147 Cards in this Set
- Front
- Back
Develop Project Charter – Input
|
-Business Documents
-Agreements |
|
Develop Project Charter – Tools & Techniques
|
-Expert Judgment
-Data Gathering -Interpersonal and Team Skills -Meetings |
|
Develop Project Charter – Output
|
-Project Charter
-Assumption Log |
|
Develop Project Management Plan – Input
|
-Project Charter
-Outputs from Planning Processes -Enterprise Environmental Factors -Organizational Process Assets |
|
Develop Project Management Plan – Tools & Techniques
|
-Expert Judgment
-Data Gathering -Interpersonal and Team Skills -Meetings |
|
Develop Project Management Plan – Output
|
-Project Management Plan
|
|
Direct and Manage Project Work – Input
|
-Project Management Plan
-Project Documents -Organizational Process Assets |
|
Direct and Manage Project Work – Tools & Techniques |
-Expert Judgment -Project Management Information System -Meetings |
|
Direct and Manage Project Work – Output
|
-Deliverables
-Work Performance Data -Issue Log -Organizational Process Assets Updates |
|
Manage Project Knowledge – Input |
-Project Management Plan -Project Documents -Deliverables -Enterprise Environmental Factors -Organizational Process Assets |
|
Manage Project Knowledge – Tools & Techniques |
-Expert Judgment -Knowledge Management -Information Management -Interpersonal and Team Skills |
|
Manage Project Knowledge – Output |
-Lessons Learned Register -Project Management Plan Updates -Organizational Process Assets Updates |
|
Monitor and Control Project Work – Input
|
-Project Management Plan
-Project Documents -Agreements -Organizational Process Assets |
|
Monitor and Control Project Work – Tools & Techniques
|
-Expert Judgment
-Data Analysis -Decision Making -Meetings |
|
Monitor and Control Project Work – Output
|
-Work Performance Reports -Change Requests-Project Management Plan Updates -Project Document Updates |
|
Perform Integrated Change Control – Input
|
-Project Management Plan
-Project Documents -Organizational Process Assets |
|
Perform Integrated Change Control – Tools & Techniques
|
-Expert Judgment
-Change Control -Decision Making -Meetings |
|
Perform Integrated Change Control – Output
|
-Approved Change Requests
-Project Management Plan Updates |
|
Close Project or Phase – Input
|
-Project Charter
-Project Management Plan -Project Documents -Accepted Deliverables -Business Documents -Agreements -Procurement Documentation |
|
Close Project or Phase – Tools & Techniques
|
-Expert Judgment
-Data Analysis -Meetings |
|
Close Project or Phase – Output
|
-Project Document Updates -Final Product, Service, or Result Transition-Final Report |
|
Plan Scope Management: Inputs |
-Project Charter -Project Management Plan -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Scope Management: Tools and Techniques |
-Expert Judgment -Data Analysis -Meetings |
|
Plan Scope Management: Outputs |
-Scope Management Plan -Requirements Management Plan |
|
Collect Requirements – Input
|
-Project Charter
-Project Management Plan -Project Documents -Business Documents -Agreements -Enterprise Environmental Factors -Organizational Process Assets |
|
Collect Requirements – Tools & Techniques
|
-Expert Judgments
-Data Gathering -Data Analysis -Decision Making -Data Representation -Interpersonal and Team Skills -Context Diagram |
|
Collect Requirements – Output
|
-Requirements Documentation
-Requirements Traceability Matrix |
|
Define Scope – Input
|
-Project Charter
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Define Scope – Tools & Techniques
|
-Expert Judgment
-Data Analysis -Decision Making -Interpersonal and Team Skills |
|
Define Scope – Output
|
-Project Scope Statement
-Project Document Updates |
|
Create WBS – Input
|
-Project Management Plan
-Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Create WBS – Tools & Techniques
|
-Expert Judgement -Decomposition |
|
Create WBS – Output
|
-Scope Baseline
