Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
7 Cards in this Set
- Front
- Back
Which system do we use for Data Management?
|
Oracle
|
|
PRA provides a ___-hour ___ processing day because of different ___
|
24
processing offices |
|
DM has 3 major __ __, all working to the same SOP’s – doesnt matter where your ___is located.
|
processing hubs
SOPsDM |
|
The DM slide shows shows the shared ___ data management system ___ and ___ among all data management staff
|
clinical
platform training |
|
We have ability to ___ work from one location to another to meet ___ if we need to do that. Headcount of DM is over __ - it's a sizeable group that than cope w/ ___ & ___
|
shift
deliverables 300 peaks, valleys |
|
DM has a 24 hour work zone: With the individual DM hubs, and the ___ Help Desk on a _ structure in the CDP group. So we essentially achieve a 24 hour __ __
|
EDC
shift work zone |
|
DM has a __ ___structure—we have global consistency on ___ and ___
|
global management
systems processes |