Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
23 Cards in this Set
- Front
- Back
Four tactical phases of searching for victims
|
1. Surface Victim Removal
2. Void Access and Search 3. Selective Debris Removal 4. General Debris Removal |
|
NFPA Standard on Operations and Training for Technical Search and Rescue Incidents
|
NFPA 1670
|
|
4 Types of Construction
|
1. Light Frame
2. Heavy Wall 3. Heavy Floor 4. Precast Concrete |
|
5 Types of Collapse
|
1. Pancake
2. V-Shaped 3. Lean-to 4. A-frame 5. Cantilever |
|
Oxygen level needed without supplied air
|
between 19.5 and 23.5
|
|
Wood's weight per cubic foot
|
35 lbs
|
|
Masonry's weight per cubic foot
|
125 lbs
|
|
Concrete's weight per cubic foot
|
150 lbs
|
|
Structural Steel's weight per cubic foot
|
490 lbs
|
|
1 three second blast
|
Cease Operation/All quiet
|
|
3 one second blasts
|
Evacuate the area
|
|
One long and one short blast
|
Resume Operations
|
|
Top of X
|
Date and Time Search team left structure
|
|
Bottom of X
|
Total Victims left inside
|
|
Right of X
|
Hazards
|
|
Left of X
|
Search Team name
|
|
What kind of lever is a wheelbarrow?
|
Class 2
|
|
What is the limit for shoring
|
3 times the length
|
|
How much should corners be overlapped on cribbing
|
4 inches
|
|
How many lbs of contact for a 4x4 cribbing
|
6000 lbs
|
|
|
Significantly Damaged
|
|
|
Not safe for search and rescue
|
|
|
Structure is accessible
|