Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
5 Cards in this Set
- Front
- Back
Discuss the concept of ORM |
1. Decision making tool 2. Increase operational effectiveness 3. Identifies and manages risk |
|
Of the five steps of ORM discuss Implementing controls |
1. Engineering-change design or material selection 2. Administrative-making warning signs, develop SOPs, etc. 3. Physical Control- PPE, Barriers, etc. |
|
Discuss the purpose of the tag out procedure. |
Provide for personnel and ship safety and prevent damage of equipment. Electrically and mechanically isolate systems/equipment to complete work safely Provides standard Tag-out procedures. |
|
Identify and explain the Two types of tag out procedures |
Caution and danger. Caution yellow- used to amplify instructions on how to operate equipment Danger Red- used to mechanically or electrically isolate a system to conduct corrective maintenance or preventative maintenance. |
|
What are the two types of danger red maintenance? |
Corrective- tags may be hung until no longer needed. Preventive maintenance- tags must be cleared within 24 hrs or eod. |