• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back

Briefly describe what the NVR final review covers, and when it occurs

2 days prior to settlement

How long after the presettlement does the project manager service the home?

Until settlement

What is covered under the one year drywall services

Any settlement related drywall pops/ cracks, painting

Warrant for clogged sewer line? Who does customer call?

30 days after settlement, call plumber, customer care service number

If a paved or asphalt driveway is installed by nvr, what is our policy if a repair needs to be made?

1st year only, repair or replace concrete to meet standard, cracks no bigger than 1/4", only repair settle 2"

What is our policy on sunken areas in a yard: around foundation? Utility trenches?

1- time yard settlement repair