• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/121

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

121 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

What is the purpose of placing mats or cribbing under outrigger floats?

Distribute the force over a large area

spread it out

Where is the best location for leveling a crane?

Upperworks

not lowerworks

Before leveling a mobile crane on outriggers, an operator should ensure:

There is no weight of the crane bearing on any tires

Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered?

Keeping a 90% angle between cylinder rod and pad

When may blocking (cribbing) be placed under outrigger beams on mobile cranes?

Never approved

Mobile Cranes should be level to within what percent of grade

1%

Timber crane mats work best when they are:

Bolted together

When arriving in the crane at the job sitr, operator should first determine the condition of the:

Access roads

What surface listed below would NOT be a good location for assembly or setup of a mobile crane?

Above underground vaults

Each outrigger pad and its blocking should be sufficient to support?

The total weight of the crane and its load

How doeshigh wind affect a mobile crane with a long boom?

Introduces side load onto the boom

When is the only time the outrigger beams should be less than fully extended?

Th load chart indicated that this allowed

What is the primary purpose for a rooster sheave or auxiliary boom point sheave?

Separate the load hoist lines

Eccentric main boom tip reeving causes which of the following?

Twisting of main boom

Which type of wire rope listed below is installed on most cranes?

Right regular lay

The hoist drum flange shall extend a minimum of _________ over the top layeer of wire rope at all times while crane is in operation.

1/2 inch

Which of the following is classified as a standing wire rope?

Pendant line

When lifting on outriggers, floats or pads should always be:

Secured to the outriggers cylinder

How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from service?

6

What is the minimum design factor required for a right regular lay, boom or hoist wire rope?

3.5

On a mobile crane, how many broken wires are permitted at theend connection of a pendant before it must be taken out of service?

1

Type 1 rotation resistant hoist wire rope has a design factor of:

5 to 1

It is important to know when lubricating crane hoist wire rope, that the lubricant must:

Not hinder visual inspection

How often is the competent person required to inspect the running wire ropes on a mobile crane?

Each shift

On mobile cranes, how many broken wires must be present in one strand of one lay for running wire rope to be removed from service?

3

How many randomly distributed broken wires in rotation-resistant hoist wire rope are considered for replacement?

2 broken wires in a 6 rope diameters

According to OSHA, what is the minimum number of full wraps of wire rope that must remain on hoist drums in all service conditions?

2

On whose recommendations should a mobile crane preventative maintenance program be developed

Crane manufacturer

On a mobile crane, the measurement for the load radius is the distance from the center of gravity of the suspended load to the:

Center of rotation of the crane

On a mobile crane, should the load be applied when determining the proper boom angle?

Yes

On a mobile crane range diagram, boom length and boom angle can be used to determine?

Load radius

On a mobile crane, what is the weight of the stowed jib that is deducted in load chart calculations called?

Effective weight

When determining boom tip elevation for a mobile crane, the user could:

Use range diagram

The teerm net capacity is best defined by which of the terms listed below

Gross capacity minus capacity deductions

When lifting off the main boom, how is the effective weight of the fly/jib different in the erected position from that of the stowed position

Effective weight increases

Mobile cranes that are setup on barges, shall have a list chart provided by which of the entities listed below?

Manfacturer

When lifting loads on tires, mobile cranes are rated at what percentage of tipping?

75%

How does the effective weight of a stowed extension relate to the actual weight of the extension?

Lowered than actual weight

When load radius is between radii values, the operator must use the:

longer radius

Why do most crane manufacturer reduce load capacity for duty-cycle operations?

Side loading forces may occur

Why should approved attachments or extra counterweights provided by the manufacturer be placed on the rear of crane?

They coud cause a backward stability problem

A mobile crane's jib is offst 15 degrees versus its original 0 degree offset, but the boom angle remains unchanged. in this situation, the loadradius:

increases

What is the difference between an anti-two-block warning device and an anti-two-blockprevention device?

Warning device only warns, but prevention devices will stop the functions.

