Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
3 Cards in this Set
- Front
- Back
What are the three parts of EOSS? |
EUG EOSS Users Guide EOP Engineering Operating Procedures EOCC Engineering Operating Casualty Control |
|
When are deviations from EOSS authorized? |
1) when adherence to EOSS endangers personnel. 2) when it doesn’t match the actual configuration or or the propulsion plant is modified 3) when a component/ system becomes inoperable or a TYCOM approved DFS is issued. 4) during RMD 5) adhere to provision of ISE and class advisory messages. |
|
What is the order of precedence? |
CO’s standing orders EOSS CHENG standing orders SORM EDORM Other technical documentation |