• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/7

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

7 Cards in this Set

  • Front
  • Back

What Must agencies do in fulfilling the requirements of 10USC 2305 (a)(1) ?

1 specify needs using market research. 2 promote full and open competition 3 only include realistic provisions

What is the order of precedence for required documents?

Documents mandated by law, performance oriented documents, detail designed oriented Standards, specifications and related publications.

What is the preferred method for acquiring services

Performance based acquisition methods to the maximum extent practicable.

How must COs disseminate information on proposed contract actions?

1. contracts expected to exceed 25k by synopsize 'ing in the g p e. 2. Expected to exceed 15k but not 25k by displaying in public place or by appropriate electronic means .

For which acquisitions' must COs transmit a notice to the g p e? Are there any exceptions to this rule?

Contract action meeting threshold, modification to existing contact, contract action in any amount.

What are the wage rate requirements for construction?

No less than the prevailing wage rate determined by the secretary of labor.

What are the service contract labor standards?

Over two thousand five hundred south contain minimum wage and friend benefits, safe and sanitary working conditions, notifications to employees of minimum allowable compensation