• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/141

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

141 Cards in this Set

  • Front
  • Back
An engineer or other specialist retained by the architect to provide specified professional services to the architect which the architect is required to provide to the owner under the owner-architect agreement.
Consultant
A contractor's written request for payment of the amount due on account of work completed and/or materials suitably stored on site. Also called application for payment.
Payment Request
Instructions in the bidding documents for preparing and submitting bids for a project. Also called instructions to bidders.
Notice to Bidders
A specification which calls for desired materials, products, systems and equipment by their trade names and model numbers.
Proprietary Specification
Fire and property damage insurance for a project during construction, usually purchased by the owner. Also called property insurance.
Builder's Risk Insurance
A term used to describe poor air qualitym which can lead to discomfort and possibly disease.
Sick Building Syndrome
A forecast of probable costs, as opposed to a firm bid.
Estimate
Instructions in the bidding documents for preparing and submitting bids for a project. Also called notice to bidders.
Instructions to Bidders
An amount established in an agreement between an owner and a contractor as the maximum cost of performign specified work. Also called the upset price.
Guaranteed Maximum Cost
A statement furnished to the architect by the contractor reflecting the amounts to be allotted for the principal divisions of the work. It serves as a guide for reviewing the contractor's periodic applications for payment.
Schedule of Values
A memorandum which outlines the types and limits of the insurance coverages carried by the contractor for a project.
Certificate of Insurance
An invitation to a selected list of contractors soliciting bids for a project.
Invitation to Bid
A shop drawing, project data, or sample submitted by the contractor to the architect for review prior to incorporation in the work.
Submittal
Coverage by contract (insurance policy), whereby one party (the insurance company) agrees to indemnify or reimburse another (the insured) against loss from a specified hazard.
Insurance
An agreement under which one party (the surety or bonding company) guarantees to make good to another party (the obligee or owner) the debt, default, or failure to perform of a third party (the principal of contractor). Also called a bond.
Surety Bond
A bond obtained by the contractor or owner, which guarantees that the project will be completed free of liens.
Completion Bond
An amount not included in the contract sum to cover the cost of certain items not specified in detail. Hardware and other finish items are often handled in this manner.
Cash Allowance
Failure to meet the ordinary standard of care expected of an architect or other professional in a specified circumstance.
Negligence
Indirect expense, that is, expenses indirectly incurred and not chargeable to a specified project. Also called an indirect expense.
Overhead Expense
A proprietary specification which requires a particular brand or trade name and does not permit any substitution.
Closed Proprietary Specification
A proposal by a bidder for an amount to be subtracted from or added to the base bid if the corresponding change in the work is accepted. This may be either a deductive or additive alternate.
Alternate Bid
Abbreviation for not-in-contract, referring to items neither furnished nor installed by the contractor.
NIC
The sum established by the owner as available for construction of the project.
Construction Budget
Insurance which financially protects an architect against claims for damages resulting from professional negligence. Also called errors and omissions insurance.
Professional Liability Insurance
Working drawings and specifications.
Construction Documents
The invitation to bid, instructions to bidders, bid form, and the contract documents.
Bidding Documents
Expense items directly incurred by or attributable to a specified project.
Direct Expense
An alternative to litigating a dispute, in which one or more arbitrators hears the evidence and renders a decision.
Arbitration
Direction of the work by the contractor's personnel. Supervision is not the responsibility of the architect.
Supervision
The sum of money stated in the bid for which the bidder offers to do the work, not including any alternate bids.
Base Bid
A document issued by the governing authority stating that a building complies with applicable laws and permitting occupancy for its designated use.
Certificate of Occupancy
An ordinance which specifies the period of time within which legal action must be brought to obtain legal relief for damage or injury.
Statue of Limitations
The part of the contract documents which states the rights, responsibilites, and relationships of the parties involved, usually by means of standard documents by the American Institute of Architects.
General Conditions
A proposal by a contractor to do the work required by the contract documents for a stipulated sum of money.
Bid
Any contractor on a project who has a contract directly with the owner.
Prime Contractor
The architect's representative at the site, who assists in the general administration of the construction contract for a project.
