Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
107 Cards in this Set
- Front
- Back
What division is S-1? |
Stock control |
|
What division is S-1P? |
Postal |
|
What division is S-2? |
Food services |
|
What division is S-3? |
Sales division (ship store, retail clothing) |
|
What division is S-4? |
Disbursing |
|
What division is S-5? |
Hotel Services |
|
What division is S-6? |
Aviation Supply |
|
What division is S-7? |
MWR |
|
What division is S-8? |
General Stores and Material Division |
|
What division is S-8A? |
HAZMAT |
|
What division is S-10? |
QA |
|
What division is S-11? |
Chief's mess |
|
What is the DISBO in charge of? |
Overall in charge of all disbursing functions |
|
What does FSO stand for? |
Food Services Officer |
|
What is the FSO in charge of? |
Food service operations |
|
What division does the Sales Officer manage? |
S-3 |
|
Where do ship store profits go? |
MWR |
|
What division is responsible for the management of the OPTAR? |
S-1 |
|
What does OPTAR stand for? |
Operating Target |
|
What type of material does S-8 manage? |
Consumables/non-dlrs |
|
How many categories of HAZMAT are there? |
6 |
|
What are they? |
Flammables Aerosols Toxics Compressed Gasses Oxidizers Corrosives |
|
What does BDFA stand for? |
Basic daily food allowance |
|
How many meals are provided a day with our BDFA? |
3 |
|
What does NSN stand for? |
National stock number |
|
A NSN contains how many digits? |
13 |
|
What are the first four digits of a NSN? |
FSC |
|
What does FSC stand for? |
Federal Supply Class |
|
What does NIIN stand for? |
National Item Identification Number |
|
A NIIN contains how many digits? |
9 |
|
What does COSAL stand for? |
Coordinated shipboard allowance list |
|
Who manages the COSAL? |
MSC |
|
How many listings comprise the COSAL? |
2 |
|
What are they? |
APL, AEL |
|
What does APL stand for? |
Allowance parts list |
|
What kind of parts are APL's? |
Repair parts / repairable |
|
What does AEL stand for? |
Allowance equipage list |
|
What kind of parts are on AELs? |
Hand tools to perform maintenance. |
|
What ship has the same COSAL as CVN70? |
NONE |
|
What does MOV stand for? |
Material obligated validation |
|
What is the purpose of the MOV's? |
to validate outstanding requisitions |
|
What supply division manages MOV's? |
S-1 |
|
How many types of MOVs are there? |
2 |
|
What are the types of MOVs? |
internal and external |
|
How often are internal MOVs validated? |
Monthly |
|
How often are external MOVs validated? |
quarterly |
|
What are the 3 letters used on an MOV? |
V, C, R |
|
What does the V stand for? |
Valid, part still needed |
|
What does the C stand for? |
Cancelled, parts no longer required |
|
What does the R stand for? |
Received, material has been received by the respective department/division |
|
If material has been received, what must you bring with your MOV? |
Receipt |
|
What is the form for a receipt? |
1348-1a |
|
A dummy receipt must be signed by whom? |
E7 or above |
|
What 3 things must be done to a receipt? |
circle, sign, date |
|
What will you circle and why? |
quantity and NSN, verifying the correct material received |
|
If the quantity on a receipt is incorrect, what do you do? |
one line with the correct quantity |
|
What does DLR stand for? |
Depot level repairable |
|
What division manages DLRs? |
S-6 |
|
What is a DLR? |
a part that, if not capable to be repaired locally, will be sent to depot level activities for repair |
|
How many type of DLRs are there? |
2 |
|
What are they? |
surface and air |
|
What is the pricing system associated with DLRs? |
Standard and net price |
|
What is the standard price? |
the cost of a brand new part |
|
What is the net price? |
The price to repair the part |
|
What is a 5A advice code? |
Survey |
|
What is a 5G advice code? |
1 for 1 exchange, turn in old part to receive a new one |
|
What is a 5S advice code? |
Remain in place |
|
When can a division submit a RIP chit? |
When the requested part is a DLR and it will cause system failure if removed a division can submit a RIP chit to hold the part until the new one is received. |
|
Once a new part has been received how long do you have to turn in the old part? |
24 hours |
|
What NTCSS subsystem is used to order consumables? |
r-supply |
|
What NTCSS system is used to order EMRM related materials? |
OMMS-NG |
|
What NTCSS subsystem is used to order aviation maintenance related materials? |
NALCOMIS |
|
What is a survey? |
Financial Liability Investigation of Property Loss (FLIPL) |
|
What supply division handles surveys? |
S-1 |
|
What is the form for a survey? |
DD form 200 |
|
When would a survey be submitted? |
For the loss of any item over $2500 or for any DLR regardless of price |
|
What supply division manages open purchases? |
S-1 |
|
What is the maximum dollar amount of an open purchase? |
$3000 |
|
How many quotes must be provided for an open purchase? |
3 |
|
If the purchase exceeds $3000 what happens? |
It will be submitted to FLC contracting |
|
What does CASREP stand for? |
Casualty report |
|
When will a CASREP be submitted? |
When a critical system goes down |
|
Who initiates the CASREP? |
Requesting Division |
|
Who initiates the CASREP MILSTRIP? |
S-1 |
|
Is a CASREP the fastest means of receiving a part? |
no |
|
What is the fastest means of receiving a part? |
a bearer walk through |
|
What is a bearer walk through? |
When the part is locally attainable and is within local driving distance |
|
Who is responsible for picking up the part when requesting a bearer walk thru? |
RPPO |
|
What is the NAVSUP P-409 |
MILSTRIP/MILSTRAP Deskguide |
|
What is a priority designator? |
A method of determining an urgency of a requirement. |
|
What does BA status code mean? |
In process for shipment |
|
What does BB status code mean? |
Backordered |
|
What does BD status code mean? |
Delayed |
|
What does BM status code mean? |
Referred to another activity |
|
What does BQ status code mean? |
Cancelled at requisitioner's request |
|
What does ACR stand for? |
Allowance Change Request |
|
What is an ACR? |
A document requesting item additions/deletions or quantity increase/decreases for published allowance list |
|
What does SDR stand for? |
Supply Discrepancy Report |
|
What is the form for a SDR? |
SF 364 |
|
When would a SDR be submitted? |
When material discrepancies such as overages, and shortages, damages, incorrect or non-receipt of materials are encountered |
|
What does QDR stand for? |
Quality deficiency report |
|
What for is a QDR? |
SF 368 |
|
When would a QDR be submitted? |
When the material received cannot be used for its intended purpose because is does not meet form, fit or function requirements
|
|
What does CAGE stand for? |
Commercial and Government Entity |
|
How many digits is a CAGE code? |
5 |
|
What does ASG stand for? |
Afloat Shopping Guide |
|
How many volumes does the ASG contain? |
3 |