-Project Document Updates |
|
Validate Scope – Input
|
-Project Management Plan
-Project Documents |
|
Validate Scope – Tools & Techniques
|
-Inspection
-Decision Making |
|
Validate Scope – Output
|
-Accepted Deliverables -Work Performance Information -Change Requests -Project Document Updates |
|
Control Scope – Input
|
-Project Management Plan
-Project Documents |
|
Control Scope – Tools & Techniques
|
-Data Analysis
|
|
Control Scope – Output
|
-Work Performance Information
-Change Requests -Project Management Plan Updates -Project Document Updates |
|
Plan Schedule Management: Inputs |
-Project Charter -Project Management Plan -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Schedule Management: Tools and Techniques |
-Expert Judgment -Data Analysis -Meetings |
|
Plan Schedule Management: Outputs |
-Schedule Management Plan |
|
Define Activities – Input
|
-Project Management Plan -Enterprise Environmental Factors-Organizational Process Assets |
|
Define Activities – Tools & Techniques
|
-Decomposition |
|
Define Activities – Output
|
-Activity List
-Activity Attributes -Milestone List -Change Requests -Project Management Plan Updates |
|
Sequence Activities – Input
|
-Project Management Plan
-Project Documents -Enterprise Environmental Factors |
|
Sequence Activities – Tools & Techniques
|
-Precedence Diagramming Method (PDM)
-Dependency Determination and Integration -Leads and Lags |
|
Sequence Activities – Output
|
-Project Scheduled Network Diagrams
-Project Documents Updates |
|
Estimate Activity Durations – Input
|
-Project Management Plan
-Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Estimate Activity Durations – Tools & Techniques
|
-Expert Judgment
-Analogous Estimating -Parametric Estimating -Three-Point Estimating -Bottom Up Estimating -Data Analysis -Decision Making -Meetings |
|
Estimate Activity Durations – Output
|
-Duration Estimates
-Basis of Estimates |
|
Develop Schedule – Input
|
-Project Management Plan
-Project Documents -Work Performance Information -Agreements -Enterprise Environmental Factors -Organizational Process Assets |
|
Develop Schedule – Tools & Techniques
|
-Schedule Network Analysis
-Critical Path Method -Resource Optimization -Data Analysis -Leads and Lags |
|
Develop Schedule – Output
|
-Schedule Baseline
-Project Schedule -Project Management Plan Updates -Project Documents Updates |
|
Control Schedule – Input
|
-Project Management Plan
-Project Documents |
|
Control Schedule – Tools & Techniques
|
-Data Analysis
-Critical Path Method -Project Management Information System -Resource Optimization -Leads and Lags -Schedule Compression |
|
Control Schedule – Output
|
-Work Performance Information
-Schedule Forecasts |
|
Plan Cost Management: Inputs |
-Project Charter -Project Management Plan -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Cost Management: Tools and Techniques |
-Expert Judgment -Data Analysis-Meetings |
|
Plan Cost Management: Outputs |
-Cost Management Plan |
|
Estimate Costs – Input
|
-Project Charter
-Project Management Plan -Enterprise Environmental Factors -Organizational Process Assets |
|
Estimate Costs – Tools & Techniques
|
-Expert Judgment
-Analogous Estimating -Parametric Estimating -Bottom Up Estimating -Three-Point Estimating -Data Analysis -Project Management Information System -Decision Making |
|
Estimate Costs – Output
|
-Cost Estimates
-Basis of Estimates -Project Document Updates |
|
Determine Budget – Input
|
-Project Management Plan
-Project Documents -Business Documents -Agreements -Enterprise Environmental Factors -Organizational Process Assets |
|
Determine Budget – Tools & Techniques
|
-Expert Judgment -Cost Aggregation -Data Analysis -Financing |
|
Determine Budget – Output
|
-Cost Baseline
-Project Funding Requirements -Project Document Updates |
|
Control Costs – Input
|
-Project Management Plan
-Project Documents |
|
Control Costs – Tools & Techniques
