20 Cards in this Set

  • Front
  • Back

To determine stud length, the carpenter must know the _____.




A. thickness of the finished floor


B. thickness of the ceiling below the ceiling joists


C. height from the finished floor to the finished ceiling


D. all the above

all the above

The carpenter must determine ______ size from information contained in the door and window schedules.

rough opening

When laying out a rough opening, a clearance of ______ is usually maintained between the door frame and the rough opening.

1/2"

The sides and tops of a door frame are called _____.

jambs

Interior partitions on a set of prints are usually _____.

dimensioned to their centreline

When laying out studs, ______

keep the studs directly in line with the joist below

Prior to bracing the end sections of a wall, an easy and effective way to check the wall section for square is to ______.

measure the wall from corner to corner both ways to see if they are the same.

For accurate plumbing or corner posts on a windy day, use ______

a 6' level with accessory aluminum blocks attached to each end

a job-built combination wall aligner and brace is called a(n) _______

spring brace

softboard sheathing is fastened to the wall using _____ nails.

roofing

A(n) _____ is an opening framed in the wall in which to install doors and windows

rough opening

The bottom member of a door frame is called a(n) _____

threshold or sill

Consulting the manufactures' _____ is the best way to determine window rough openings.

window schedule or catalog

The first step in laying out wall openings is to consult the set of prints to the _______ dimension of all the openings.

center

To avoid problems when installing finish work, it is important that all the edges of frame members be kept ______ wherever they join each other.

flush

All studs in a wall should have their crowned edges facing in the ______ direction.

same

When applying temporary bracing to an erected wall, use _____ nails or drive the nails only partway into the lumber.

duplex

Partitions that carry a load are referred to as _____ partitions

load-bearing

Wall ____ covers the exterior walls.

sheathing

When estimating material for an exterior wall with a layout that is 16" on centre, figure _____ stud(s) for each linear foot.

one