• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back

The diameter of the tamping rod used in this test method is

5/8'' +- 1/16'' (2mm)

What is required shape of the tamping end of the rod?

rounded / hemispherical

What is the required minimum frequency of the vibrator used in this test method?

7000

The outside diameter or side dimension of the vibrating element shall be at least _____ but not greater than ____

.75'' and 1.5''

A plastic container can be used for the measure in this method. T or F

True

What is the minimum thickness of a metal strike-off plate?

1/4''

What is the minimum thickness for a glass or acrylic strike off plate?

1/2/''

What is the specified weight of the mallet used on measures that are 0.5ft^3 [14L] or smaller?

1.25 +- .5lb

Measures other than air meter bowls used for this test must conform to ASTM

C29

Air meter bowls used for this test must conform to ASTM _____ and be calibrated for volume according to ASTM _____

C231 and C29

The concrete sample must be obtained in accordance with what ASTM method?

C-172

What method of consolidating must be used when the slump is greater than 3 inches? (75mm)

Rodding

What method of consolidating must be used when the slump is less than 1 inch (25mm)

Vibration

if rodding is the method of consolidating used, the measure must be filled in how many layers?

3

For a measure of 0.5ft^3 [14L] what is the required number of strokes of the tamping rod for consolidating of each layer?

25

When rodding the middle and top layers, the tamping rod should penetrate into the layer below approximately

1''

If vibration is the method of consolidating, the measure must be filled in _____ approximately equal layers

2

If, after consolidating of the final layer, the concrete level is 1/2 inch (13mm) above the top measure what should be done?

Remove excess with scoop

After consolidating of the final layer, an excess of concrete ______ above the top of the measure is considered optimum

1/8''

After completing the strike off procedure what must be done before weighing the measure and sample?

clean measure of any excess material