• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/114

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

114 Cards in this Set

  • Front
  • Back

Respond to any inspection results that require corrective action

Owner

Determine 510 exempted vessels to be included in the inspection program

Owner

Overall responsibility for complying with 510

Owner

Responsible to develop a QA inspection/repair management system

Owner

Take an annual jaeger j-1 eye test

Inspector

Responsible to develop an effective MOC process

Owner

Responsible to develop program for IOW’s

Owner

During repairs and alterations- responsible for quality control

Repair organization

Assure owner- testing, inspection, repairs, and exams meet code

Inspector

Directly involved in visual activities

Inspector

Evaluate and accept NDE examination results

Inspector

Make recommendations for repairs, replacements, or fitness for continued use perform

Inspector

Perform NDE in accordance with specs

Tech

Determine qualification requirements for personal performing NDE maintain

Owner

Maintain examiners certification records

Tech employer

Notify inspector or engineers of vessel integrity issues

All others

Establish a tracking system for inspection audit findings

Owner

Develop the inspection plan for vessels and relief devices

Inspector and/or engineer

Choose to conduct RBI assessment

Owner

Review prior vessel history prior to inspection

Inspector

Familiar with characteristics & causes of potential damage mechanisms

Inspector

Approve deviations from inspection plan

Inspector or engineer

Perform internal inspection

Inspector

Assist inspector with internal inspections

Qualified other

Determine whether it’s necessary to remove deposits or linings

Inspector and corrosion specialist

Perform on-stream inspection

Inspector or tech

Approve on stream inspection work performed by examiners

Inspector

Specify training requirements for non AI’s who perform external inspection accept

Owner

Accepts non inspectors to perform externals

Inspector

Notify inspector of any vessel deterioration found

All others

Perform external inspection

Inspector or qualified other

Take thickness measurements

Inspector or tech

Review corrosion data for possible anomalies

Inspector

Review corrosion data if short term corrosion rate varies significantly

Inspector and corrosion specialist

Assure those taking thickness measurements are trained and qualified

Owner

Be aware of CUI suspect areas and the CUI is unpredictable

Inspector

Be aware the CUI can be localized and doing Uts during internals me be unsuccessful

Inspector

Determine locations of cmls for vessels with localized corrosion

Corrosion specialist

Involved in the number of cmls will be significantly reduced or eliminated

Corrosion specialist

Determine type of expected damage and select NDE method

Inspector and corrosion specialist or engineer

Specify industry qualified UT angle beam examiners when needed

Owner

During NDE- be aware of sources of measurement inaccuracies

Inspector and tech

Review use of a component pressure test in lieu of complete vessel hydro

Engineer

Determine pressure for tightness test

Owner

Hydro of 300 SS, verify water quality and that vessel is drained and dried

Inspector

Review potential risks of a pneumatic pressure test

Engineer

Develop pneumatic pressure test procedures

Engineer

Approve substituting NDE for a pressure test after alteration of major repairs

Inspector and engineer

Determine if a pressure test is needed after a non-major repair “believes”

Inspector

Verify new materials for repairs and alterations comply with those specified

Inspector

Determine external inspection requirements for retired but in place equipment

Owner

Determine the internal/on stream inspection interval

Inspector or engineer

Approve the use of on-stream inspection in lieu of internal

Inspector

Maintain a fully documented QA process

PRD repair organization

Maintain a fully documented training program

PRD repair organization

Determine the relief device interval

Inspector or engineer or qualified other

Approve simplified interval deferral

Inspector and owner

Approve other interval deferral

Inspector and owner

Approve deferral of inspection repair recommendations

Inspector and inspection supervisor

Change or delete inspection recommendations

Engineer or inspection supervisor

PMI new materials during repairs and alterations

Inspector or tech

Select which corrosion rate reflects the current conditions

Inspector and corrosion specialist

Estimate corrosion rate for new vessel or vessel with change in service

Corrosion specialist

Approve thickness measuring procedure for readings for MAWP calc

Inspector

Use sect VIII div 2 evaluation for pitting of LTA’s

Engineer

When verifying new materials, determine the sampling percentage

Inspector or owner

Wrong material found in existing vessel, select amount of additional PMI to do

Inspector

Assess preferential corrosion in welds

Inspector

Assess crack like flaws and environment cracking

Engineer or corrosion specialist

Inspect new vessels at time of installation

Inspector

Vessel owner and location change- check adequate documentation is provided

Inspector

Determine the external inspection interval

Inspector or engineer

Every 10 years review and approve RPI assessments with interval beyond 10 years

Inspector and engineer

Consider increasing vessel required thickness for high consequence services

Engineer

Major repairs- temp repairs and alterations- approve methods, Materials, WPS, NDE, testing

Inspector and engineer

Approve all inspection and repair work at hold points

Inspector

Approve all repair and alteration work at completion of work

Inspector

Approve all nozzle installation

Engineer

During repairs and alterations decide if PMI is needed for questionable material documents

Inspector

Must be satisfied that temporary repairs is adequate for vessel continued service

Inspector and engineer

Allow temporary welded repairs to remain in place past “next opportunity”

Inspector and engineer

Determine a crack will not propagate from under a fillet weld patch

Engineer

Approve the use of fillet weld patch repairs

Inspector and engineer

Approve design and documentation of fill encirclement lap band repair

Inspector and engineer

Maintain vessel and relief device records

Owner

Determine a crack will not propagate from under a full encirclement lap patch

Engineer

Authorize the repair welding of cracks at stress concentrations

Engineer

Insert plate repairs-approve use of NDE procedure as alternate to RT

Inspector

Review weld spacing when installing insert plates (distance to existing welds)

Engineer

Review and approve the repair procedures for SS cladding

Inspector and engineer

Have access to operating and maintenance records that affect vessel integrity

Inspector

Prepare equipment repair plans

Inspector or engineer

Authorities all equipment repairs (excluding sect 8 div2)

Inspector

Authorities all repairs to division 2 vessels

Inspector and engineer

Authorities all alterations

Inspector and engineer

During repairs and alterations designate hold points

Inspector

Provide general authorization of limited of routine repairs

Inspector

Repairs- approve all methods of design, materials, WPS, NDE, and testing

Inspector or engineer

For repair plan of welding SS clad or alloy consider atomic hydrogen mitigation

Engineer

Review the use of controlled deposit welding in lieu of PWHT

Engineer

Verify that PWHT alternatives used are in compliance with spec and code

Inspector

Set NDE acceptance standards after welding is complete

Inspector or construction code

Approve use of alternate NDE methods after repairs and alterations

Inspector and engineer

Perform calculations for rerate

Engineer or manufacturer

Vessel re-rate must be acceptable to

Engineer

Monitor the repairs made to SS cladding or SS overlay

Inspector

Use welders and WPS’s qualified to sect IX or specified construction code

Repair organization

Verify that welding is done within the welders range and WPS range

Inspector

Maintain record of qualified WPS and WPQ

Repair organization

Welding records available to whom prior to welding

Inspector

Approve exceptions to pre heat temperature

Engineer

Monitor preheat temperature

Inspector

Develop procedure for local PWHT in lieu of a full encirclement PWHT

Engineer

Review the use or preheat in lieu of PWHT

Engineer