• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back

What is the best way to maximize return on investment when dealing equipment selection

Equipment must be evaluated on CPP (cost per unit of production) -this is the amount of time it takes to complete the work relative to the cost of renting, operating, and maintaining the equipment for that period of time.

what is equipment's production capability based on?

equipment's production capability is based on how quickly the work is completed.

cycle time

the amount of time that passes between the beginning of the action the equipment performs and the beginning of the next repetition of the action.




Ways to estimate cycle time:


Cycle Time = (effective working minutes) / (hour overall)


Cycle Time = (theoretical number of cycles per hour) * (numerical efficiency)

Excavation and Loading Equipment (use) (types of equipment)

used to excavate material for large earthwork cuts, to install underground utilities, to construct foundations etc


[backhoes:digging bucket on articulated arm on back of tractor or loader][excavator: for below level, confined locations, small cranes, pipes, and trenches][dragline: bucket with ropes][dozer:versatile for clearing, grubbing, shallow excavation, pushing scrappers, spreading, ripping][loader:fixed position excavator, transporter of material over short distances]

Excavation and Loading Equipment (capacity, and general production capability)

Struck Capacity- capacity when filled to rim. Heaped Capacity-capacity when material is mounded above the rim at a slope of 2:1. Load Capacity measured in in (LCY) Loose Cubic Yards [assumed to be heaped]


-----Production capacity is based on how much material can it move[loaded in an hour. Depend on cycle time and fill factor

Excavation and Loading Equipment: Backhoe (cycle time, fill factor, production capacity)



Cycle Time: time for loading the bucket, swinging the load over the haul equipment, dumping the load, and returning bucket to the excavation position.


Fill Factor: (actual loose volume of material being moved) / (heaped capacity of bucket)


Production Capacity: How much loose cubic yards of material per hour



Excavation and Loading Equipment: Exacavator (cycle time, fill factor, production capacity)

Production Capacity: How much loose cubic yards of material per hour


Cycle Time: time for loading the bucket, swinging the load over the haul equipment, dumping the load, and returning bucket to the excavation position.


Fill Factor: (actual loose volume of material being moved) / (heaped capacity of bucket)

Excavation and Loading Equipment: Dozer(cycle time, fill factor, production capacity)

Production Capacity: How much loose cubic yards of material per hour


Cycle Time: time it takes to maneuver the dozer into position, move the load, returning the dozer to loads, Depends on blade capacity volume[=V*0.375]


Fill Factor: (actual loose volume of material being moved) / (heaped capacity of bucket)

Excavation and Loading Equipment: Loaders(cycle time, fill factor, production capacity)

Cycle Time: time it takes to load the bucket, position the loader, travel to fill location, return to the borrow.


Production Capacity: How much loose cubic yards of material per hour


Fill Factor: (actual loose volume of material being moved) / (heaped capacity of bucket) [depending materials, used backhoes and excavators]

Consulting Engineer

-Hired by owner (no contractual obligation to GC or subcontractors)


-develop the design and contract documents


-observe construction project


-review contractor's payment requests


-processing of contract change orders