• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/154

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

154 Cards in this Set

  • Front
  • Back

(CONTROL SHIP) Romeo at the dip

Am steady on course and speed and am preparing to receive you on side indicated

(APPROACH SHIP) Romeo at the dip

Am steady to come alongside

(CONTROL SHIP) Romeo close up

Am ready for your approach

(APPROACH SHIP) Romeo close up

Am commencing approach

Romeo hauled down

When messenger is in hand

Prep at the dip

Expect to disengage in 15 minutes

Prep close up

Replenishing completed; am diengaging at final station

Prep hauled down

All lines clear

When fuel or explosives are being transferred, what flag is flown

Bravo

Bravo at the dip

Have temporarily stopped supplying

Bravo close up

Fuel or explosives are being transferred

Bravo hauled down

Delivery is complete

When the receiving ship has a complement if 50 personnel or less, what ship is responsible for furnishing and hand tending all phone lines?

Delivery

What class of ships are responsible for furnishing all shot lines?

CVN, LHA OR LHD

Optimal separation distances between delivery and receiving ship during intitial tensioning is?

140-180 ft

An accelerated standard breakaway using an orderly and pre-arranged procedure. The objective is to disengage quickly without damaging the rigs or endangering personnel

Emergency Breakaway

How many wire rope cutters are required at each STREAM solid cargo transfer station on an UNREP delivery ship?

Two

What is the allowable size of the easing-out line?

12-21 thread manila

Emergency Breakaway is indicated by at least how many blasts of the ship's whistle?

Five short blasts

Emergency Breakaway markers shall be displayed where they can be readily observed by receiving ships using what color letters and what color background?

Red letters and white background

What type of wire rope is used in fuel and cargo rigs?

Type I, general purpose, Class 3, construction 6, 6x37, IWRC, extra-improved plow steel, preformed, regular right-hand lay

The MK 87 Mod 1 line-throwing rifle adapter kit is used on what types of rifles?

M14, M16 and M16A1

During night unrep, what color chem light must be used to illuminate the shotline projectile?

Orange

The station-to-station phone line and the lead line messenger for the "P&D" line are attached to the messenger at a minimum distance of _____ from the smaller end?

200 feet

The spanwire or highline is stopped to the messenger at a minimum distance of ____ from the larger end.

350 feet

What forms the bitter end of the messenger?

5-inch soft eye splice

Whats the size of the markers on the P&D line?

8x10 inches

How large should the numerals be on the P&D markers?

5 inches high

What color is the numeral on a red or blue marker?

White

What color is the numeral on a green marker?

Yellow

What color is the numeral on a yellow marker?

Green

What color is the numeral on a white marker?

Blue


At night, what markers are indicated with 2 blue chem lights?

60,100,140 and 180

What is optimal unrep speed?

12-16 knots

How long is the lead line messenger? And what type of line is it?

200 feet


3/4 inch Nylon

What size pelican hook is utilized when using either the Robb coupling or NATO coupling?


What size is the cotter pin used to secure it?

1-inch fueling-at-sea, lightweight pelican hook


Steel 3/16x3 inch

What size pelican hook is used to secure the highline to the long link on the receiving station's fixed padeye, sliding padeye or pendant? Shall be used with the STREAM rig.



What size is the cotter pin used to secure it?

1-3/8 inch pelican hook


Steel 1/4x3 inch

How far should you spread a cotter pin to properly secure it?

About 3/8 inch

What circuit is utilized for communications during unrep?

70MC

What does this transfer station marker indicate?

F76 and F44

International Orange

Missles

Green

Ammunition

Red

Fuel Oil

Blue

Diesel Oil

Red and Blue Triangles

F76

Yellow and Blue Triangles

F44

Black, Yellow Quarters

Lube Oil

White

Feedwater

White with Blue Letter "P" Centered

Potable Water

Green with White Vertical Stripes

Stores

Green with White Letter "P" Centered

Personnel and/or Light Freight

Red/Yellow & Blue Triangles

Fuel Oil and F44

Green with White Letter "B" Centered

Bridge-to-Bridge Phone/ Distance Line

How big are the transfer station markers?

3ft x 3ft

Whats the specifications of the bulb used to illuminate the night light box?


How many bulbs are utilized?

25-watt shielded bulb


2, one is stand-by

What size paddles are utilized for hand signals?

12x12 inch or 12 inch diameter

What color and size of stripe runs diagonally from upper left to bottom right corners of the green signal paddle?

1-inch wide, white stripe

Ships engaged in alongside replenishment shall display the required day shapes during daylight hours from a vantage point that can be seen for a distance of at least how many miles?

Two

Deck edge corners, elevator corners, torpedoes and gun mounts should be marked with what color chem light and how many?

