• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back
BUS 519 Assignment 3 - Risk Workshop and Risk Register
BUS 519 Assignment 3 - Risk Workshop and Risk Register

Write an eight to ten (8-10) pages paper Risk Workshop and Risk Register Component paper in which you:

1. Identify the required pre-workshop activities.
2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.
BUS 519 Assignment 3 - Risk Workshop and Risk Register
3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat.
4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment.
5. Document the top three (3) opportunities
BUS 519 Assignment 3 - Risk Workshop and Risk Register
6. Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment.
7. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:
• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
• Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.