What are the Five Basic Phases to an Expeditionary Camp Layout?
|
Phase I - Planning
Phase II - Site Survey/Security Phase III - Camp Establishment Phase IV - Camp Maintenance Phase V - Camp Teardown |
|
Planning phase has what four types of camps?
|
Base, Expeditionary, Unit and Logistics Hub
|
|
True or False
Site Survey preparations are future site by aerial photograph, satellite imagery or reconnaissance patrol. |
True
|
|
List 5 facilities or structures in Phase III Camp Establishments.
|
Billeting, Food Services, Showers/Heads, Field Armory, BAS, Laundry, Administrative Services, MWR, Ministry, Fire Fighting Team
|
|
What are the basic duties of First Aid Station
|
Emergency Response Team, Minor Surgeries, POatient Monitoring, Medical Evacuation, Pharmacy, and Administration.
|
|
True or False
Personnel should be trained in Basic First Aid and Adult CPR. |
True
|
|
Phase IV Maintenance is normally run by who?
|
Seabees and Contractors (KBR and Blue Diamond).
|
|
Who maintains the tactical equipment in Camp?
|
Seabee Mechanics and L-3 Mechanics.
|
|
What is an intergral component of a septic tank individual sewage disposal system?
|
Leach Field
|
|
What form is filled out when a trouble call is submitted to the Trouble Desk?
|
Emergency/Service Authorization (ESA)
|
|
What are the four priority work classifications
|
Safety, Function, Preventive, Appearance
|
|
State the reason for a prority work classification I (Safety)?
|
Work required primarily for Safety reasons.
|
|
What is potable water for?
|
Suitable for drinking, cooking, and personal use.
|
|
What are four of the eight core elements that make up an expeditionary camp team?
|
-Security
-Intelligence -Supply/Logistics -Training -Administration -Medical -Operations -Maintenance |
|
What are two considerations of expeditionary camp layout phase I?
|
-Reason for the camp
-Type of camp -Terrain -Climate -Threat level |
|
What are the three different teams used during expeditionary camp layout phase II?
|
-Site survey/preparation team
-Site security team -Camp setup team |
|
What is the purpose of a leach field?
|
Serious of drain lines that allow the effluent from the septic tank to drain over a large area of ground. They are integral component of a septic tank individual sewage disposal system.
|
|
These may be referred to as tile fields or absorption trenches.
|
Leach fields
|
|
Define plain/simple chlorination.
|
The single application of chlorine as the only treatment before discharge to the water distribution system.
|