One red chem light

Vertical stanchions, boom guys,preventer wires, elevator cables, and other obstructions that form the limits if open area available for working at the receiving station should be marked with what color chem light and how many?

3 red chem lights, 6 inches apart in a vertical line

The deck edge or highest obstruction outboard at the receiving station should be marked with what color chem lights and how many?

6 red chem lights secured to a 6" x 12' long white strip of canvas OR a 12ft piece of 21-thread manila or 1-1/2 inch nylon line spaced 24" apart with the first and last lights 12" away from the ends.

How many chem lights should be secured to the hose saddles of the fuel rig and where?

3 blue chem lights secured in line, on the side or end of the saddle facing the delivery ship

How many chem lights should be secured to the hose spanwire free trolleys and where?

1 blue chem light on each side of the trolley

How many chem lights should be secured to the No.1 (retrieving) saddle whip and where?

1 blue affixed to a ring or shackle, which a 3/4 " safety anchor shackle between it and the retriever attachment

How many chem lights should be secured to a coupling or hose end?

3 blue chem lights on each Robb coupling, around the hose and just behind the hose adapter

Where should the blue chem light be attached on the messenger?

One at the point of attachment to the shotline and adjacent to the identification tag

Where should the blue chem light be attached to the station-to-station phone line messenger, return line messenger and P&D line messenger?

Adjacent to the identification tag

How many and Where should the chem lights be placed on a trolley for personnel/ cargo transfer?


When transferring a litter?

4 blue chem lights on each side in a horizontal line.


Green chem lights on the floatation cover

How many chem lights go on the end of the highline?

1 blue chem light on each side of the end fitting

Where should the chem lights be on the cargo hook tag line?

One blue chem light at the lower end

Where should the chem light be on the transfer dolly, missle canister or container?

One blue chem light on each lower corner

Where should the chem lights be placed on the personnel transfer chair?

One blue chem light on each corner, top and bottom

Receiving stations shall rig 3 lights tied together at each forward and aft side of, and on a horizontal line with, the attachment point for:

1) highline pelican hook


2) fuel spanwire pelican hook


3) outhaul/ messenger block padeye or link

Low-level yellow floodlights shall be a minimum of ____ watts

150

This is a fitting designed to fail at a predetermined load to prevent deformation of the supporting structure or damage to the rig

Weak link

This is a device built into a wire rope winch drum designed to slip at a preset load

Slip clutch

When the static-tested load for the attachment point is less than the breaking stength of the transfer rig to be used, a ____ or _____ shall be employed

Weak link or slip clutch

What does STREAM stand for?

Standard Tension Replenishment Alongside Method

The static tested load of the spanwire attachment point

36,000 lbs

The static tested load of the messenger padeye

9,000 lbs

The static tested load of the riding line padeye/ cleat

15,000 lbs

The static tested load of the jigger tackle padeye

12,000 lbs

The static tested load of the jigger tackle cleat

3,000 lbs

The static tested load of the easing-out line padeye, staple, and cleat

2,700 lbs

The static tested load of the probe stowage tie-down padeye, staple and cleat

600 lbs

Whats the minimum length in feet of the spanwire?

900 feet

Whats the minimum length in feet of the saddle whip

450 feet

The messenger return line is a minimum of ____ feet made with ____inch nylon and is fitted on one end with a ____ inch soft eye with a brummel hook.

300 feet


2-1/4 inch


3-inch

The remating line is required on what type of receiving station

Double probe

The remating line shall be a minimum of ___ feet long made of ___ inch nylon line

60 feet


3-inch

For single probe rigs, the _____ section of the messenger serves as the remating line

60 foot

The easing out line is made up of what type of line?

12-21 thread manila with whipped ends

This strap assembly is a 1-1/8-inch nylon line with steel safety snap hooks at each end

Long and short strap

How long is the short strap and what is it used for?

18-inch


Used on double probe rig when disconnecting the messenger and hooking up the remating line

How long is the long strap and what is it used for?

42-inches


Used if the messenger has twists around the spanwire

What type of line is the only authorized line for riding lines

Manila

A riding line is required for the _____ coupling when the probe receiver is not available

NATO

The standard riding line is ____ inch manila line, ____ to ____ feet long. A thimble eye splice with a ____ inch pear-shaped link is inserted in one end of the riding line.

4-inch


25-45 feet


3/4 inch

The two-fold purchase consists of two ___ inch wood or metal blocks with ____ inch manila line

7 or 8 inch


2-1/2 inch

What is the length of the standard hose used in fuel STREAM rigs

35 feet

How long is the Type A Flow-Through hose saddle and where is it used

19 inches


Used in the single hose rig and for the lower hose in the double hose rig

How long is the Type B Flow-Through hose saddle and where is it used

32 inches


Used for the upper hose in a double hose rig

On a hose coupling, which end incorporates a rubber O-ring for sealing the joint

Female end

Study this!

