• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

When performing preheat prior to pipe welding, the preheat zone must extend

B 3" beyond the start of the weld

When obtaining thickness measurements

C a CML on each type of pipe component should be measured

Flange bolts are unacceptable if the bolt threads to not extend

C inside the nut within 1 thread of the nut face