• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/54

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

54 Cards in this Set

  • Front
  • Back
What is job planning
most efficent and economical combo
the most economical combo of using people equipment and process is known as
job planning
job planning consists of these 3
people, equipment and process
What are considerations needed for job planning
bindery
bindery considerations are needed for
job planning
what are some bindery considerations
Extra gripper , foils ,embossed, die cuts
Extra gripper , foils ,embossed, die cuts are all
are all bindery considerations
having a extra gripper is a _____ for job planning
bindery consideration
having foils is a _______ for job planning
bindery consideration
making sure that there is embossing is for ________ in job planning
bindery consideration
die cuts are a _______ for job planning
bindery consideration
constraints are
cost and equipment capabilities
cost and equiptment capabilites are
constraints
hiflet and avanti are
management information systems
management inforation systems include
hiflex and avanti
the point of job planning is from what concept to final delivery
intial concept to final deleiver
initial concept to final deliviery is part of
job planning
what does job planning help comanies do
utlize potential of equipement
job planning also helps do what for large jobs
split the work between presses
max sheet size, speed, limitations should be used when following
the specs of production equiptment
the process part of job planning is mainly for
determining layout or imposition
determinding the layout or imposition is usually of what part of the job planning
job proces
when you do the layout/ imposition you will be able to know
how much paper will be used, speed and bindery
being able to know the speed of the press , paper used and bindery is of what job planning process
process - layout and imposition
where should you start your process
at the bindery and work backwards
you should always start at the ______ an work _____ backwards
bindery backawards
why should you start at the bindery and work backwardd
bindary equiptment has huge impact on job layout
what has a huge impact on the job layout and impsotion
bindery
folding is a
bindery consideration
trimming is a
bindery consideration
binding methods is a
bindery consideration
paper weight/ thickness is a
bindery consideration
equiptment requiremnts and limitations is a
bindery consideration
what is the slowest part of production
bindery
when doing folding what should you look for
optimum methods
optimum methods should be looked for when
folding
bindery is known to be the
slowest part of production
step 1 of good job planning is
gather all info about the job
gathing all information of the job, finsing bindery and paper/press is which step in good job planing
step 1
for step 1 what should you include when gathering yourr info
bindery, finishing paper and press
bindery, finishing, paper and pres sshould be looked into when
doing step 1 of good basic steps
based on information about the job you are aber to determine
max number papges in singature
what can be detrmined by knowing all specs of a job
maximum number of pages in a signature
step 3 is also known as
dertmine number of signatures and type
determining numer of signatures and type is
step 3
for step 4 you should use a
dummy and markup
using a dummy and markup is what step
4
what two things do u need for step 4
dummy and markup
what should you use to draw a laysheet plan
dummy
a dummy is good for
drawing a laysheet plan
how do we draw a laysheet plan
with a dummy
what should u use the lay sheet plan for
to form imposition
to form a imposition we usually
use the lay sheert
the laysheet is good for
forming an imposition