• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/32

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

32 Cards in this Set

  • Front
  • Back

"2ES"

from ES Lt = 272. @ 190mm


8ES

from ES LT = 312° on restricted line

10ES

from ES Lt = 312° @ 54"


6 ES LIGHT

from ES Lt = 243° @ 19.5"

4ES

from ES Lt = 223° @ 16"

"12 ES"

from ES LT = 295° @ 1.1nm

Berth 3

#3 on long line at 42"


#7 bearing 240° from #3 @ 0.2nm


#6 just left of due north from #7 @0.2nm


#6>#5>#4 = 4.5"


#7>#1>#2 = 4.5"

Berth 4

#3 = On long line @ 15"


#7 bears 240° from #3 @ 11"


#6 is due N of #7@13"


#5 bears 097° from #6 @4.5"


#1 bears 083° from #7 @4.5"


#4 on long line @ 19" ( just right)


#2 on long line @12" (CH right)



Tug mooring

-"A" is 9" due south of #2



-Next 2 are 5"E and then 3"↕️



-BUOY "A" is 5" due W of mooring "A"

Odd mooring bouys

-Outside mooring buoy is due W of "A" and 4.5" E of long line



-2ES mooring buoy is due E of 3/3 and 3" E of "2ES" Buoy

Stacks / Tanks (berth)

-#1 stack bears 053° @ .2nm from shrink sink tip


-#2 just E of S @ 3.5" from #1


-#3 stack bears 288°@.2nm > ES PT


-#1 Tank bears 146° @ 10" >stack#3


-#2 Tank just E of S @3.5" from #1

Safety Zone

- West line runs through "2ES#


- East line is 8" East of long line


- Bottom line extends 077° to land


- Top line extends to 2" N of little dink


Obstruction lines (berth area)

- Obstruction line #1 (39ft) = runs parallel to sewer line#3 and 10" N, ends 6" E of long line



- Double Obstr. line#1(cover 10ft) = starts 2" N of shrink dink tip, ends just E of "8ES"




- Obstruction line #2 (13ft) = starts 10" S of double Obstruction line #1, perpendicular to land , 6.5"



- Double Obstr. Line#2 (cover 15ft) = starts 2" S of ES Pt and parallel, ends in long line




- Double Obstr. line #3 (cover 15ft) = starts 3" S. Of #2 + parallel, ends 1" E if long line

Stacks (King Harbor)

-#1= 6" E of hbr, CH above lat line



-#4 = 2.5" E, then 1.5# S

Sewer lines

#1 - 2" N of little dink


to 33°55'39.5"N x 118°29'W



#2 - 12" S of little dink


To 33°55'03.5"N x 118°29'W



#3 - connect "10es and 12es" stop 2"E

Obstructions (Berth)

69' = 2"W of "es2" and 4" N of 33°55'N



60' = 312° @ 18" from 33°55'x118°27'

Restricted line (berth)

Lon 118°28'04"W to


Lat 33°54'44"N x 118°29'

Disposal Area

-Top rt corner is 5" S of big dick and 5" off coast



- parallel to coast 25" x 8"


-(depths from survey of 2013)


LAX AERO

33°56'33" x 118°24'53"

Big restricted line

Big Dick to 33°56'23" N x 118°29' W

Anchorages

- 0.3nm radius



-#2 = 33°53'18" x 118°29"



-#1 = from #2 bears 340° @ 58"



- depth #1= 156 + 162


- depth #2 = 186 + 182

Pilot Boarding Area

- 33°52'18" x 118°30' ~ 0.5nm radius


- depth = 187 + 204

Cable #1

- straight line


- 33°53'42" on coast


to 118°30'42" on bottom of chart

Cable #2

- 2 almost straight lines


- 33°53'36" to 33°52'48"x118°29'


- threads the needle


- then to 33°53'07" on west edge

Cable #3

- 33°52'12" to 33°50'42"x118°28'30"


- to up above 51' then end 51'

Cable #4

- 33°51'18"


- next lon line on 24"


- then next lon line back to 18"


- then mirror #3 average 15" barrier


Cable #5

- same start as #4


- go west to 118°25'30"


- then end at 118°28'27" on bottom

Spire

Just north of Manhattan pier


21" lat x 24" lon

120' contour

-Start west edge / 58'07"


-crosses sewer #1 on 118°29'


- then a dick on #2 shy of 118°29'


- bottoms out lon 24'36"


- loops back in from 17"to just miss "RB" then out again


60' contour

- enters top edge at 30'12"


- goes through fish haven coming out bottom right


- makes dick on #2 sewer (60' obst to 68' obst)


- inside moorings and down safety line


- then proceed to nick bottom left of 60' fish haven


- curve In to graze "RB 3"


- then down and out

30' contour

- enters top 29'06"


- parallel and around MDR b'water


- dick in sewer #3 to almost "es12"


- cont parallel, stay outside obstructions and piers


- end at "MDR3"


- BRIEFLY come back in and out

18 ' contour

About 6-8 seconds off,


- dick in sewer #3 to split buoys


- graze tips of piers