|
-Expert Judgement
-Data Analysis -To-Complete Performance Index |
|
Control Costs – Output
|
-Work Performance Information
-Cost Forecasts -Change Requests -Project Management Plan Updates -Project Document Updates |
|
Plan Quality Management: Inputs
|
-Project Charter
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Quality Management: Tools and Techniques
|
-Expert Judgement -Data Gathering -Data Analysis -Decision Making -Data Representation -Test and Inspection Planning -Meeting |
|
Plan Quality Management: Outputs
|
-Quality Management Plan
-Quality Metrics -Project Management Plan Updates -Project Documents Updates |
|
Manage Quality: Inputs
|
-Project Management Plan
-Project Documents -Organizational Process Assets |
|
Manage Quality: Tools and Techniques
|
-Data Gathering
-Data Analysis -Decision Making -Data Representation -Audits -Design for X -Problem Solving -Quality Improvement Methods |
|
Manage Quality: Outputs
|
-Quality Reports
-Test and Evaluation Documents |
|
Control Quality: Inputs
|
-Project Management Plan
-Project Documents -Approved Change Requests -Organizational Process Assets |
|
Control Quality: Tools and Techniques
|
-Data Gathering
-Data Analysis -Inspection -Testing/Product Evaluation -Data Representation -Meetings |
|
Control Quality: Outputs
|
-Quality Control Measurements
-Verified Deliverables -Work Performance Information |
|
Plan Resource Management: Inputs |
-Project Charter -Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Resource Management: Tools and Techniques |
-Expert Judgement -Data Representation -Organizational Theory -Meetings |
|
Plan Resource Management: Outputs |
-Resource Management Plan -Team Charter -Project Document Updates |
|
Estimate Activity Resources: Inputs |
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Estimate Activity Resources: Tools and Techniques |
-Expert Judgement -Analogous Estimating -Parametric Estimating -Three point Estimating -Bottom Up Estimating -Data Analysis -Decision Making -Meetings |
|
Estimate Activity Resources: Outputs |
-Duration Estimates -Basis of Estimates -Project Document Updates |
|
Acquire Resources: Inputs |
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Acquire Resources: Tools and Techniques |
-Decision Making -Interpersonal and Team Skills -Pre-Assignment -Virtual Teams |
|
Acquire Resources: Outputs |
-Physical Resource Assignment -Project Team Assignment -Resource Calendar -Change Requests -Project Management Plan Updates -Project Documents Updates -Enterprise Environmental Factors Updates -Organizational Process Assets Updates |
|
Develop Team: Inputs |
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Develop Team: Tools and Techniques |
-Colocation -Virtual Teams -Communication Technology -Interpersonal and Team Skills -Recognition and Rewards -Training -Individual and Team Assessments -Meetings |
|
Develop Team: Outputs |
-Team Performance Assessments -Change Requests -Project Management Plan Updates -Project Document Updates -Enterprise Environmental Factors Updates -Organizational Process Assets Updates |
|
Manage Team: Inputs |
-Project Management Plan -Project Documents -Work Performance Reports -Enterprise Environmental Factors -Organizational Process Assets |
|
Manage Team: Tools and Techniques |
-Interpersonal and Team Skills -Project Management Information System |
|
Manage Team: Outputs |
-Change Requests -Project Management Plan Updates -Project Document Updates -Enterprise Environmental Factors Updates |
|
Control Resources: Inputs |
-Project Management Plan -Project Documents -Work Performance Data -Agreements -Organizational Process Assets |
|
Control Resources: Tools and Techniques |
-Data Analysis -Problem Solving -Interpersonal and Team Skills -Project Management Information System |
|
Control Resources: Outputs |
-Work Performance Information -Change Requests -Project management Plan Updates -Project Document Updates |