How can the LMI's boom length or load radius reading be verified?

Actual measurements

On mobile cranes, what does the boom angle indicator show the operator?

Angle of boom to horizontal

What is the device called that automatically stops the boom whenit rears the cranes maximum angle?

Boom hoist limiting

When the number of layer of wire rope on a drum increases the:

Allowable line pull decreases

On amobile crane, sideloading of the boom could be caused by which of the following?

Starting or stopping the swing too rapidly

Which person listed below, has the responibility for determining the correct weight of a load?

Lift Director

What must an operator do when an operator leaves the controls of the crane of an edxtended period of time?

Apply all brakes and dogs, and leave the load suspended

Abruptly stopping a rapid swing on a long-boom mobile crane will will produce what effect?

Collaspsing the boom

When should a tag line be used, during the hoisting of material?

When the rotation of the load would be dangerous

What percentage of the rated capacity of a mobile crane must be used when lifting with two cranes attached to the same load?

75%

When lifting a load with two mobile cranes, it is very important to:

Keep the hoist line of both cranes vertical

if lifting a load with two mobile cranes of different rated capacities, the crane with the larger rated capacity should:

be hooked at a distance closer to the loads center of gravity

When determining the position to a mobile crane should be left in over night, high winds in the forecast the operator should:

follow manufacturers recommendations

When performing a multiple crane lift it is importsny for the operator's of each crane to understand that:

The weight may increase if the other crane lands the load

When lifting loads that are submerged under water with a mobile crane, what is one of the conditions that the operator should be familiar with?

Load will increase when lifting the load out of the water

When lifting over water with personnel platform, what are the occupants of the platform required to wear?

A flotation device

If a mobile crane is NOT set-up level and the operator swings the load from the high side to low side, what effect will that have on the radius?

the radius increases

Increasing the distance from the crane's center of gravity to the tipping axis will have what effect on a mobile crane?

Increases stability

Backward stability of a mobile crane is tested in which configuration listed below?

Basic boom at maximum angle no load

What is the minimum pith diameter used for sheaves in q boom hoist reeving system using rotation resistant rope?

Not less than 18 times rope diameter

When can capacity altering modifications be made to mobile cranes?

When permission is given by the crane manufacturer

A cranee is at the point of instability when the crane's leverage on the load equals:

100% of the cranes leverage on the crane

Who must determine maximum speed for a mobile crane to travel with a suspended load?

A competent person

Deflection of the boom while operating a mobile crane will increase?

Load radius

A sudden start or stop of the hoisting function while operating a mobile crane can produce a:

Dynamic load

When traveling with a suspended load on a mobile crane climbing an incline, the load should be carried in which direction?

Uphill

Which mobile crane boom configuration can cause the most hazardous side-loading condition for the crane

Long boom with minimum radius

When preparing to hoist a load, the load block hook should be positioned:

Directly above the load's center of gravity

When making a lift on outriggers, the maximum ground-bearing pressure occurs in which boom position?

Over the corner

When personnel platforms are hoisted with a mobile crane with a mobile crane what item listed below

an anti two-block device

Personnel platforms suspended on the hook of a mobile crane, must

50%

When proof testing a personnel platform to 125% of its rated capacity, how long must the platform be suspended?

5 minutes

Which of the following correctly states the requirements for hooks used to hoist employees on crane-supported personnel platform?

Hooks shall have a latch that closes and locks

OSHA permits hoisting of personnel by a crane as long as the employer can show:

There is no less hazardous or practicable way

Before lifting an occupied personnel platform on a jobsite the crew must ensure they perform which of the following?

All of the above

Before lifting an occupied personnel platform on a jobsite , which of the following applies?

Allof the above

Which of the follwing standards or regulations governs the lifting of personnel in construction?

OSHA 1926.1431.

According to OSHA 1926.1431, whish device listed below must be attached to the crane?

Anti-two-block

According to OSHA 1926. 1431, which of these hoist options is prohibited?