Project Representative
Payments made to the contractor during progress of the work on account of work completed and/or materials suitably stored.
Progress Payments
The period of time within which the work must be completed, as established in the contract documents.
Contract Time
A sum chargable against the contractor as reimbursement for damages suffered by the owner because of the contractor's failure to complete the work within a specified time.
Liquidated Damages
Statements or drawings which modify the basic contract documents after the latter have been issued to the bidders, but prior to taking of bids.
Addenda
A written order to the contractor, prepared by the architect and signed by the owner, contractor, and architect, which authorizes a change in the work, the contract sum, or the contract time.
Change Order
Management services performed by the architect or others, over and above normal architectural services, that contribute to the control of time and cost in the construction project.
Construction Management (CM)
A legally enforceable promise made by the warrantor.
Express Warranty
All materials and/or labor required for a project.
Work
The manual prepared by the architect for a project, including the technical specifications, bidding instructions and forms, general conditions, supplementary conditions, special conditions, and other legal and administrative documents.
Project Manual
An agreement under which the contractor, or the architect, is reimbursed for his or her costs, and, in addition, is paid a fee for his or her services.
Cost-Plus-Fee Contract
A contractual obligation whereby one party agrees to guarantee another party against loss or damage from specified liabilities. Also called indemnification.
Hold Harmless Clause
The architect's basic services expanded to include certain additional services, such as programming, land use studies, and so on.
Comprehensive Services
The General Requirements Division of the specifications which establishes the administrative and procedural duties of the contractor, architect, and owner during construction.
Division One
A bond which guarantees to the owner that the contractor will perform the work in accordance with the contract documents.
Performance Bond
A bond guaranteeing to the owner that the contractor will pay for all labor and materials used for the project.
Labor and Material Payment Bond
A system of planning and scheduling construction operations which analyzes sequences and durations of time using network diagrams.
Critical Path Method (CPM)
An amount added to the contract sum either by an accepted additive alternate or by a change order.
Addition (to the contract sum)
A contractual obligation whereby one party agrees to guarantee another party against loss or damage from specified liabilities. Also called the hold harmless clause.
Indemnification
Drawings prepared by the contractor, subcontractor, manufacturer, or supplier, showing how specified portions of the work shall be fabricated and/or installed.
Shop Drawings
A small-scale plan of a building or complex of buildings.
Key Plan
Insurance which covers workers' job-related injuries, usually required by law.
Workers' Compensation Insurance
The owner's job site representative.
Clerk of the Works
A provision in the construction contract for payment of a bonus to the contractor for completing the project prior to a specified date, and for a charge (penalty) against the contractor for failing to complete the project by that date.
Bonus and Penalty Clause
The total amount payable by the owner to the contractor, as stated in the owner-contractor agreement, for performing the work under the contract documents.
Contract Sum
Part of the contract documents, comprising written descriptions of materials, construction systems, and workmanship.
Specifications
A statement by the architect informing the owner of the amount due the contractor on account of work completed and/or materials suitably stored.
Certificate for Payment
A proposal by a bidder for an amount to be subtracted from the base bid if the corresponding change in the work is accepted.
Deductive Alternate
A clause in a cost plus fee contract between the owner and contractor in which the savings between the guaranteed maximum cost and the actual project costs are proportionally shared.
Incentive Clause
A list of items to be corrected or completed, which is provided by the contractor and usually expanded by the architect based on a detailed inspection of the work prior to substantial completion.
Punch List
Regulations which provide for accessibility to buildings and sites for persons with disabilities.
Barrier-Free Provisions
A charge against the contractor for failing to complete the project by a specified date.
Penalty
A term sometimes erroneously used to describe drawings revised to show changes made during construction. The correct term is record drawings.
As-Built Drawings
An agreement under which one party (the surety or bonding company) guarantees to make good to another party (the obligee or owner) the debt, default, or failure to perform of a thirdy party (the principal or contractor). Also called a surety bond.
Bond
An amount withheld from each payment to the contractor in accordance with the terms of the owner-contractor agreement.
Retainage
One of several owner-contractor agreements for a project, each of which provided for constructing a major portion of the work (general construction, electrical, mechanical, etc) by a different contract.
