Study your flashcards anywhere!

Download the official Cram app for free >

  • Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

How to study your flashcards.

Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key

Up/Down arrow keys: Flip the card between the front and back.down keyup key

H key: Show hint (3rd side).h key

A key: Read text to speech.a key

image

Play button

image

Play button

image

Progress

1/3

Click to flip

3 Cards in this Set

  • Front
  • Back

https://www.homeworkcapital.com/shop/bus-519-assignment-3-risk-work-shop-and-risk-register-flayton-electronics-case/

BUS 519 Assignment 3: Risk Work shop and Risk Register (Flayton Electronics Case)$35.00Write an eight to ten (8-10) pages paper Risk Workshop and Risk Register Component paper in which you:Identify the required pre-workshop activities.Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.

www.homeworkcapital.com

Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat.Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment.Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity.Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment.Use at least two (2) quality resources in this assignment.

www.homeworkcapital.com

Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements:Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.