• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/45

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

45 Cards in this Set

  • Front
  • Back

When would the BAT DISCHARGE light illuminate?

With the battery switch ON, indicates excessive battery discharge

On the ground what is meant when the TR UNIT light is illuminated?

Any TR unit has failed

In flight what is meant when the TR UNIT light is illuminated?

TR1 failed


OR


TR2 and TR3 failed



**Verify it on the Electrical panel

Can the ELEC light illuminate in flight?

No, only on the ground

What does the ELEC light illuminated indicate?

A fault exists in the DC OR standby system

Does the IFE/PASS SEAT switch work?

No, placarded inoperative

When does the IDG automatically disconnect?

High IDG oil temperature

Can the IDG be reconnected in flight?

No, on the ground, engine not running

Does the APU have an IDG?

No, it has it own generator

When connecting one source of power to a transfer bus what happens to the previous source?

The previous source automatically disconnects

Where is the Ground Service switch?

Forward Flight Attendants panel

How many IDG's are there?

2

What AC busses do the Transfer busses power?

2 Galley busses, Main bus and Ground Service bus



AC Transfer bus 1 also supplies power to AC Standby bus



Also power TRU's

What does BTB stand for and what do they do?

Bus Tie Breakers



If a power source supplying the Transfer bus fails the BTBs will allow the opposite transfer bus to be powered off that power source

What is the automatic generator online feature?

If the airplane takes off with the APU powering both transfer busses and the APU is either shutdown or fails the Engine generators are automatically connected to their related transfer bus.



This can only occur once per flight

For single generator operation what is load shed and on what transfer bus does this occur first?

Galley and Main bus on AC Transfer bus 2 are shed first followed by Galley and Main busses on Transfer bus 1 if more shedding is required.

Is load shedding automatic?

Yes

Once dual generators are supplying power to their individual transfer busses after load shedding does the load restoration occur automatically?

Yes

In flight if the APU is the only source of electric power what gets load shed?

All galley and main busses

When does the DRIVE light illuminate?

Engine shutdown


HOT (High IDG Oil Temp)


Engine shutdownHOT (High IDG Oil Temp)IDG FaultIDG manually disconnected


IDG Fault


IDG manually disconnected

A single battery can provide standby power for how long?

30 minutes

Dual batteries can provide standby power for how long?

60 minutes

How many TR Units are there and how are they powered?

3


Powered by the AC Transfer busses

What is the difference between a Hot battery bus and a battery bus?

Hot Battery bus items are directly linked to the battery and can drain it without the battery switch being turned ON.



A battery bus relies on the battery switch being ON to receive DC power. The same is true with the switched hot battery bus in the 737

With the BUS TRANSFER switch in AUTO what happens during a FD or A/P ILS approach at glideslope capture?

The cross tie repay opens which causes the DC system to isolate to prevent a single failure from affecting both sides of the DC power system and therefore both sides of the AP/FD Nav equipment

Single and Dual batteries voltage?

22-30 volts

With a loss of all Engine and APU electrical power what is the standby source and what busses are powered?

The battery is the Standby Power source. It powers;


DC standby bus


AC Standby bus using a static inverter


Battery Bus


Hot Battery Bus


Switched hot Battery bus

Once the battery charger has finished charging the batteries does it do anything else?

It reverts to TR mode and powers the Hot Battery bus and the switched hot battery bus

What does the static inverter do?

Converts DC from the battery to AC power during loss of normal electrical power to power the AC standby bus

On standby power what displays will be working?

Captain side DU, upper DU, Captain CDU



Captain nav radios (Nav, ADF)


RMI


Clock


Left IRS


Crossfeed valve

How are emergency exit lights powered?

A seperate battery which last 20 minutes. They charge when the switch is in the OFF position

What does the APU GEN OFF BUS light indicate?

The APU is running and not powering any AC transfer bus

What does the GEN OFF BUS light indicate?

IDG is not supplying power to the related transfer bus (breaker is open)

What does the SOURCE OFF light indicate?

No source has been MANUALLY selected to power the related transfer bus OR


The manually selected source has been disconnected

How are the IDG's cooled?

Engine fan air and fuel flow

When the GROUND POWER AVAILABLE light is illuminated what does that mean?

Ground power is connected and meets the power quality standards

Using external power can the Ground Service busses be powered without applying power to the whole system?

Yes, the forward flight attendant panel switch GROUND SERVICE can be pushed to directly apply power to ground service busses without powering the system using external power

When will the GEN OFF BUS light extinguish after the IDG is running?

When the GEN switch is turned on to power the associated AC TRANSFER bus

When will the TRANSFER BUS OFF light illuminate?

When the associated AC Transfer Bus is not being powered

When will the STANDBY PWR OFF light illuminate?

When there is no power supplied to the ONE OR MORE of the following busses;


DC Standby Bus


AC Standby Bus


Battery Bus

What are some systems the CAB/UTIL switch provide power to?

Galley busses


Logo lights

What does the DC bus tie relay do on a A/P or F/D ILS approach?

Opens to allow each AP to be powered by its own source (DC bus 1 and 2)

What does moving the standby power switch to BAT do?

Forces battery power to operate the Standby buses;


AC standby


DC Standby

What is IDG power output?

Three phase, 115 volt, 400hz AC

What is the DC System voltage?

28 volt