Separate Prime Contract
The requirement that a professional exercise reasonable ability and judgment in a specific circumstance, the absence of which constitutes negligence. Also called due care.
Standard of Care
The completion of all work in accordance with the terms and conditions of the contract documents.
Final Completion
The extra time available for a construction activity above its estimated time duration, without causing any delay of project completion.
Float
A contractor's written request for payment of the amount due on account of work completed and/or materials suitably stored on site. Also called a payment request.
Application for Payment
A proposal by a bidder for an amount to be added to the base bid if the corresponding change in the work is accepted.
Additive Alternate
An agreement providing for payment for professional services based upon the direct personnel expense multiplied by an agreed factor.
Multiple of Direct Personnel Expense Agreement
The date, certified by the architect, when the construction is sufficiently completed, in accordance with the contract documents, so that the owner can occupy the project for the intended use.
Date of Substantial Completion
An agreement under which the architect or contractor is paid a specific amount as the total fee for services performed. Also known as a lump sum contract.
Stipulated Sum Contract
The part of the contract documents, prepared by the architect, which graphically illustrates the construction required for the project.
Working Drawings
One who acts on behalf of another.
Agent
The difference between the list price and the actual price paid.
Trade Discount
Describing a construction procedure in which construction on each phase of a project is begun when its design is completed, without waiting for overall project design completion.
Fast-track
A material or assembly submitted for the architect's approval prior to manufacture or delivery to the project.
Sample
A legally enforceable assurance of the quality of materials and labor furnished for a project, or of the length of time that a project or a part thereof will perform satisfactorily. Also called a guarantee.
Warranty
Part of the contract documents, other than the general and supplementary conditions, describing unique conditions of a project.
Special Conditions
The architectural services normally required for a building project, usually consisting of schematic design, design development, construction documents, bidding or negotiation, and construction contract administration.
Basic Services
An individual or company that guarantees to make good to another party the debt, default, or failure to perform of a third party.
Surety
The contractor's representative at the site.
Superintendent
A legally enforceable assurance of the quality of materials and labor furnished for a project, or of the length of time that a project or a part thereof will perform satisfactorily. Also called a warranty.
Guarantee
An amount included in a construction budget, normally 5 to 10 percent, to provide for unforseen or unpredictable costs.
Contingency Allowance
Federal legislation that requires the Department of Labor to set prevailing wages for government financed construction projects.
Davis-Bacon Act
The exclusion from insurance coverage for liability arising out of (X) explosion or blasting, (C) collapse of or structural damage to a building, and (U) underground damaged caused by mechanical equipment.
XCU
Salaries and wages attributable to a specific project, plus benefits such as employment taxes, insurance, sick leave, holidays, vacations, pensions, and similar contributions and benefits.
Direct Personnel Expense (DPE)
Working drawings, specifications, addenda, general conditions of the contract, supplementary conditions, and the owner-contractor agreement.
Contract Documents
An approach to the delivery of goods or services in which quality is determined by customer satisfaction and conformance to requirements.
Total Quality Management (TQM)
A document prepared by the architect stating that the work is substantially complete, thereby establishing the date of substantial completion. It generally fixes the time within which the contractor must complete the unfinished work listed.
Certificate of Substantial Completion
The lowest bid which complies with all the stipulated requirements.
Lowest Acceptable Bona Fide Bid
The sum established by the owner as available for the entire project, including the construction budget, land cost, equipment cost, financing cost, cost of professional services, and contingency allowances.
Project Budget
Federal civil rights legislation which establishes the right of persons with disabilities to equal access to sites and buildings and sets design guidelines for its implementation.
Americans with Disabilities Act (ADA)
A legal document signed by a supplier of material or labor for a project, which releases his or her mechanic's lien against the property.
Release of Lien
Published public notice soliciting proposals for a construction project.
Advertisement for Bids
The maximum allowable cost of the construction work, as established in the owner-architect agreement.
Fixed Limit of Construction Cost
Part of the contract documents, prepared by the architect, which may modify provisions of the general conditions of the contract.
