurement Documentation, Approved Change Requests, Work Performance Data, EEFs, OPAs |
|
Control Procurements - T & T (5) |
Expert Judgment, Claims Administration, Data Analysis, Inspections, Audits |
|
Control Procurements - Outputs (7) |
Closed Procurements, Work Performance Info, Procurement Documentation Updates, Change Requests, Project Management Plan Updates, Project Documents Updates, OPA Updates |
|
Identify Stakeholders - Inputs (7) |
Project Charter, Business Documents, Project Management Plan, Project Documents, Agreements, EEFs, OPAs |
|
Identify Stakeholders - T & T (5) |
Expert Judgment, Data Gathering, Data Analysis, Data Representation, Meetings |
|
Identify Stakeholders - Outputs (4) |
Stakeholder Register, Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Plan Stakeholder Engagement - Inputs (6) |
Project Charter, Project Management Plan, Project Documents, Agreements, EEFs, OPAs |
|
Plan Stakeholder Engagement - T & T (6) |
Expert Judgment, Data Gathering, Data Analysis, Decision Making, Data Representation, Meetings |
|
Plan Stakeholder Engagement - Output |
Stakeholder Engagement Plan |
|
Manage Stakeholder Engagement - Inputs (4) |
Project Management Plan, Project Documents, EEFs, OPAs |
|
Manage Stakeholder Engagement - T & T (5) |
Expert Judgment, Communication Skills, Interpersonal and Team Skills, Ground Rules, Meetings |
|
Manage Stakeholder Engagement - Outputs (3) |
Change Requests, Project Management Plan Updates, Project Documents Updates |
|
Monitor Stakeholder Engagement - Inputs (5) |
Project Management Plan, Project Documents, Work Performance Data, EEFs, OPAs |
|
Monitor Stakeholder Engagement - T & T (6) |
Data Analysis, Decision Making, Data Representation, Communication Skills, Interpersonal and Team Skills, Meetings |
|
Monitor Stakeholder Engagement - Output (4) |
Work Performance Info, Change Requests, Project Management Plan Updates, Project Documents Updates |