• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/40

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

40 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
Fill in the column of a CYCLE PMS Schedule.
Work Center
Components
Periodicity
Department Head Signature
What does CSMP Stand For?
Current
Ships
Maintenance
Plan
Fill the column of a weekly PMS schedule.
Work Center Code
Date of current week
MIP # minus the date code
Components
Periodicity
Outstanding Repairs
Maintenance responsibilities assigned by name
Which, When, Which, What, How often, Why, Who
What is the purpose of the OMMS NG program?
Operational Maintenance Management System (Next Generation) - purpose is to: Submit Maintenance Requests
________ is designed to provide a ready reference of planned maintenance requirement for WCS and will be retained in the work center near the weekly PMS schedule.
Work center PMS Manual
On a MRC what category are the following? (Hint)
1. Test Equipment
2. Materials
3. Parts
4. Tools
5. Miscellaneous
Testing Matt Prays To Misc
Classified MRC are printed on _____ stock with the _________ indicated at top and bottom of each page.
pink stock
classification
What is the purpose of the PMS data trend?
Records reading or other historical data over a continuing period of time
___ supercedes all previous planned or preventative maintenance system or program. Where difference between requirements and procedures of PMS and other technical publications ore systems exist ___ requirement will prevail.
PMS, PMS
What reporting procedures should be used when technical publications and PMS procedures are different?
PMS Feedback reporting procedure/Category B
________ function as PMS coordinating activities and are responsible for the accountability and distribution of PMS documentation.
FTSCLANT (Fleet Technical Support Center Atlantic)
/FTSCPAC (Pacific)
_______ acts as final review officer for maintenance reasonability shift between departments.
XO
____________ reviews annotation of maintenance action not fully accomplished during the quarter and close out QTR schedules.
Department Head
___ serves as the principal 3M system assistant to the XO.
3MC
____ reviews and approves weekly and quarterly schedules for and ensures training and maintenance is accomplished.
DIVO
At a minimum, how often should CSMP be reviewed by the DIVO?
twice a week
What is the purpose for equipment validation program?
To ensure that each workcenter is responsible to what equipment and the location of the equipment.
DIVO should check work candidates submitted by WCS for what?
Accuracy, Timeliness, Completeness
What information is found on a MRC? (7 items)(hint)
Date
MRC Code
Location
Ship System, subsystem, equipment
Rates
Man Hours
MR Description
D M L SSE, R, MH, MR-D
__ is the ship's 3M System Manager.
XO
____________ is responsible to the 3M Manager for the effective operation of the 3M System within the department.
Department Head
How is an Urgent Feedback Report submitted or transmitted?
FBR Wizard
The ____________ contains information relative to PMS requirements for specific equipment for which the command is responsible.
PMS Master File
What is the relationship between the MIP to the LOEP?
The LOEP contains a list of MIP's
_____________ maintenance is maintenance requirements that must be accomplished concurrently with another maintenance requirement. (Hint)
Mandatory Related
MUST be related.
The ____________ reflects that portion of the PMS Master File that contains only the planned maintenance requirements applicable to a particular work center.
Work Center PMS Manual
___ is used with a controlling MRC when the MRC applies to a number of identical items (i.e. motors, controllers, life rafts, valves, test equipment, small arms)
EGL
_______ are authorization for a record of change to an existing MIP or MRC, or the addition of a new MRC applicable SYSCOMS/BUMED, ISEA, will serve message pen change correcting errors in PMS documentation that affect the safety of personnel or can cause possible damage to equipment in the fleet.
PMS ACN (Advanced Change Notices permit rapid response to technical difficulties encountered in the fleet's use of a publication. Its incorporation into the publication is mandatory.)
Depot level maintenance is used for what reasons?
Get outside activity to conduct work that work center can't complete.
The COSAL tool that contains all current APL's AEL and offers a variety of access and retrieval capabilities which provides convenient and efficient means for obtaining data previousle available microfiche?
GDAPL - General Distribution Allowance Parts List
What color is a caution tag? (Hint)
Yellow
Yield sign
Out of calibration stickers are what color?
Orange
What must be posted in a work center when hazmat is stored there?
MSDS for each mat held (Material Safety Data Sheets)
Eye wash station
Authorization letter signed by CO
What is IEM status I?
Equipment that will remain onboard and will be inactive for 30 days or longer and is not scheduled for corrective, maintenance, or overhaul.
If a higher authority accomplished maintenance within your work center what mark do you use on your weekly board?
cent sign
What is the automated tag out program called?
Shift Operations Management System (SOMS) is a COTS product the Navy has selected to automate its tag-out process.
Shaded TIC marks are made on which schedule to indicate AT-SEA periods?
Cycle Boards & Quarterly Boards
On a MRC with a SYSCOM control number of B9 CRWW U, this code should be matched exactly and should be verified on?
It's MIP only
What is the OPNAVINT 5100.19D?
Occupational Safety and Health Manual
_________ contains the information necessary for equipment tag-out incidental to PMS accomplishment.
TGL / IGL
Tag Guide List / Isolation Guide List