V. E-Permits

Great Essays
I. Summary
A. Why we exist
1. The Harris County Permit Office began issuing development permits in 1973.
2. Permits are issued in accordance with Harris County regulations to ensure that unincorporated areas of Harris County are able to qualify for flood insurance through the National Flood Insurance Program.
3. The residential department is diligently working to minimize the loss of life and property from high water events (i.e. Floods, Tropical Systems, and etc.)
4. The importance of flood plain management
i. During the 20th Century, floods were the number one natural disaster to cause the loss of lives and property, according to the USGS ii. Floodplain management reduces the risk of losing life or property to high water.
B. Mission Statement
…show more content…
HCAD is used for the following research:
1. Identify property legal description
2. Identify property ID number
3. Identify property improvement value
V. E-Permit
A. Assigning project to yourself
1. Sort the project queue in ascending order of submitted date
2. Projects that you are assigning to yourself should be selected from the top of the queue.
3. You may select up to 5 projects at one time if they are on different streets. If many projects are on the same street, you may select all of them at the same time.
4. Project shall not be in your queue more than (1) one business day.
5. If you have a planned absence, make sure your queue is cleared before the date of the planned absence.
B. Working Project File (the project that you are actually doing work on)
1. Review
i. Verify
a. Verify Property Information is correctly entered
b. Verify that the Property Owner Information is correctly entered.
c. Verify that the Applicant Information is correctly entered.
d. Verify that Project Details section has been populated. ii. Identify
a. By selecting the Request tab, identify what the applicant is applying for.
b. By selecting the Subdivision/Abstract tab, identify and verify the property legal description and flood zone

Related Documents

  • Improved Essays

    The Supreme Court ruled with the District Court in that the developer’s property did qualify as wetlands under the Corps’ definition and that the Corps’ acted within…

    • 704 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Although the author points out the anthropogenic factors related to the disaster, most perceived the flood as a natural event. These two themes are prominent throughout the chapter: anthropogenic structures (such as levees) impacting flooding and the economic repercussions of living in a flood-prone area.…

    • 516 Words
    • 3 Pages
    Improved Essays
  • Decent Essays

    Due to a design chance, additional land rights are needed across the Richtree Enterprises, LLC. The construction of these improvements requires the following land rights, as shown on the plat(s) attached to the enclosed agreement(s): DEDICATION FOR PUBLIC STREET PURPOSES OF 257 SQ. FT. Pursuant to Virginia Code §…

    • 243 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    A.Data Collection and Evaluation: 1.Site History There was an outburst of flood in the Community of Columbiana, SC on October 20, 2015. The town has a total area of 2.5 square miles, all land and mostly plain. Although there is vegetation on most of the area, the flood seems to have covered almost all the soil surface.…

    • 726 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    The Flood Control District’s Voluntary Home Buyout Program does not provide immediate flood recovery assistance – its primary function is to help prevent future flood damages. While some grant funds may be made available after a disaster declaration, these buyout grants do not provide immediate…

    • 436 Words
    • 2 Pages
    Improved Essays
  • Superior Essays

    Cadillac Dessert Analysis

    • 2084 Words
    • 9 Pages

    This would control the dams and reservoirs in California, but the Bureau of Reclamation eventually took over this act. Once they took over they decided to create four massive dams, spanning eighteen years in the making. Agriculture was still on the rise, especially when the land redistribution device was made, which allowed farmland to dispose and subsidized water. There were many commercial companies that used this method, some of these companies include: the DiGiorgio Corporation, the Wetland Water District, Standard Oil, J. G. Boswell Ranch Company, and many others; all of these companies owned tens of thousands of acres. A new law came out that stated all landholders with more than one hundred and sixty acres need to be sold, but many farmers did not follow this idea for it would take away land and money.…

    • 2084 Words
    • 9 Pages
    Superior Essays
  • Decent Essays

    County defenses is a plan technique that understands that physical framework can make or expand a range of fame over a property. Territoriality is an idea proposed to obviously outline a space as open, semi-open, or private space and to make suitable responsibility for space. This feeling of proprietorship, cultivates a conduct that difficulties any manhandle or undesirable acts that may happen in that space. It additionally makes a situation where outsiders or gate crashers emerge and are all the more effectively recognized.…

