• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/12

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

12 Cards in this Set

  • Front
  • Back
Cost management system
System to provide information about the cost of process, products, and services used and produced by an organization.
Cost Systems should have
1) Cost Systems should have a decision focus.

2) Different cost information is used for different purposes.

3) Cost information for managerial purposes must meet the cost-benefit test.
Predetermined overhead rate
Estimate overhead/Estimated allocation base
Two stage cost allocation
Process of first allocating costs to intermediate cost pools and then to individual cost objects using different allocation bases.
job
unit of product that is easily distinguished from other units
continuous flow processing
system that mass-produces a single, homogenous output in a conituning process
job costing
accounting system that traces costs to individual units or to specific jobs, contracts, or batches of goods.

ie. construction, consulting, hospitals
process costing
accounting system used when identical units are produced through a series of uniform production steps

ie. Pertroleum, Paint
operation costing
Hybrid costing system often used in manufacturing goods that have some common characteristics plus some individual characteristics

ie. Clothing, Automobile, Furniture
operation
standarized method or technique that is repetively performed.
overhead as a percentage of labor costs
overhead related to direct labor/ direct labor costs
Watch Allocation Base!!, Make sure to convert to labor hours etcetra
If units are produced are given, multiply by labor hours used for to produce units to get total labor hours!