Also, the existing screen building TCMSD has is in a state of disrepair. Mr. Jones has talked to contractors about renovating the existing building. The results of those discussions was that not only that it would not be cost effective, but not possible to do. At the same time if they were to install a new vertical in our influent pump station which is what they are proposing it would eliminate the issue of the existing building as well as eliminate confined space safety issue. TCMSD has a manual bar screen in our pump station that has be manually cleaned fairly frequently, so the installation of the find screen in that location would reduce staff risk exposure and in addition to that it would provide an additional protection for the influent pumps and downstream equipment. Have had a number of failures due to clogging issues and things of that nature. Also included in the project is a new standby generator and automatic transfer switch and new controls for the influent pump station as well as some miscellaneous renovation and restoration measures that will be implemented to extend the useful life of the pump station. The total estimated cost of this project is
Also, the existing screen building TCMSD has is in a state of disrepair. Mr. Jones has talked to contractors about renovating the existing building. The results of those discussions was that not only that it would not be cost effective, but not possible to do. At the same time if they were to install a new vertical in our influent pump station which is what they are proposing it would eliminate the issue of the existing building as well as eliminate confined space safety issue. TCMSD has a manual bar screen in our pump station that has be manually cleaned fairly frequently, so the installation of the find screen in that location would reduce staff risk exposure and in addition to that it would provide an additional protection for the influent pumps and downstream equipment. Have had a number of failures due to clogging issues and things of that nature. Also included in the project is a new standby generator and automatic transfer switch and new controls for the influent pump station as well as some miscellaneous renovation and restoration measures that will be implemented to extend the useful life of the pump station. The total estimated cost of this project is