Supplementary Conditions
A deposit of money required for each bidder as security for the bidding documents, to ensure the return of the documents by unsuccessful bidders.
Deposit for Bidding Documents
The substitution of one entity for another with regard to legal rights.
Subrogation
A proprietary specification which names several acceptable materials, products, or systems, any of which may be used by the contractor.
Open Proprietary Specification
Professional services rendered by the architect, upon the owner's request, in addition to the basic servcies identified in the owner architect agreement. Also called extra services.
Additional Services (of the architect)
A choice given to the contractor to provide specified alternates without prior approval of the architect.
Option
A specification which describes all product components, arrangements, assembly methods, properties, and other details and requirements.
Descriptive Specification
On-site examination of the contractor's work by the architect to determine in general if it is proceeding in accordance with the contract documents.
Observation
Acronym for project evaluation review technique. A form of network analysis developed for military work and similar to the critical path method.
PERT
An owner-architect agreement under which the professional fee is based upon a percentage of the construction cost of the project.
Percentage Agreement
Insurance which financially protects an architect against claims for damages resulting from professional negligence. Also called professional liability insurance.
Errors and Omissions Insurance
An amount established in an agreement between an owner and a contractor as the maximum cost of performing specified work. Also called the guaranteed maximum cost.
Upset Price
Overhead expense, that is, expenses indirectly incurred and not chargeable to a specified project. Also called overhead expense.
Indirect Expense
A specification which refers to quality standards established by recognized testing authorities or by the federal government.
Reference Specification
A term sometimes erroneously used to describe drawings revised to show changes made during construction. Sometimes erroneously called as-built drawings.
Record Drawings
A contract for building construction under which one prime contractor is responsible for the entire project, in contrast to having separate contracts.
Single Prime Contract
The agreement between the owner and the contractor for the construction of a project.
General Contract
An amount, stated in dollars per unit, provided by the contractor with his or her bid for adding or deleting specific portions of the work.
Unit Price
A surety bond guaranteeing that the bidder will sign a contract, if offered, in accordance with his or her proposal.
Bid Bond
The requirement that a professional exercise reasonable ability and judgment in a specific circumstance, the absence of which constitutes negligence. Also called standard of care.
Due Care
A document by which one relinquishes the right of a mechanic's lien against the property of another.
Waiver of Lien
One who has a contract with a prime contractor to perform a portion of the work.
Subcontractor
Fire and property damage insurance for a project during construction, usually purchased by the owner. Also called builder's risk insurance.
Property Insurance
An item of work involving additional cost.
Extra
A written statement of the owner's conditions and requirements for the project.
Program
Professional services rendered by the architect, upon the owner's request, in addition to the basic services identified in the owner-architect agreement. Also called additional services (of the architect).
Extra Services
A document signed by the owner and the architect, which authorizes a change in the work, the contract sum, or the contract time. It is used when there is not complete agreement on the terms of a change order.
Construction Change Directive
A systematic listing of construction trades, materials, systems, and administrative requirements published by the Construction Specifications Institutue (CSI) for the purpose of organizing construction specifications.
CSI MasterFormat
The elements which comprise an exit to the outside, including aisles, corridors, doors, and stairways.
Means of Egress
Insurance which financially protects the insured against liability on account of bodily injury or property damage sustained by another.
Liability Insurance
An agreement under which the architect or contractor is paid a specific amount as the total fee for services performed. Also called a stipulate sum contract.
Lump Sum Contract
A letter signifying intention to enter into a formal agreement and setting forth the general terms thereof.
Letter of Intent
Additional services rendered to the owner by the architect following actual completion of the project.
Post-Completion Services
A material, system, or product proposed by a contractor as being equivalent to that required by the contract documents.
Substitution
A specification which defines products or systems by describing end results.
Performance Specification
As defined in the AIA General Conditions, completion of a project to the point where the owner can occupy all or designated portions of the work for the purpose for which it is intended.
Substantial Completion
A claim on property by those who furnish material or labor for the construction of a building. Clear title to the property cannot be obtained until the claim is settled.
Mechanic's Lien
A material or method that is approved by the architect as being equivalent to what was originally specified.
Approved Equal