    • 176 Words
    • 1 Pages
    Decent Essays
  • Brilliant Essays

    Imperial Valley Oasis

    • 2519 Words
    • 11 Pages

    They sold properties acquired from the CDC’s bankruptcy to the newly formed Imperial Irrigation District (IID) in…

    • 2519 Words
    • 11 Pages
    Brilliant Essays
  • Improved Essays

    56 Floodway Regulations 56 (1) For parcels located in the floodway on which a building existed and the use of that parcel was approved as of September 9, 1985, the use may continue as a permitted or discretionary use provided that the use is listed in the land use district that the parcel is designated. (2) Subject to subsection (1), in the floodway only those permitted and discretionary uses which are listed below, and which are also listed in the land use district for which the parcel is designated, may be allowed as permitted and discretionary uses: (a) Extensive Agriculture; (b) Natural Area; (c) Outdoor Recreation Area; (d) Park; and (e) Utilities. 57 New Buildings and Alterations 57 (1) No new buildings or other new structures are allowed in the floodway, except for the replacement of existing Accessory Residential Buildings, Backyard Suites, Duplex…

    • 1930 Words
    • 8 Pages
    Improved Essays
  • Improved Essays

    Jurisdiction This paper will define jurisdiction and train investigators in the topic. The U.S. Attorney’s Office believes in training investigators in this particular subject. The power of jurisdiction granted by the U.S. Supreme Court to lower courts to hear cases.…

    • 898 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    I remember one year her basement flooded and all of her Christmas decorations got ruined. This is an issue because people like my grandmother cannot afford to buy flood insurance with good coverage. She was forced to remove everything from her basement out of fear that her belongings will get ruined again. This issue however isn’t just something she faces, some of the surrounding houses have foundation issues due to the rot from the water damage. Also tree branches often get stuck in the way of this creek, and debris begins to pile up, which ends up in my grandma’s basement.…

    • 485 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Identifying and managing risks is a critical responsibility of project managers. Risk is defined as the probability of a specified threat and the subsequent impact that the event produces (Vaidyanathan, 2013). Risks can also bring about either positive or negative outcomes for a project or organization. A project manager must identify potential risks and evaluate each one to determine the severity and likelihood of each event. Only by completing the risk management process, a project manager can determine what approach would work best to avoid, mitigate, and/or transfer the risk.…

    • 730 Words
    • 3 Pages
    Improved Essays
  • Superior Essays

    The most efficient plan for carrying out the activities is calculated and determines the timeline prior to starting work. Resources can be allocated accordingly so that each activity has proper assets when needed. Understanding of interdependent tasks can lead to possible reductions in project duration. Sub-critical tasks that are not on the longest timeline can be performed in parallel, also reducing the overall timeline of the project. Reducing Uncertainty All projects will encounter delays, unexpected issues, and surprises.…

    • 3964 Words
    • 16 Pages
    Superior Essays
  • Superior Essays

    Criteria Should Zachary use to evaluate the projects Zachary, civil engineering student, has three different projects to be executed. First is related with the improvement in the highway in front of Big John’s supermarket, second is related to repair of Elk Mountain road and third one is repair of bridge over Crockett Creek. However, due to the lack of proper resources, Zachary has to made choice regarding the priority of the projects. In this regard, he has to evaluate all the projects available on the basis of some criteria (Case Study: Transportation Improvement). Some of the crucial criteria that Zachary should use to evaluate the projects can be listed as below: 1.…

    • 1560 Words
    • 7 Pages
    Superior Essays
  • Improved Essays

    Apparently, I got the chance of working in one of the L&T’s construction project which was the “Construction of 3.5MTPA brown field cement plant”. This is the place where I have started stepping in to the world of construction & project management & while working I really felt the criticality of project management. After successful completion of my training; I was promoted as a senior engineer in Planning Department & it’s my responsibility to prepare schedules, estimation, planning & controlling of construction activities, team building, resource planning…

    • 701 Words
    • 3 Pages
    Improved Essays