|
Plan Communications Management: Inputs |
-Project Charter -Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Communications Management: Tools and Techniques |
-Expert Judgement -Communication Requirements Analysis -Communications Technology -Communications Model -Communications Methods -Interpersonal and Team Skills -Data Representation -Meetings |
|
Plan Communications Management: Outputs |
-Communications Management Plan -Project Management Plan Updates -Project Documents Updates |
|
Manage Communications: Inputs |
-Project Management Plan -Project Documents -Work Performance Report -Enterprise Environmental Factors -Organizational Process Assets |
|
Manage Communications: Tools and Techniques |
-Communications Technology
-Communications Methods -Communications Skills -Project Management Information System -Project Reporting -Interpersonal and Team Skills -Meetings |
|
Manage Communications: Outputs |
-Project Communications -Project Management Plan Updates -Project Document Updates -Organizational Process Assets Updates |
|
Monitor Communications: Inputs |
-Project Management Plan -Project Documents -Work Performance Report -Enterprise Environmental Factors -Organizational Process Assets |
|
Monitor Communications: Tools and Techniques |
-Expert Judgement -Project Management Information System -Data Analysis -Interpersonal and Team Skills -Meetings |
|
Monitor Communications: Outputs |
-Work Performance Information -Change Requests -Project Management Plan Updates -Project Documents Updates |
|
Planning Risk Management – Input
|
-Project Charter -Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Planning Risk Management – Tools & Techniques
|
-Expert Judgement
-Data Analysis -Meetings |
|
Planning Risk Management – Output
|
-Risk Management Plan
(Methodology, Roles and Responsibilities, Budgeting, Timing, Risk Categories, Definition of Risk Probability and Impact, Probability/Impact Matrix, Revised Stakeholder’s Tolerance, Reporting Formats, Tracking) |
|
Identify Risks – Input
|
-Project Management Plan -Project Documents -Agreements -Procurement Documentation -Enterprise Environmental Factors -Organizational Process Assets |
|
Identify Risks – Tools & Techniques
|
-Expert Judgment -Data Gathering -Data Analysis -Interpersonal and Team Skills -Prompt List -Meetings |
|
Identify Risks – Output
|
-Risk Register -Risk Report -Project Document Updates |
|
Perform Qualitative Risk Analysis – Input
|
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Perform Qualitative Risk Analysis – Tools & Techniques
|
-Expert Judgment -Data Gathering -Data Analysis -Interpersonal and Team Skills -Risk Categorization -Data Representation -Meetings |
|
Perform Qualitative Risk Analysis – Output
|
-Project Document Updates Assumption Log Issue Log Risk Register Risk Report |
|
Perform Quantitative Risk Analysis – Input
|
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Perform Quantitative Risk Analysis – Tools & Techniques
|
-Expert Judgment -Data Gathering -Interpersonal and Team Skills -Representations of Uncertainty -Data Analysis |
|
Perform Quantitative Risk Analysis – Output
|
-Project Document Updates Risk Report |
|
Plan Risk Responses – Input
|
-Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Risk Responses – Tools & Techniques
|
-Expert Judgment -Data Gathering -Interpersonal and Team Skills -Strategies for Threats -Strategies for Opportunities -Contingent Response Strategies -Strategies for Overall Project Risk -Data Analysis -Decision Making |
|
Plan Risk Responses – Output
|
-Change Requests
-Project Management Plan Updates -Project Document Updates |
|
Implement Risk Responses: Inputs |
-Project Management Plan -Project Documents -Organizational Process Assets |
|
Implement Risk Responses: Tools and Techniques |
-Expert Judgement -Interpersonal and Team Skills -Project Management Information Systems |
|