How many pounds is required to seat the probe

300 lbs

How many pounds is required to unseat the probe

2500 lbs + or - 500 lbs

The receiver hose assembly is a steel-reinforced, ____inch diameter hose with a male hose coupling and adapter to ___inch flange connector at one end and a female hose coupling at the other end. It is ___ feet long and connects the receiver to the fuel riser

7 inch


8 inch


8 feet

Study!!!

Study!!!

When the probe is properly seated, the indicator flags will raise to approximately how many degrees above the horizontal?

30°

Study!!!

Due to contamination, do not leave a potable water hose on an UNREP rig longer than ___ or leave water in the potable water hose

One Day

New potable water hoses should be painted what color on the end of the coupling, caps, and plugs?

Dark Blue

The potable water hose should be labeled "Potable Water Only" every ____ feet.

10

New potable water hoses and fittings should be soaked for at 2 min in a solution containing at least ____PPM of ____

100 ppm of free available chlorine (FAC)

How many pounds is required to disconnect the 2-1/2 inch hose rig?

500

The 2.5 inch hose rig is designed with a pumping rate of ____gallons per hour

15,000

How can you tell the difference between a male or female end of the two and a half inch hose?

The female end incorporate a rubber o-ring seal

Study

Study

What does SURF stand for?

Standard underway replenishment fixture

What type of ships station configuration utilizes the Highline and hauling Lines with standard underway replenishment fixture (SURF) and trolley with Gullwing strong back?

Sliding Padeye Station

What type of ships station configuration utilizes the Highline and hauling lines with surf and trolley with cargo drop reel?

Fixed Padeye Station

What type of ship station configuration utilizes the Highline and hauling Line with surf and star attachment and trolley with cargo drop reel?

Fixed Padeye without Access for 2 riggers

What ship station configuration utilizes the Highline with star attachment and hauling Line with surf and trolley with cargo drop reel?

Pendant Station or Stream Support Leg

What is the diameter of the stream highline?

1 inch

The stream highline is tensioned to how many pounds?

19,500 lbs

How often are stream highlines replaced?

Every 24 months

What is the maximum designed cargo stream load capacity? With max sea state and ship separation?

Max load- 5,700 lbs


Sea state- 5


Ship separation- 200 ft

Loads weighing over 5,700 lbs is called a ___ ____

Jury rig

Jury rigs can only be used in calm seas (sea state? ) and the ship's must hold close separation (feet? )

0-3 sea state


100-120 feet of separation

What is the diameter and length of the highline?

1 inch and 800 feet

What is the length and diameter of the inhaul?

1/2 or 3/4 inch


800 feet

What is the length and diameter of the outhaul?

1/2 inch


1,200 feet

For every ___ psi of air from the ram tensioner, there is about ___ lbs of tension in the highline.

100 psi 》1,000 lbs

The major reason for tension control in the hauling winches is to prevent a ___ condition causes by ship movement during transfer.

Tightline

The CDR has a max load capacity of how many pounds?

5,700

How many pounds of pull is required to release the break on the CDR?

50 lbs

The sliding padeye is statically tested to how many pounds?

50,000 lbs

A minimum of how many personnel should be assigned to hand tend the inhaul and outhaul lines for personnel transfer?

10

A minimum of how many personnel should be assigned to hand tend the highline for personnel transfer?

25

How long is the wire preventer used on the trolley block for personnel transfer?

2 feet long, and 1/2 inch diameter

How long is the tag line on the stokes litter?

12 feet of 2-1/4 nylon

The maximum safe load for transfer by synthetic highline is how many pounds?

600 lbs

What are the dimensions of the synthetic highline and what type of line is it made of?

4-inch doube braid at least 350 feet in length.

What are the dimensions of the synthetic inhaul and what line is it made of?

3-inch, plaited. At least 350 feet in length.

What color are the MK-85 slings and used for what size loads?

Red- for loads 13-31 inches high

What color are the MK-86 slings and what size loads are they used for?

Black- for loads 29-40 inches

What is the color of the MK 87 slings and what size load are they used for?

Green- for loads 36-50 inches

What color are the MK 100 slings and what size loads are they used for?

Yellow- for loads 48-70 inches high

A relative wind of ___to___ knots is ideal for vertrep

15-30 knots

A relative wind bearing of ___to___ degrees is optimum fot vertrep

330-030 degrees

For night vertrep the receiving ship should be abeam at a distance of ___to___ yards

300-500 yards

For vertrep during day and night what is the number of hours considered to be the effective limit of pilot endurance?

6-8 during day


2-3 at night