• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/72

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

72 Cards in this Set

  • Front
  • Back

Inputting accurate data into IMDS is important because

It is used by many different agencies and levels of leadership to make large scale decisions

What is the purpose of AFTO form 349 maintenance data collection record

Manually record data when IMDS is not available

The maintenance events screen in IMDS allows the user to

Create schedule defer reschedule or cancel events

What purpose does the HDD subsystem in IMDS SERVE

Allows the user to document inquire and retrieve maintenance action records

In the operational events IMDS subsystem what phase is the period of time from start to stop of an operational event

Phase 2 mission accomplishment

What duty does the material control section perform in IMDS ensuring accountability of all ordered parts and aiding in managing resources

Issuing and recovering

Which type of engineering assistance provides a one time waiver to use a specific part or product or deviate from a TO

Technical

Who validates the need for a technical assistance request after QA has validated it

20 AF

If a problem cannot be resolved with a TAR what is the next course of action

Maintenance assistance request MAR

What TAR has an impact on mission requirements and will have an approved solution in 45 days

Routine

Regarding material management the purpose of AF compiling and analyzing maintenance data is to determine

The most reliable and economical way to source needed items

What is an advantage of a shop maintaining its own benchstock

Items are available as needed and it is not required to contact material management prior to use

When managing a benchstock what is the purpose of ensuring that items that are no longer needed are deleted

Continuing to buy these items is wasteful because the unit pays for them upfront

What action will you take if an IPB is missing a NSN that it should contain

Submit an ETAR

What action will you take if the item you are attempting to obtain through the supply system is not available

Submit an order for the next highest assembly because it will contain the item you require

What action will you take to locate the source maintenance and recoverability SMR code in IPB 21M-LGM30F-4-2

Reference the far right column in any table of chapter 2 maintenance parts list

Where can an urgency justification code be found

AFH 23-123 volume 2 part 1 ILS-S material management ops

Which scenario will prevent you from ordering an item as mission capable

The next higher assembly that the part belongs to is available on base

What organization provides training and oversight for OTL

576 FLTS

SELM evaluates selected ICBMs from day to day operation all the way up to

First stage ignition

An established SELM squadron is composed of

2 LCCs and 6 LFs

An example of a cat 1 SEL objective would be

Verifying the LCC has the capability to process the required launch commands

Who must assess each LF tested during an Olympic play test to determine how each one is scored

Tech engineering

What is the purpose of the ICBM HSEP test

Evaluate the electrical hardness of a MAF or LF

What is the purpose of the SELM test order

Directs a test and outlines specific objectives

Which test verifies most functions that would prevent a launch prior to SELM test posturing

Alert readiness

Which task would be performed during SELM posturing

Removing the RS if ordnance will be activated

Once all SELM posturing tasks are complete QA personnel must again verify proper configuration prior to

MGS start up

During SELM posturing the launch tube opening and the interconnection box on the test LF are sealed after

The last look inspection have been conducted

The purpose of PRP is to ensure that

Only the most qualified individuals are allowed to perform nuclear related duties

The criteria for TPC team states that

A minimum of two authorized technicians must be present when working on a nuclear weapon system

The MNCL contains a list of every

Piece of NCE hardware and software

What time period began when the USSR placed the satellite sputnik into orbit

Space age

What location describes areas in space where objects can remain in an orbit with little or no fuel expenditure

Lagrange points

The Atlas V launch vehicle consists of what three major assemblies

CCB centaur upper stage and PLF

How does the Atlas V CCB provide thrust

Liquid oxidizer and fuel are mixed in the rocket motor and ignited

The purpose of the spring loaded jettison actuators in the Atlas V payload fairing is to

Force the two halves of the PLF to separate

The purpose of the delta IV launch vehicle solid rocket motor is to provide

Additional thrust needed for launch vehicle lift off

The purpose of mounting antennas on opposite sides of the delta IV launch vehicles delta cryogenic second stage is to

Provide adequate coverage in order to ensure that flight termination commands are received

What is a spacecrafts structure designed to provide

Strong stable platform for payload instruments and subsystems

Which power option is an integral part of a solar power system that can store extra power generated by the solar cells while in sunlight and then releases power in darkness

Secondary source

Which thermal control system technique uses the principles of conduction reflection and radiation to maintain proper temperatures

Passive

Why are liquid propellant systems used in the majority of spacecraft

They allow precise control and can be stopped and started indefinitely until the propellant runs out

Controlling a satellites attitude is required to ensure

Instruments are pointing in the correct direction

The Atlas V CCB and centaur upper stage go to the Atlas spaceflight operations center after delivery to

Be inspected for damage that may have occured during shipment

Why does the spacecraft for an Atlas V launch vehicle process through the spacecraft processing facility

For testing and to be encapsulated in the the payload fairing

Why are delta IV launch vehicle components transported using the ocean going vessel Mariner

The components are too large to transported using roads

What is a key difference between the MST at Vandenberg and Cape Canaveral

At Cape Canaveral the MST is a single structure at VAFB the MST splits into two halves

The purpose of space lift is to provide the US with the

Ability to project power by transporting personnel and material through space

What is one of the space lift operations group commanders duties

Assign mission assurance technicians

What does a mission assurance technician observe

Adherence to technical procedures as well as proper use of tools and equipment

What is mandated for all day of launch crew members

They must be specifically appointed and trained

What does a launch weather officer observe to determine if weather conditions are suitable to launch

Warning services and forecasts

A hydraulic system selector valve functions by

Changing the route of the fluid dependent upon the required movement of the actuator

Why are pneumatic systems best suited for quick repetitive actions

Gasses are less viscous than fluids and less resistant to flow

Why does a pneumatic system require a gas to be pressurized above atmospheric pressure in order to perform work

Little potential energy is contained in gas at atmospheric pressure

What is the purpose of the hoist on the PT

Load unload and remove and install AVE

The purpose of the hydraulic system of the TE is to provide hydraulic

Power to the TE trailer

Which statement best describes the operation of the TE hydraulic pumps

The APU powers the main pump and the PTO powers the auxiliary pump

What is the purpose of the TE bogie assembly

Supports the aft portion of the semitrailer

What is the purpose of the TE ECU

Maintains the proper environment in the container

Pressure seals are used in the LC cavity to reduce effects of

Air blasts that may lift the LC

What is the purpose of the gas pressure seals on the LC

Reduce blast pressure effects

The purpose of the MSS at the LF is to

Provide a base and shock isolation for the missile

The purpose of the gross and preload adjustment screws located on the side of each articulating arm of the MSS is to

Adjust the tension of the elastomeric pads

What is one of the purposes of the missile skirt umbilical cable

Supply power for first and second stage booster electrical components

What is one of the purposes of the arming and fusing assembly of the MK12A RV

Prevents the fusing system from operating until it is authorized to do so

What is the purpose of the carbon phenolic material that covers the body of the MK12A RV

Protects internal components of the RV from heat and reduces radar cross section

What purpose does the MGS serve

Controls the missile during flight and in the launch tube

The purpose of the P Plug installed inside the MGS is to

Validate receipt of the correct launch command

What does the MGS provide while the missile is on the ground

Status and fault reporting to the LCC

What is the purpose of the PSRE

Provide impulse thrust for post boost maneuvering