• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/40

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

40 Cards in this Set

  • Front
  • Back

What informatin can you find under the COMNAVSURFORINST 4400.1 APPENDIX D?


(D-1)

DLRs

DLRs migrated from APA to what fund?


(D-1)

NWCF

Who is responsible for ensuring compliance with DLR directives and procedures relative to departmental turn–ins?


(D-1)

SUPPO

What report is use to inform the CO of DLR program support?


(D-1)

daily Eight O'clock report and Monthly report

DLRs discovered missing will be aggressively researched,surveyed and processed within how many working days of discovery?


(D-1)

10

DLRs are centrally managed by whom?


(D-1)

NAVICP Mechanicsburg and
Philadelphia
Advice Code
5A
Item required to replace missing or damaged DLR(survey required)
Advice Code
5D
–initial outfitting/installation or
increased allowance
–No NRFI carcass will be turned–into the supply system on an exchange basis


Advice Code


5G

NRFI carcass will be turned into supply system on an exchange basis (1 for 1)

Advice Code


5S

Remain-in-Place
Advice Code
5X
For use with DARS requisitioned for NWCF stock
Advice code
52
For COMNAVSURFPAC ships only: Applicable to 5S/2B combination. Exchange requisitions with delayed carcass return intended and
substitute items not acceptable

Who validates all 5S requisitions and changes the Advice Code from 5S to 5G for non–RIP worthy items?


(D-2)

NAVICP–M
What are the two prices used to requisition DLRs?
Standard
Net price.

What price is described as Obligated by the requisitioner and billed by the issuing stock point when no NRFI carcass is available for turn–in?


(D-2)


Requisitions citing advice code 5A will be billed at standard price.

Standard price

What price is described as Obligated by the requisitioner when a NRFI carcass is being turned in, or will be turned in?


(D-2)


Advice codes 5G and 5S will be billed at net price.

Net Price

Even number cognizance symbols denote material carried in what account?


(D-3)

Appropriation Purchases Account (APA) Repairables

Most APA material is consider what?


(D-3)

high dollar value DLRs and must be afforded the same strict accountability given to NSA (7-cog) DLRs.

APA DLR carcasses must be turned–in to?


(D-3)

ATAC hub or node in the same manner as 7–cog DLRs

Name the R-Supply report JSL326?


(D-3)

Carcass Tracking Report
use to track BK2 responses and for audit purposes

DLR files and records will be kept for how long?


(D-3)

current and two prior
fiscal years

ATAC stands for?


(D-4)

Advance Traceability and Control
What will be submitted if turn–in will be delayed beyond the prescribed Transaction Item
Report (TIR) time frames?
BK2
Before transferring "A" condition DLRs as excess,
Supply Officers will verify what?
that the item is no longer authorized as part of
the command's fixed allowance or is in excess of allowance
What position is C/C 1–3?
Document Identifier
What position is C/C 52–53?
Fund Code
(B) for excess RFI DLRs
What position is C/C 72?
Management Code
What position is C/C 71?
condition codes
The NAVSUP P–485 sets the supply survey threshold for DLRs at what dollar amount?

(D-4)

$2,500
DOP stands for?
The Designated
Overhaul Point
Units are required to respond to all BK1, BK3, and BKR (BK2 Rejects) follow–up requests within how many days after receipt of the follow–up?

(D-5)

15 days
Keep a separate file of all incoming/outgoing BK related messages in what sequence?

(D-6)

in Date–Time–Group (DTG) sequence
Carcass charges exceeding what % of DLR obligations FYTD are considered excessive?

(D-6)

3%

What percent threshold of total DLR obligations FYTD are an automatic disqualification for eligibility for the Supply Blue “E”?

(D-6)

10, 15, and 20 percent
Carcass charges exceeding 15% of DLR obligations FYTD is consider?

(D-6)

serious loss of accountability
Carcass charges exceeding 20% of DLR obligations FYTD is consider?

(D-7)

an extreme case
What program provide testing, diagnostics,and repair capabilities to accomplish repair on electronics at the organization and intermediate (O and I) levels?

(D-7)

2M
What system provides asset visibility from “cradle to grave” during the entire transit of the asset (DLRs)?

(D-8)

Electronic Retrograde Management System(eRMS)

Who procures DLRs on the premise that NRFI DLRs will be quickly shipped to the designated collection point?


(D-1)

The Inventory Control Point (ICP)

What is a SPAWARSYSCEN stand-alone PC program which improves management of DLRs shipped within the Navy ATAC system?


(D-8)

Fleet Automated Control Transportation System


(FACTS)