Implement Risk Responses: Outputs |
-Change Request -Project Documents Updates |
|
Monitor Risks – Input
|
-Project Management Plan
-Project Documents -Work Performance Data -Work Performance Reports |
|
Monitor Risks – Tools & Techniques
|
-Data Analysis -Audits -Meetings |
|
Monitor Risks – Output
|
-Work Performance Information -Change Requests -Project Management Plan Updates -Project Document Updates -Organizational Process Assets Updates |
|
Plan Procurement's – Input
|
-Project Charter -Project Management Plan -Project Documents -Enterprise Environmental Factors -Organizational Process Assets |
|
Plan Procurement's – Tools & Techniques
|
-Expert Judgment -Data Gathering -Data Analysis -Source Selection Analysis -Meetings |
|
Plan Procurement's – Output
|
-Procurement Management Plan -Procurement Strategy -Bid Document -Procurement Statement of Work -Source Selection Criteria -Make or Buy Decisions -Independent Cost Estimates -Change Requests -Project Document Updates -Organizational Process Assets Updates |
|
Conduct Procurement's – Input
|
-Project Management Plan -Project Documents -Procurement Documentation-Seller Proposals -Enterprise Environmental Factors -Organizational Process Assets |
|
Conduct Procurement's – Tools & Techniques
|
-Expert Judgment -Advertising -Bidder Conference -Data Analysis -Interpersonal and Team Skills |
|
Conduct Procurement's – Output
|
-Selected Seller(S)
-Agreements -Change Requests -Project Management Plan Updates -Project Document Updates -Organizational Process Assets Updates |
|
Control Procurement's – Input
|
-Project Management Plan -Project Documents -Agreements -Procurement Documentation -Approved Change Requests -Work Performance Data -Enterprise Environmental Factors-Organizational Process Assets |
|
Control Procurement's – Tools & Techniques
|
-Expert Judgment -Claims Administration -Data Analysis -Inspection -Audits |
|
Control Procurement's – Output
|
-Closed Procurement's -Work Performance Information -Procurement's Documentation Updates -Change Requests -Project Management Plan Updates -Project Document Updates -Organizational Process Assets |
|
Identify Stakeholders – Input
|
-Project Charter -Business Documents -Project Management Plan -Project Documents -Agreements -Enterprise Environmental Factors-Organizational Process Assets |
|
Identify Stakeholders – Tools & Techniques
|
-Expert Judgment -Data Gathering -Data Analysis -Data Representation -Meetings |
|
Identify Stakeholders – Output
|
-Stakeholder Register -Change requests -Project Management Plan Updates -Project Document Updates |
|
Plan Stakeholder Engagement: Inputs
|
-Project Charter -Project Management Plan -Project Documents -Agreements -Enterprise Environmental Factors-Organizational Process Assets |
|
Plan Stakeholder Engagement: Tools and Techniques
|
-Expert Judgment -Data Gathering -Data Analysis -Decision Making -Data Representation -Meetings |
|
Plan Stakeholder Engagement: Outputs
|
-Stakeholder Engagement Plan
|
|
Manage Stakeholder Engagement: Inputs
|
-Project Management Plan -Project Documents -Enterprise Environmental Factors-Organizational Process Assets |
|
Manage Stakeholder Engagement: Tools and Techniques
|
-Expert Judgment -Communication Skills -Interpersonal and Team Skills -Ground Rules -Meetings |
|
Manage Stakeholder Engagement: Outputs
|
-Change Requests -Project Management Plan Updates -Project Document Updates |
|
Monitor Stakeholder Engagement: Inputs
|
-Project Management Plan -Project Documents -Work Performance Data -Enterprise Environmental Factors-Organizational Process Assets |
|
Monitor Stakeholder Engagement: Tools and Techniques
|
-Data Analysis -Decision Making -Data Representation -Communication Skills -Interpersonal and Team Skills -Meetings |
|
Monitor Stakeholder Engagement: Outputs
|
-Work Performance Information -Change Requests -Project Management Plan Updates -Project Document Updates |