• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

http://www.homeworkfortune.com/BUS-519-Assignment-4-Project-Process-Flayton-Electronics-BUS519-08.htm

BUS 519 Assignment 4 - Project Process(Flayton Electronics)

www.homeworkfortune.com


Note: The assignments are a series of papers that are based on the same case. The assignments are dependent upon one another



During the project life cycle, project risk reviews and reports are required as previously identified in therisk management plan. Two months after the project started, the following events have taken place:



1. The top-two (2) threats have occurred.


2. The top opportunity has been realized.


3. The project’s risk budget is already exhausted.


4. The risk management schedule has been shortened by two (2) months.

www.homeworkfortune.com


Write a five to seven (5-7) pages spaper in which you:

1. Analyze the impact of those events on the project.
2. Determine if any mitigation activities are required and explain why.
3. Determine if budget / schedule changes are necessary and explain why.
4. Update the risk register and highlight the changes made. Provide the justification for the changes.
5. Use at least four (4) quality resources in this assignment.

Note: Wikipedia and similar Websites do not qualify as quality resources.



Your assignment must follow these formatting requirements:

* Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
* Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.


The specific course learning outcomes associated with this assignment are:


· Given an information requirement related to project risk management, determine the nature and extent of information needed to effectively address the topic; efficiently locate, determine the validity, and critically evaluate the resources; and apply the information to accomplish the specific purpose (report, case analysis, factual requirement, problem solving, and planning).


· Use technology and information resources to research issues in project risk management.


· Write clearly and concisely about project risk management using proper writing mechanics.