• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/14

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

14 Cards in this Set

  • Front
  • Back
2U PERS WAR
2 alarm or greater to staging area
Utility companies called: Electric, Gas & Water
Police for traffic & crowd control
EMS for fire & occupant treatment/transport
Rapid intervention crew
Safety Officer
Water supply officer
Accountability Officer
Rehad officer
SS PRIDS CO
(Fires Under Control)
Secondary search
Salvage/Overhaul
Personnel Accountability Roll Call
Rotate/Rehab of members
Investigation of fire
Demobilize the incident scene
Secure scene
Check for CO levels before allowing occupants in
Owner/representative gets bldg. back
Ladder Co. AL VES SCOUP
Apparatus placement
Laddering of bldg.
Ventilation
Entry(forcible)
Search
Salvage
Coordinate with other companies/command
Overhaul
Utilities shut down
Progress reports to command
Engine Co. WASS POCC
Water supply est.
Apparatus placement
Select size hose to be used
Stretch hose line
Placement of hose line
Objectives of hose line
Coordinate with other companies/command
Command receives progress reports
coal twas wealths
construction
occupancy
apparatus & manpower
life hazard

terrain
water supply
auxiliary appliances
street conditions

weather
exposures
area & height
location & extent of fire
time
hazardous conditions
special considerations
CBRNE
chemical
biological
radioactive
nuclear
explosive

LUNAR

location


unit


name or number


assignment/air supply


resources needed

REAL MOS for structural collapse

-Rescue Company


-EMS personnel (additional)


-Additional Alarms (at least one to scene and one to staging)


-Lighting for extended operations


-Mask service unit/air supply


-OEM help get heavy machinery for lifting debris


-Structural Engineer

Search for victims in collapse

1) Secure area


2) Survey and preform size up


3)Shut off utilities


4) surface victims search and removal


5) search voids and crevices


6) Call a time out in order to withdrawal and perform safety size up


7) Tunnel And trench to reported buried victims


8) General debris removal


9) Be aware of fires, gas leaks and secondary collapse while doing steps 1-5

VEIS

Vent


Enter


Isolate (ex. Close door of bedroom)


Search

1st company officer on scene


SLICE-RS

Scene size up


Locate the fire


Isolate the flow path


Cool from a safe location


Extinguish



Rescue


Salvage

TD DOP (terminating command)

Transfer/Terminate command


Debriefing



Document/reports


Offer CISD


Post incident analyst

V V D C


(4 parts to art of reading smoke)

Volume, velocity, density and colour.

RECEO VS

Rescue


Exposures


Confinement


Extinguish


Overhaul


Ventilation/Salvage