• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back

If a person is not sure a piece of equipment is safe to work on, he or she should:


a) ask his or her foreman if it's safe


b) check the isolator's name on the permit


c) check with a co-worker before proceeding


d) rely fully on the permit information


e) ask a qualified worker to indicate and explain points of isolation

E

Ensuring the complete isolation of a piece of equipment prior to maintenance is the responsibility of:


a) the Plant Safety Committee


b) the Operations Department


c) the Maintenance Department


d) both the Operating and Maintenance Departments


e) the Plant Manager

D

After completing isolation of equipment you must _______.

enter the completed isolations in the logbook.

In order to protect driven equipment from damage:


a) ensure the discharge valve is closed first


b) the driver must be isolated first


c) the belts must be removed first


d) a lock must be placed on the drain valve first

B

When isolating a motor for maintenance you should:


a) remove the fuses


b) install a lockout clamp on the breaker handle


c) place a DO NOT OPERATE tag on the breaker


d) open the breaker


e) do all of the above

E

List the correct order for the steps required to prepare a boiler for internal and external inspection.


1. Isolate, drain, and lock out boiler


2. Ventilate enclosed spaces


3. Notify boiler inspector


4. Prepare Boiler for Hydrostatic test


5. Cool down the boiler for entry

3, 1, 5, 2, 4