contingency figure in the schematic design phase. |
An allowance of 10 to 20% of the estimated project cost might be an appropriate contingency figure in the schematic design phase. |
|
Quantity and Cost Method or the Labor and Materials Method |
Detailed estimates |
|
General Conditions costs, |
including project signs, engineering surveys and inspections, tests, drawings and photographs, permits, and repairs and clean-up |
|
Detailed estimates |
Are an additional service |
|
Direct cost vs project cost |
Construction vs all other cost including soft costs |