Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
57 Cards in this Set
- Front
- Back
Can an oil company force entry to survey? |
Yes |
|
Can an oil company force entry to do ageophysical survey? |
No |
|
Can an oil company force entry to drill awell? |
Yes |
|
What government agency is involved when acompany must force entry? |
Surface Rights Board - Alberta Government |
|
What can a landowner protest? |
Location of the rig and/or compensation |
|
What government agency gets involved withlandowner safety issues related to drilling a well? |
EUB |
|
Who is the operator? |
Oil company |
|
MSL: __________________. An MSL is adocument allowing access to the ______________ for the purpose of______________ |
Mineral Surface Lease, surface drilling and production |
|
Does an MSL include both surface and mineralrights? |
No - surface only |
|
When does access to the surface need tobecome permanent? |
When the well is drilled (access roads, facilities and pipeline monitoring) and not a D&A |
|
ROW: _________________. What does an ROW restrict? |
Right of Way, building infrastructure onto of the surface |
|
Is compensation for surface entry usuallya large sum of money? |
No - fair amount is given |
|
Does surface compensation include a royalty? |
No |
|
What document must an oil company have isthey wish to surrender their surface lease? |
Reclamation Certificate |
|
Who grants the RC? |
Alberta Environment |
|
Name a drilling rig. |
Rotary Land Rig |
|
What is a drilling rig’s function? |
Drill the initial hole into the group for production purposes |
|
When does the drilling rig leave the site? |
When the hole is cased and ready for production |
|
Describe the power system. |
Power to a drilling rig (normally delivered by diesel engines called prime movers) |
|
Describe the hoisting system. |
Hoisting system to handle considersable weight of the drill pipe or drill string by operating as a vertical crane (consists of the Derrick, pulleys and drilling line) |
|
Describe the rotating system. |
parts of the rig that turn (swivel, Kelly bushing, master bushing, drill string, drill collars and drill bit) |
|
What is a joint of pipe and how long is it? |
Drill pipe, 9.5 to 14 m |
|
What is drill string? |
term used to describe the drill pipe, collars, drill bit all together |
|
KB: ________________. Where is KB located? |
Kelly Bushing, above the master bushing (on the rig floor) |
|
What is a wellbore? |
The hole in the ground made by drilling |
|
What is the annulus? |
The space (360º) between the drill stringand the wellbore. |
|
Name 3 different materials that can beused in the circulating system. |
1. Mud 2. Air 3. Water |
|
The circulating system is responsible for: |
Maintaining back pressure against downholeformations, bringing chip samples/drill cuttings to the surface, and coolingand lubricating the drill bit. |
|
Compare and contrast drill cuttings andchip samples. |
Chip samples & drill cuttings are the same |
|
What is underbalanced drilling? How does it affect the formations? |
- circulating system is closed and not open to the atmosphere - Allows for greater rates of penetration and lowers the risk of damaging the formations with drilling mud or creating a filter cake buildup |
|
What is overbalanced drilling? How does it affect the formations? |
- drilling with mud that is heavier than required (safe from a blowout standpoint) - damages the downhole formations through invasion |
|
BOP: _____________. Where is the BOP located? |
- Blowout Prevention - sits below the rig floor, under the master bushing and is attached to the surface casing |
|
Explain drilling ahead and making hole. |
terms allocated to actually drilling the wellbore (gouging of scraping the rock and proceeding deeper into the earth) |
|
Explain tripping and tripping out. |
Tripping is the reversal of drilling ahead (drill pipe is removed from the hole) |
|
Explain running in. |
Occurs after a trip - drill string is attached to the bit and kelly and lowered into the hole |
|
The rig used for drilling the deepestholes is a ______ |
Triple rig |
|
A double rig can handle ______ joints ofdrill pipe. |
2 at a time |
|
What does “spud” mean? |
Start drilling |
|
What does spudded the well mean? |
Started drilling |
|
What is rigging up? |
process of getting a drilling rig ready to drill |
|
Describe how surface casing is fixed inthe ground and why it is used. |
- Surface casing is steel pipe that lines the hole from the surface to a depth set by the regulatory body governing the drilling - prevents the erosion of the surface hole |
|
TD ____________. Who sets the TD? |
Total Depth, the oil company in consultation with the geologist |
|
TVD _____________ |
Total vertical depth |
|
What is a fish? How is a fish retrieved? |
- anything lost or dropped down the well - use of junk baskets, magnets, overshots, grapples, explosives and spears |
|
Explain lost circulation and how it ishandled? |
- When the drill bit encounters a formation that has very high permeability the drilling mud exiting the nozzle ports on the bit bleeds into the formation instead of returning to the surface up the annulus - pumping down anything to plug up the formation can be done |
|
What is a kick? |
when a formation fluid overpowers the drilling mud an flows into the annulus |
|
What is a blowout? |
when a formation fluid comes to the surface uncontrolled |
|
List what is evaluated during the drillingprocess? |
Chip samples, gas detection unit, core (ifrequested). |
|
As soon as drilling is completed what isdone? |
Well logs - determine whether the well will produce or not |
|
Who evaluates the logs? |
engineer and geologist in partnership with the logging company |
|
If more reservoir information is requiredwhat is run? |
Drill Stem Test (DST) |
|
Once an oil company has all theinformation from the drilling and immediately after in house and has evaluatedwhat choice must be made? |
Whether to abandon or complete the well |
|
How is a well abandoned? |
placing cement plugs in the wellbore across any porous or permeable zones |
|
How is a well completed? |
cemented casing/production casing is added to the wellbore |
|
Why use tubing? |
To have a smaller diameter for the fluidcolumn to make the fluid column easier to lift. |
|
What is rig release? When is the rig released? |
- When the rig is released to go to anotherlocation. - If the well is D&A the rig is releasedas soon as the decision to abandon is made. If the well is completed the rig is released as soon as the productioncasing has been set in the hole. |
|
Explain a frac and an acid squeeze and whythey are used. |
Frac - high pressure fluid is pumped down into the formation to increase the permeability of the formation Acid squeeze - use of acid to increase permeability |