• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back

contingency figure in the schematic design phase.

An allowance of 10 to 20% of the estimated project cost might be an appropriate contingency figure in the schematic design phase.

Quantity and Cost Method or the Labor and Materials Method

Detailed estimates

General Conditions costs,

including project signs, engineering surveys and inspections, tests, drawings and photographs, permits, and repairs and clean-up

Detailed estimates

Are an additional service

Direct cost vs project cost

Construction vs all other cost including soft costs