Hoist free fall

Inside the personnel platform except for gates, how much of the perimeter must contain a grab rail for the occupants?

100 percent

According to OSHA 1926. 1431, during personnel platform hoisting operations, access gates shall NOT swing in which direction?

Outward

OHSA 1926.1431 states that tag lines must be used:

When necessary to control platform

According to OHSA 1926. 1431, while hoisting a personnel platform, what weather condition listed below will promptly discontinue the operation?

Dangerous

While hoisting employeesin a personnel platform, direct communication must be maintained between the signal person and who?

Operator

According to OSHA 1926. 1431. at what wind speed must a qualified persontobe consulted?

20 mph

If working near power lines and using a tag line, which type of rope is least conductive to electricity?

Polypropylene

When working near power line with a mobile crane, where does OHSA require caution stickers be installed on all equipment?

At operators station and 5 on the outside of the equipment

According to OSHA table T, what is the minimum clearence for 133kv powerlines?

10 feet

According to OSHA, when working near power lines when is a dedicated spotter required?

When crane operator is unstable to see the warning line of signs

According to OHSA's table T, what clearance should a mobile crane IN TRANSIT

16 feet

According to OHSA when is it safe to hoist loads with a mobilecrane below energized power line?

When the fully extended boom can't reach the prohibited zone

According to OSHA1926. 1408, when operating near high voltage power lines, what clearance shall be required when the rating of the lines is 275kV?

20 feet w/encroachment precautions

according toOSHA 1926. 1411, when yiu encounter power lines with a voltage of 44 kV and the crane is TRAVELING, according to TABLE T, what is the minimum required clearance?

6

According toOSHA 1926. 1408, the minimum clearance between any part of the crane and power line rated 50 kV or below shall be:

10 feet w/encroachment precautions

According to OSHA 1926. 1408, for power lines rated 110kV, the minimum clearance between the crane and any lines shall be?

15 feet w/encroachment precautions

The term "jib offset" can be expressed as the jib angle to which moblie crane component listed below?

Boom

On a mobile crane the term "part's of line" refers to which item listed below?

The number of lines running thur the load block and boom point sheaves

According to OHSA, mobilecrane load block hooks must not have a twist in excess of:

10 degrees

According to OSHA,mobile crane load block hooks must not have a throat opening in excess of:

15% of its original size

What is the design factor for grade 80 chain slings?

4

What grade alloy steel chain should be used for hoisting slings?

80

LOads rigged using a basket hitch should be to prevent slippage

Balanced

When slings encounters harpedges on loads to be lifted, riggers shall ensure that slings are:

Protected or padded

According to OSHA, quadruple sling bridle rating are the same as:

Triple sling bridle ratings

When correctly installing U-bolt type wire clips, the U portion of the clip shall be on:

The dead or short end

Which statement listed below is correct about basic load rigging?

As horizontal load angle decreases, stress increases

The approximate percentage of strength of choker, vertical, and basket hitches respectively are:

75%, 100%, 200%

According TO ASME which of the following listed below shall NOT be used for the suspension sytem on suspended personnel platforms?

Synthetic web bridle

When rigging a bundle of pipe or tubing, which of the following would provide the best bontact between sling and load?

Double wrap choker

What is the angle between the top of the load and the sling leg referred to in sling load charts?

Horizontal sling angle

when installing a wedge socket, it must be attached with the load line pulling in a straight line from the:

Pin

For any signal other than emergency stop, who is permitted to give hand signals to the crane operator during a lift?

A qualified signal person

What is the first element of voice signals given to crane operator prior to the lift?

Function and direction

according to OSHA, each series of voice signals contain how many elements?

Three

When directing a crane using voice signals the transmission must be through a channel that is:

Dedicated

Before commencing lifting operations, the operator and signal person must contact and identify each other when using which form of communication?

Basic signals

According to OSHA where must a signal chart be posted?

On the equipment or in the area of the hoisting opeations

How many auduble travel signals are there?

3